Open Access. Powered by Scholars. Published by Universities.®

Groundwater

Discipline
Institution
Publication Year
Publication
Publication Type

Articles 1 - 30 of 163

Full-Text Articles in Environmental Health and Protection

Evaluating Groundwater Vulnerability In A Rapidly Urbanizing City: Implications For Cholera And Dysentery Outbreaks, Samuel Multiti Jan 2028

Evaluating Groundwater Vulnerability In A Rapidly Urbanizing City: Implications For Cholera And Dysentery Outbreaks, Samuel Multiti

Academic Affairs

Many regions in the world, especially sub-Saharan Africa, continue to face the challenge of reliable access to safe drinking water. This project aims to investigate drinking water quality, focusing on groundwater from both planned and peri-urban residential neighborhoods, as well as the geological and hydrogeological factors contributing to groundwater vulnerability in Lusaka, Zambia. This study will examine several key water quality parameters including microplastics, pathogen contamination (E. coli, total coliforms, Vibrio cholera, E. histolytica, Shigella, Salmonella and Campylobacter), nitrate concentrations, and metals, all of which are common contaminants that can have adverse health effects and negatively …


Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc. Oct 2026

Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated July 31, 2026), Emma Rott Oct 2026

Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated July 31, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026), Emma Rott Oct 2026

Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc. Sep 2026

Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran Sep 2026

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc. Jun 2026

Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc. May 2026

Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area (Ctcwma) Remedy Effectiveness Evaluation Phase I (Conceptual Site Model) (Dated February 27, 2026), Emma Rott May 2026

Re: Comment Letter For Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area (Ctcwma) Remedy Effectiveness Evaluation Phase I (Conceptual Site Model) (Dated February 27, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc. May 2026

Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operation And Maintenance Report: Butte Treatment Lagoons (Btl) System– Fourth Quarter 2025 (Dated March 30, 2026), Emma Rott May 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operation And Maintenance Report: Butte Treatment Lagoons (Btl) System– Fourth Quarter 2025 (Dated March 30, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott Apr 2026

Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott Apr 2026

Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc. Apr 2026

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc. Apr 2026

Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc. Apr 2026

Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc. Mar 2026

Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc. Mar 2026

Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc. Mar 2026

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Repository Siting Study (Rss) Detailed Evaluation And Recommendations Report, Atlantic Richfield Company, Butte Silver Bow Feb 2026

Final Repository Siting Study (Rss) Detailed Evaluation And Recommendations Report, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2020 Groundwater Compliance And Interpretation Technical Memorandum (Dated May 12, 2022, Josh Bryson Feb 2026

Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2020 Groundwater Compliance And Interpretation Technical Memorandum (Dated May 12, 2022, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025) Received May 7, 2025, Josh Bryson Feb 2026

Response To Agency Comments Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025) Received May 7, 2025, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comment Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Josh Bryson Feb 2026

Response To Agency Comments Re: Comment Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (Pdi) Evaluation Report (Dated September 12, 2025), Emma Rott Jan 2026

Re: Conditional Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (Pdi) Evaluation Report (Dated September 12, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.