Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 146581 - 146610 of 5153635

Full-Text Articles in Entire DC Network

Equity And Diversity Minutes 08/26/2025, Equity And Diversity Committee Aug 2025

Equity And Diversity Minutes 08/26/2025, Equity And Diversity Committee

Equity and Diversity Committee

No abstract provided.


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2015, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2015, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2015 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2021. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2021_PV_existing_site_metadata.csv file for individual site metadata.


Planning Minutes 08/26/2025, Planning Committee Aug 2025

Planning Minutes 08/26/2025, Planning Committee

Planning Committee

No abstract provided.


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2013, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2013, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2013 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2017, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2017, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2017 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2020, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2020, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2020 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2015, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2015, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2015. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2015_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2016, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2016, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2016. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2016_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2017, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2017, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2017. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2017_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2019, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2019, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2019. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2019_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2020. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2020_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2021. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2021_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2013, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2013, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2013. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2013_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2020. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2020_PV_existing_site_metadata.csv file for individual site metadata.


Morphology And Distribution Of Lakes Under The Laurentide Ice Sheet: Implications For Ice Flow Dynamics, Sarah M. Principato, Carissa Mobley Aug 2025

Morphology And Distribution Of Lakes Under The Laurentide Ice Sheet: Implications For Ice Flow Dynamics, Sarah M. Principato, Carissa Mobley

Environmental Studies Faculty Publications

This study examines the distribution and morphology of lakes under the Laurentide Ice Sheet (LIS) to investigate relationships with ice flow velocity, bedrock and basal thermal regime. Palaeo-ice streams and lobes were important components of the LIS, and properties of lakes in those regions are quantified at high resolution. Lake polygon shapefiles obtained from the HydroLAKES database contain data including water depth, volume and elevation. ArcGIS Pro is used to measure lake area, length, width, elongation, orientation, parallel conformity, density and packing. Approximately 982 282 natural lakes were identified in the region of North America covered by the maximum extent …


Criminal Adult Perceptions Of Transition Services Following Histories Of Physical Abuse As Children, Kimberlyn Sherie Crook Aug 2025

Criminal Adult Perceptions Of Transition Services Following Histories Of Physical Abuse As Children, Kimberlyn Sherie Crook

Walden Dissertations and Doctoral Studies

It is possible that childhood abuse and neglect could be linked to adult crime and delinquency. Intervention services' apparent ineffectiveness worries social workers, law enforcement, and policymakers. The literature found that abused children are more likely to commit crimes as adults without intervention and prevention, which harms society and abused children. Research suggests child abuse and adult crime may have early roots. The purpose of this qualitative study was to address adult victims firsthand accounts to identify intervention service gaps and suggest improvements. The qualitative design was used to address adult criminals who were abused as children and their unique …


Uncovering The Ai-Copyright Trap, Carys Craig Aug 2025

Uncovering The Ai-Copyright Trap, Carys Craig

Conference Papers

As AI tools proliferate, law and policy makers are being called upon to protect creators and the cultural industries from the extractive, exploitative, and even existential threats posed by generative AI. Professor Carys Craig warns that, in our haste to act, we risk running headlong into a copyright trap. In this presentation, Craig will explain what she means by the “AI copyright trap”, the routes by which it draws people in, and why it threatens to obstruct the path towards responsible and ethical AI. (Note: Presentation delivered online on August 26, 2025, as part of the AI Literacy Center's programming).


August 26, 2025 Nagpra And Tribal Relations Committee Meeting Minutes, Bryan Morey Aug 2025

August 26, 2025 Nagpra And Tribal Relations Committee Meeting Minutes, Bryan Morey

University NAGPRA and Tribal Relations Committee

August 26, 2025 minutes for the WKU NAGPRA and Tribal Relations Committee meeting. Meeting conducted via Zoom.


Quantum Error Correction: Studying Correlated Errors On Surface Codes, Reu/Fri Program Physics And Astronomy, Pritesh Thakur Aug 2025

Quantum Error Correction: Studying Correlated Errors On Surface Codes, Reu/Fri Program Physics And Astronomy, Pritesh Thakur

Student Works

No abstract provided.


Bette Eakin V. Adams County Board Of Elections Aug 2025

Bette Eakin V. Adams County Board Of Elections

2025 Decisions

USDC for the Western District of Pennsylvania


Rashonna Ransom V. Greatplains Finance Llc Aug 2025

Rashonna Ransom V. Greatplains Finance Llc

2025 Decisions

USDC for the District of New Jersey


Estate Of John Schroeder, By And Through Dawn Tuck V. Port Authority Transit Corp Aug 2025

Estate Of John Schroeder, By And Through Dawn Tuck V. Port Authority Transit Corp

2025 Decisions

USDC for the District of New Jersey


Tim Burton V. Marc Ziegler Aug 2025

Tim Burton V. Marc Ziegler

2025 Decisions

USDC for the Western District of Pennsylvania


Are Estimands Being Correctly Used? A Review Of Uk Research Protocols, T. P. Clark, Richard H. Wicentowski, S. Cro, M. R. Sydes, B. C. Kahan Aug 2025

Are Estimands Being Correctly Used? A Review Of Uk Research Protocols, T. P. Clark, Richard H. Wicentowski, S. Cro, M. R. Sydes, B. C. Kahan

Computer Science Faculty Works

Background: The use of estimands in clinical trials was formalised with the adoption of the final International Conference on Harmonisation E9 Addendum on Estimands and Sensitivity Analysis in Clinical Trials (ICH E9(R1) Addendum) in November 2019. The declared objective of the ICH E9(R1) Addendum is to bring clarity and transparency to the research question of interest. For this to be achieved, the estimand must be described in accordance with the requirements of the ICH E9(R1) Addendum so that the target treatment effect is clear to all stakeholders. Previous reviews of publications and published protocols have found that few trials explicitly …


A New Exit: The Impact Of Historical Play Adaptations On Modern Audiences, Karli Jean Lonnquist Aug 2025

A New Exit: The Impact Of Historical Play Adaptations On Modern Audiences, Karli Jean Lonnquist

SURF Posters and Papers

Contemporary theatrical adaptation involves deconstructing, reimagining, and rewriting historical plays for modern audiences. Adaptation appropriates theatrical conventions, changes the lens through which the audience may view the play, and offers new entry points into thinking and practice. Adaptation asks, “why this source as theatre now?” and proposes that history provides tools for engagement with contemporary issues. By employing a Practice as Research (PaR) methodology, I will investigate the art of historical adaptation and adapt No Exit, a 1945 existentialist play by Jean-Paul Sartre, through the lenses of constructivism and performance studies. I will develop my script through collaborative workshops, stage …


Asiaconnect Newsletter, August 26, 2025, Asiaconnect Aug 2025

Asiaconnect Newsletter, August 26, 2025, Asiaconnect

AsiaConnect

No abstract provided.


Exploring The Causal Links Between Esg, R&D, And Firm Performance: Evidence From The Us Technology And Food Companies, Semra Boga, Gozde Bozkurt, Hasan Sadik Tatli, Tom Gillpatrick Aug 2025

Exploring The Causal Links Between Esg, R&D, And Firm Performance: Evidence From The Us Technology And Food Companies, Semra Boga, Gozde Bozkurt, Hasan Sadik Tatli, Tom Gillpatrick

Business Faculty Publications and Presentations

This study examines the causal relationships between ESG (Environmental, Social, and Governance) compliance, R&D expenditures, and financial performance in the technology and food sectors in the US. A panel dataset from 2012 – 2021 from the Thomson Reuters database was analysed for 12 food and 18 technology companies. The findings show that there are different causal relationships between sectors. While R&D investments in the technology sector positively affect firm performance by increasing ESG compliance, firm performance in the food sector directs ESG compliance, encouraging R&D investments. The study emphasizes that sectoral differences should be considered in sustainability and R&D strategies …


Bridging The Gap: A Cross-Unit Approach To Thermoregulation In A Large Pediatric Hospital, Isabelle Hernandez, Hernandez Velasco, Samuel Casu, Angel Castillo, Loree Sword, Noe Garcia Aug 2025

Bridging The Gap: A Cross-Unit Approach To Thermoregulation In A Large Pediatric Hospital, Isabelle Hernandez, Hernandez Velasco, Samuel Casu, Angel Castillo, Loree Sword, Noe Garcia

2024

No abstract provided.


Decreasing Organizational Knowledge Loss With Collaborative Learning Teams, Sandy Laurence Lembree Aug 2025

Decreasing Organizational Knowledge Loss With Collaborative Learning Teams, Sandy Laurence Lembree

JWU Dissertations & Theses

Knowledge in organizations continues to be lost during attrition (Cox & Overbay, 2023). The Baby Boomers are retiring (Cox & Overbay, 2023), younger generations move (Brown, 2023), and self-interested employees hide knowledge (Ahmad & Karim, 2019; Anand et al., 2022) Collaborative learning teams (CLTs) increase knowledge transfer, which retains organizational knowledge (Ahmad & Karim, 2019). This mixed methods research was undertaken to investigate what contributors made a group in an organization into a CLT. Autonomy, competence development, group relatedness, psychological safety, shared goals and objectives, and leadership collaboration encouragement were explored for their relationships with being a CLT. Experiences were …