Implications Of Microplastic Pollution For The Conservation Of Marine Protected Areas, 2024 Florida International University
Implications Of Microplastic Pollution For The Conservation Of Marine Protected Areas, Estefany D. Carvajal, Amanda Di Perna, Alain Duran
FIU Undergraduate Research Journal
Marine Protected Areas (MPAs) function as a tool for the protection and conservation of marine ecosystems. These designated areas should be free of any environmentally harmful pollutants. Microplastics (MPs) are plastic fragments measuring less than 5 mm (about 0.2 in). These fragments are an emerging threat to our oceans, and we are investigating the effectiveness of MPAs against these pollutants. We analyzed data gathered from research conducted on microplastic concentrations in MPAs and non-MPAs around the world. 53 MPAs and 53 non-MPAs around the world were used and the microplastic concentrations were deemed low, medium, or high by using the …
Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50, 2024 Montana Tech Library
Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50, Atlantic Richfield Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp) (Dated March 8, 2024), 2024 Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp) (Dated March 8, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Repository Screening Report, 2024 Montana Tech Library
Final Repository Screening Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit Repository Screening Report, 2024 Montana Tech Library
Final Butte Priority Soils Operable Unit Repository Screening Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Bpsou Subdrain Data Summary Report (Dsr), 2024 Montana Tech Library
Draft Final 2023 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Do Heat Waves Drive Natural Selection In Damselflies?, 2024 University of Arkansas, Fayetteville
Do Heat Waves Drive Natural Selection In Damselflies?, Adam Baranyk
Biological Sciences Undergraduate Honors Theses
Climate change has led to changes in both mean temperatures and temperature extremes over the recent years. These changes have had differential effects on animals throughout the world. Ectotherms depend on their external environment for thermal regulation, making them especially susceptible to temperature extremes. It is not yet clear whether there is a relationship between physical traits in ectotherms, and survivorship throughout a heat wave. That is, whether or not temperature extremes driven survival selection. In this study, a heat wave was simulated artificially using thermally regulated mesocosms at different temperatures (18°C, 22° C, 26° C, 30° C) with a …
Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), 2024 Montana Tech Library
Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), 2024 Montana Tech Library
Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, 2024 Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, 2024 Montana Tech Library
Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, 2024 Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, 2024 Montana Tech Library
Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Berkely Pit Repository Cost Comparison, 2024 Management Service Company, ARCO
Berkely Pit Repository Cost Comparison, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., 2024 Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, 2024 Management Service Company, ARCO
Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, 2024 Management Service Company, ARCO
Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After The Bell Child Care Center, Thomas J. Beckman, Christopher Berg, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, 2024 Montana Tech Library
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.