Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network™

Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 163261 - 163290 of 5209455

Full-Text Articles in Entire DC Network

Equity And Diversity Minutes 08/26/2025, Equity And Diversity Committee Aug 2025

Equity And Diversity Minutes 08/26/2025, Equity And Diversity Committee

Equity and Diversity Committee

No abstract provided.


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2015, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2015, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2015 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2021. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2021_PV_existing_site_metadata.csv file for individual site metadata.


Planning Minutes 08/26/2025, Planning Committee Aug 2025

Planning Minutes 08/26/2025, Planning Committee

Planning Committee

No abstract provided.


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2013, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2013, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2013 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2017, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2017, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2017 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2020, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2020, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2020 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2015, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2015, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2015. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2015_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2016, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2016, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2016. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2016_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2017, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2017, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2017. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2017_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2019, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2019, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2019. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2019_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2020. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2020_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2021. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2021_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2013, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2013, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2013. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2013_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2020. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2020_PV_existing_site_metadata.csv file for individual site metadata.


Automated Raft Polymerization Using Batch, Increment, And Continuous Addition Modes To Enhance Properties Of Fluorescent Polymers, Sophia Beilharz, Konpal Raheja, Metin Karayilan Aug 2025

Automated Raft Polymerization Using Batch, Increment, And Continuous Addition Modes To Enhance Properties Of Fluorescent Polymers, Sophia Beilharz, Konpal Raheja, Metin Karayilan

Faculty Scholarship

We report an automated RAFT copolymerization strategy using a Chemspeed robotic platform capable of executing batch, incremental, and continuous monomer addition workflows under inert conditions. Copolymerizations of oligo(ethylene glycol) acrylate with fluorescein o-acrylate were performed in different solvents with reaction kinetics monitored via time-resolved1 H NMR spectroscopy. Continuous addition reactions conducted at rates from 0.3 to 1.0 mL/hr enabled compositional tuning and control over monomer sequence. This automated workflow has a potential to provide a high-throughput platform for polymer design, kinetic profiling, and material property optimization with minimal manual intervention.


Uncovering The Ai-Copyright Trap, Carys Craig Aug 2025

Uncovering The Ai-Copyright Trap, Carys Craig

Conference Papers

As AI tools proliferate, law and policy makers are being called upon to protect creators and the cultural industries from the extractive, exploitative, and even existential threats posed by generative AI. Professor Carys Craig warns that, in our haste to act, we risk running headlong into a copyright trap. In this presentation, Craig will explain what she means by the “AI copyright trap”, the routes by which it draws people in, and why it threatens to obstruct the path towards responsible and ethical AI. (Note: Presentation delivered online on August 26, 2025, as part of the AI Literacy Center's programming).


New Window To The Universe: Researcher To Study Gravitational Waves, Clara Turnage Aug 2025

New Window To The Universe: Researcher To Study Gravitational Waves, Clara Turnage

University of Mississippi News

OXFORD, Miss. – Sifting through the noise of space is no easy task, even for astrophysicists. But a new grant from the National Science Foundation promises to help a University of Mississippi researcher decode the sounds of the universe.


Bette Eakin V. Adams County Board Of Elections Aug 2025

Bette Eakin V. Adams County Board Of Elections

2025 Decisions

USDC for the Western District of Pennsylvania


Rashonna Ransom V. Greatplains Finance Llc Aug 2025

Rashonna Ransom V. Greatplains Finance Llc

2025 Decisions

USDC for the District of New Jersey


Estate Of John Schroeder, By And Through Dawn Tuck V. Port Authority Transit Corp Aug 2025

Estate Of John Schroeder, By And Through Dawn Tuck V. Port Authority Transit Corp

2025 Decisions

USDC for the District of New Jersey


Tim Burton V. Marc Ziegler Aug 2025

Tim Burton V. Marc Ziegler

2025 Decisions

USDC for the Western District of Pennsylvania


Are Estimands Being Correctly Used? A Review Of Uk Research Protocols, T. P. Clark, Richard H. Wicentowski, S. Cro, M. R. Sydes, B. C. Kahan Aug 2025

Are Estimands Being Correctly Used? A Review Of Uk Research Protocols, T. P. Clark, Richard H. Wicentowski, S. Cro, M. R. Sydes, B. C. Kahan

Computer Science Faculty Works

Background: The use of estimands in clinical trials was formalised with the adoption of the final International Conference on Harmonisation E9 Addendum on Estimands and Sensitivity Analysis in Clinical Trials (ICH E9(R1) Addendum) in November 2019. The declared objective of the ICH E9(R1) Addendum is to bring clarity and transparency to the research question of interest. For this to be achieved, the estimand must be described in accordance with the requirements of the ICH E9(R1) Addendum so that the target treatment effect is clear to all stakeholders. Previous reviews of publications and published protocols have found that few trials explicitly …


Asiaconnect Newsletter, August 26, 2025, Asiaconnect Aug 2025

Asiaconnect Newsletter, August 26, 2025, Asiaconnect

AsiaConnect

No abstract provided.


Decreasing Organizational Knowledge Loss With Collaborative Learning Teams, Sandy Laurence Lembree Aug 2025

Decreasing Organizational Knowledge Loss With Collaborative Learning Teams, Sandy Laurence Lembree

JWU Dissertations & Theses

Knowledge in organizations continues to be lost during attrition (Cox & Overbay, 2023). The Baby Boomers are retiring (Cox & Overbay, 2023), younger generations move (Brown, 2023), and self-interested employees hide knowledge (Ahmad & Karim, 2019; Anand et al., 2022) Collaborative learning teams (CLTs) increase knowledge transfer, which retains organizational knowledge (Ahmad & Karim, 2019). This mixed methods research was undertaken to investigate what contributors made a group in an organization into a CLT. Autonomy, competence development, group relatedness, psychological safety, shared goals and objectives, and leadership collaboration encouragement were explored for their relationships with being a CLT. Experiences were …


Joint Senate Meeting Minutes 8-26-25, Unk Student Government Aug 2025

Joint Senate Meeting Minutes 8-26-25, Unk Student Government

Joint Senate Meeting Minutes

No abstract provided.


Facpaac Minutes 08/26/2025, Faculty And P&A Affairs Committee Aug 2025

Facpaac Minutes 08/26/2025, Faculty And P&A Affairs Committee

Faculty and P&A Affairs Committee

No abstract provided.


Steering Minutes 08/26/2025, Steering Committee Aug 2025

Steering Minutes 08/26/2025, Steering Committee

Steering Committee

No abstract provided.


2025 School Of Engineering Vision Award Winners Recognized, University Of Dayton Aug 2025

2025 School Of Engineering Vision Award Winners Recognized, University Of Dayton

Blog: The Dayton Engineer

The University of Dayton School of Engineering Vision Awards recognize the innovation, creativity, entrepreneurial thinking and outstanding performance of our faculty and staff for their work as it relates to our School's values of community, innovation, excellence, and engagement and service.


Prospective Cohort Study Of Fentanyl Test Strip Use And Distribution In Three States, Janet E Childerhose, Kitty Gelberg, Rachel Vickers-Smith, Megan E Dzurec, Emmanuel Oga, Mallory Harris, Rachel Caspar, Denise C Babineau, Megan E Hall, Beth S Linas, Katherine E Marks, Amanda Fallin-Bennett, Laura C Fanucchi, Louisa Gilbert, James L David, Mary Russo, Kathryn E Lancaster, Soledad Fernandez, Michael Konstan, Redonna K Chandler, Carter Roeber, Jennifer Villani, Rebecca D Jackson, Bridget Freisthler, Sharon L Walsh, Nabila El-Bassel Aug 2025

Prospective Cohort Study Of Fentanyl Test Strip Use And Distribution In Three States, Janet E Childerhose, Kitty Gelberg, Rachel Vickers-Smith, Megan E Dzurec, Emmanuel Oga, Mallory Harris, Rachel Caspar, Denise C Babineau, Megan E Hall, Beth S Linas, Katherine E Marks, Amanda Fallin-Bennett, Laura C Fanucchi, Louisa Gilbert, James L David, Mary Russo, Kathryn E Lancaster, Soledad Fernandez, Michael Konstan, Redonna K Chandler, Carter Roeber, Jennifer Villani, Rebecca D Jackson, Bridget Freisthler, Sharon L Walsh, Nabila El-Bassel

Epidemiology and Environmental Health Faculty Publications

BACKGROUND: The Stay Safe Study is the first observational prospective cohort study investigating fentanyl test strip (FTS) use by people who use drugs (PWUD) and distribution by community organizations that provide harm reduction services (e.g., naloxone distribution) in three states (Kentucky, New York, and Ohio). The purpose of this paper is to describe the study design, along with implementation successes and challenges. A related goal is to provide recommendations and encourage researchers to undertake multi-state and multilevel studies of FTS use and distribution.

METHODS: The Stay Safe Study has one primary, five secondary, and three exploratory objectives. From May-December 2023, …