Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 481 - 510 of 7791

Full-Text Articles in Environmental Health and Protection

Development And Evaluation Of Supported Ionic Liquid Membrane And Porphyrin Frameworks For Carbon Capture Separation, Sarang Ismail Aug 2025

Development And Evaluation Of Supported Ionic Liquid Membrane And Porphyrin Frameworks For Carbon Capture Separation, Sarang Ismail

Dissertations and Doctoral Documents, University of Nebraska-Lincoln, 2023–

The global urgency to mitigate anthropogenic CO₂ emissions has intensified the pursuit of energy-efficient separation technologies. Supported Ionic Liquid Membranes (SILMs) have emerged as promising candidates for CO₂ capture due to their tunable solubility-selectivity and low energy requirements. However, challenges such as mechanical instability, limited scalability, and trade-offs in transport performance have impeded their widespread adoption.

This thesis explores a systematic approach to designing and optimizing SILMs for enhanced CO₂ separation by tailoring polymer–ionic liquid interactions, processing conditions, and material architectures. A comprehensive set of studies were conducted using poly(vinylidene fluoride) (PVDF) with varying molecular weights, different grades of PEBAX®, …


Highly Contaminated Sediments From The Gowanus Canal (New York) Superfund Site: An Environmental Forensic Approach, Michael A. Kruge, Kevin K. Olsen, Eric A Stern, Maria Mastalerz, Albert Permanyer Jul 2025

Highly Contaminated Sediments From The Gowanus Canal (New York) Superfund Site: An Environmental Forensic Approach, Michael A. Kruge, Kevin K. Olsen, Eric A Stern, Maria Mastalerz, Albert Permanyer

Department of Earth and Environmental Studies Faculty Scholarship and Creative Works

The 2.5 km long Gowanus Canal (Brooklyn, NY, USA) is a severely contaminated urban waterway dating from the mid-19th century, listed as a US Environmental Protection Agency (USEPA) Superfund site since 2010. Applying an environmental forensics approach to the extensive USEPA data set, we detect systematic variations in parent PAH ring number distributions in the canal sediments, as well as an extraordinary enrichment in organic carbon. We subjected a supplemental sample set to a more detailed analysis by quantitative pyrolysis-GC-MS, Rock-Eval pyrolysis, and organic petrology. With these sensitive methods, we can confirm the alkyl-PAH fingerprint of coal tar (a legacy …


Re: Comment Letter For Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan Revision 01 (Dated June 6, 2025), Emma Rott Jul 2025

Re: Comment Letter For Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan Revision 01 (Dated June 6, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Uniform Federal Policyquality Assurance Project Plan, Hydrogeologic, Inc. Jul 2025

Revised Draft Final Uniform Federal Policyquality Assurance Project Plan, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – June 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Jul 2025

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – June 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Detection Of Oil Pollution On The Tigris River In Iraq Using Fluorescence And Reflecting Techniques, Ahmad K. Ahmad, Thamer M. Mohammed Jul 2025

Detection Of Oil Pollution On The Tigris River In Iraq Using Fluorescence And Reflecting Techniques, Ahmad K. Ahmad, Thamer M. Mohammed

Karbala International Journal of Modern Science

In this study, a broadband light source (visible and ultraviolet) was used to name minerals via fluorescence spectra and estimate slick oil thickness, ranging from sub-millimetres, using the reflecting spectrum technique. Using a fluorescent technique, we obtained fluorescence spectra of the samples, converting and processing the signals to produce high-resolution data, which enabled the identification of the types of dissolved elements and oil slicks in the Tigris River, highlighting pollution sources and potential control measures. This system aims to show the faint signal in fluorescence samples collected from the cooling system outlet water throughout the refining process from AL-Dora (Baghdad) …


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report (Dated April 8, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report (Dated April 8, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sampling: Bres No. 84 Site Evaluation Summary Report (Dated April 11, 2025), Molly Roby Jul 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sampling: Bres No. 84 Site Evaluation Summary Report (Dated April 11, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-22 Site Evaluation Summary Report (Dated April 2, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-22 Site Evaluation Summary Report (Dated April 2, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated April 1, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated April 1, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Uncontrolled Surface Flow Areas Drainage C 30% Design Rawp (Dated June 23, 2025), Molly Roby Jul 2025

Re: Comment Letter For Bpsou Uncontrolled Surface Flow Areas Drainage C 30% Design Rawp (Dated June 23, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Valley Sand & Gravel (Builders Firstsource) Borrow Submittal #1 (Dated June 27, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Valley Sand & Gravel (Builders Firstsource) Borrow Submittal #1 (Dated June 27, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated May 13, 2025), Emma Rott Jul 2025

Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated May 13, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated March 19, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated March 19, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: June 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Jul 2025

Re: June 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Groundwater Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott Jul 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Groundwater Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson Jul 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Zambia's Poor Septic Waste Management: A Disaster In Waiting, Andrew Mwape Jul 2025

Zambia's Poor Septic Waste Management: A Disaster In Waiting, Andrew Mwape

School of Natural Resources: Faculty Publications

In the shadows of Zambia’s rapidly growing urban and peri-urban communities lies an invisible but mounting threat, the mismanagement of septic waste. While national dialogue often focuses on economic development, climate change, or energy, the sanitation crisis receives little public attention, yet it poses an equally severe risk to public health, environmental integrity, and sustainable urbanization. Zambia’s poor septic waste management, if left unaddressed, is a disaster in waiting.

Septic waste refers to the wastewater and solid waste that flows from toilets, sinks, and other domestic plumbing fixtures into on-site sanitation systems such as septic tanks or pit latrines. This …


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling Bres No. 30 – Atlantic 1 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling Bres No. 30 – Atlantic 1 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Post-Wildfire Erosion And Sedimentation: An Escalating Threat For Utah Fisheries, Colton James, Kendall Becker, Scott Hotaling, Aish Chandrasekaran, Alex Fiedler, Timothy E. Walsworth, Patrick Belmont Jul 2025

Post-Wildfire Erosion And Sedimentation: An Escalating Threat For Utah Fisheries, Colton James, Kendall Becker, Scott Hotaling, Aish Chandrasekaran, Alex Fiedler, Timothy E. Walsworth, Patrick Belmont

All Current Publications

Wildfires are a natural part of the western U.S. landscape and provide numerous benefits, including enhanced nutrient cycling and habitat rejuvenation. Utah’s fish populations evolved with wildfire as a common disturbance. However, the increasing size and severity of wildfires, combined with Utah’s heavily engineered and fragmented stream networks, pose a contemporary risk to fish populations. This fact sheet reviews wildfire impacts on erosion and Utah's watersheds and fisheries. It outlines measures we can take to prevent post-wildfire fish die-offs.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (December 31, 2024), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (December 31, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 32 Site Evaluation Summary Report (Dated December 11, 2024), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 32 Site Evaluation Summary Report (Dated December 11, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Integrating Belowground Recovery Into Tropical Forest Restoration Design And Monitoring, Lauren Toro, Leland K. Werden, Shalom D. Addo-Danso, Kelly M. Andersen, Sarah Batterman, Matilde M. Bragadini, Pooja Choksi, Rebecca J. Cole, Liza S. Comita, Daniela Cusack, Daisy H. Dent, Lee H. Dietterich, Joshua B. Fisher, Katrin Fleischer, Lucia Fuchslueger, Nohemi Huanca-Nunez, Janey R. Lienau, Lindsay A. Mcculloch, Ember M. Morrissey, Jennifer S. Powers, Mareli Sánchez-Juliá, Oscar Valverde-Barrantes, Anita Weissflog, Michelle Y. Wong Jul 2025

Integrating Belowground Recovery Into Tropical Forest Restoration Design And Monitoring, Lauren Toro, Leland K. Werden, Shalom D. Addo-Danso, Kelly M. Andersen, Sarah Batterman, Matilde M. Bragadini, Pooja Choksi, Rebecca J. Cole, Liza S. Comita, Daniela Cusack, Daisy H. Dent, Lee H. Dietterich, Joshua B. Fisher, Katrin Fleischer, Lucia Fuchslueger, Nohemi Huanca-Nunez, Janey R. Lienau, Lindsay A. Mcculloch, Ember M. Morrissey, Jennifer S. Powers, Mareli Sánchez-Juliá, Oscar Valverde-Barrantes, Anita Weissflog, Michelle Y. Wong

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

There is growing recognition that tropical forest restoration is key for sequestering carbon and enhancing ecosystem resilience. Soils, roots, and soil biota are central to ecosystem function and services, but belowground recovery is largely overlooked in restoration monitoring frameworks. Here, we outline current understanding of the links between above- and belowground recovery in tropical forests by examining how belowground properties before and after intervention influence recovery; by evaluating whether aboveground recovery can serve as a proxy for belowground dynamics; and by proposing a blueprint for monitoring dynamic soil physical (bulk density, aggregate stability), chemical (organic matter or carbon, pH), and …


One Year Of Analysis Of Pfas Contamination In Surface Waters Of The West Plains Region Of Spokane County, Jerusha R. Hampson Jul 2025

One Year Of Analysis Of Pfas Contamination In Surface Waters Of The West Plains Region Of Spokane County, Jerusha R. Hampson

2025 Symposium

The West Plains has been significantly impacted by PFAS contamination due to the decades-long use of aqueous film-forming foam (AFFF) for firefighting training at both Fairchild Air Force Base (FAFB) and the Spokane International Airport (SIA). Groundwater contamination is significant, but less work had been done to understand contamination in surface waters. We now have over a year of data with most locations were sampled seasonally. Though FAFB and SIA are likely sources for some of the contamination, other, smaller sources exist. Surface waters are important to study as they form the boundaries of the West Plains and often function …


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed (Ur) Sites Ur-13 Site Evaluation Summary Report (Sesr) (November 1, 2024), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed (Ur) Sites Ur-13 Site Evaluation Summary Report (Sesr) (November 1, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For 2024 Annual Operations And Maintenance Report Butte Reclamation Evaluation System (Bres) Annual Summary Report For Work Completed In Quadrant 4 (Dated May 1, 2025), Molly Roby Jul 2025

Re: Comment Letter For 2024 Annual Operations And Maintenance Report Butte Reclamation Evaluation System (Bres) Annual Summary Report For Work Completed In Quadrant 4 (Dated May 1, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Response To Comment Letter And The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Both Dated June 6, 2025), Molly Roby Jul 2025

Re: Approval Letter For The Response To Comment Letter And The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Both Dated June 6, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Revised Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated June 4, 2025), Molly Roby Jul 2025

Re: Approval Of The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Revised Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated June 4, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Backfill And Cover Material Quality Assurance Project Plan (Dated September 27, 2024), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Backfill And Cover Material Quality Assurance Project Plan (Dated September 27, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Measuring And Mapping Spatial Distributions Of Soil Lead Concentrations Across An Urban-To-Rural Gradient In Chicagoland, Lulia Woldemicael, Andrea Stoeva Jul 2025

Measuring And Mapping Spatial Distributions Of Soil Lead Concentrations Across An Urban-To-Rural Gradient In Chicagoland, Lulia Woldemicael, Andrea Stoeva

DePaul Discoveries

Lead (Pb), a highly toxic chemical has found its way into many aspects of our communities through a plethora of different pathways such as paint, gasoline, and industrial activity. Exposure to lead poses harmful risks to all age groups as a higher blood lead level is associated with higher mortality. Although actions have been taken to eliminate lead from the atmosphere, it remains in the environment, especially accumulating in urban areas where the use of automobiles and highly industrialized landscapes are prevalent. This study examines the soil lead concentrations along an urban-to-rural gradient connecting Humboldt Park, Skokie, and Buffalo Grove, …