Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 451 - 480 of 7790

Full-Text Articles in Environmental Health and Protection

Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025), Emma Rott Aug 2025

Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc. Aug 2025

Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott Aug 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2025

Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler Aug 2025

Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2025

Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report, Mark Thompson, Dave Griffis Aug 2025

Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty Aug 2025

Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Revised Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty Aug 2025

Re: Revised Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty Aug 2025

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter With Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Annual Operations And Maintenance (O&M) Butte Treatment Lagoons (Btl) System 2024 (Dated May 30, 2025), Emma Rott Aug 2025

Re: Approval Letter With Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Annual Operations And Maintenance (O&M) Butte Treatment Lagoons (Btl) System 2024 (Dated May 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Aug 2025

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


How Effective Is HawaiʻS'S Sunscreen Ban? Tourism Impact On The Health Of KauaʻI'S Coral Reefs, Meghan E. Parker Aug 2025

How Effective Is HawaiʻS'S Sunscreen Ban? Tourism Impact On The Health Of KauaʻI'S Coral Reefs, Meghan E. Parker

Capstone Collection

This study seeks to determine whether the level of human-impact, and in particular sunscreen use, influences the health of coral reefs on the island of Kauaʻi. Six paired sites in different regions of Kauaʻi were identified, each having a human-impacted site and an isolated counterpart site. By obtaining quantitative data on the coral reef at each site using 25-meter video transects, the overall health of the reef was assessed by measuring live coral cover, coral species abundance, prevalence of coral bleaching, and fish abundance. The level of human-impact in the form of number of people present and type of sunscreen …


Sustainability: Buzz Word Or Future Of Fashion? Measuring The Feasibility Of Outright Sustainability Among Fast Fashion’S Biggest Agents, Ryan Miller Aug 2025

Sustainability: Buzz Word Or Future Of Fashion? Measuring The Feasibility Of Outright Sustainability Among Fast Fashion’S Biggest Agents, Ryan Miller

Apparel Merchandising and Product Development Undergraduate Honors Theses

Abstract


The fashion industry is currently experiencing unsustainable rates of pollution within its supply chains. The rapid increase in demand for short lead times perpetrated by large-scale retailers has led to hazardous practices negatively affecting both the environmental conditions and working conditions of producing countries. With this increased pressure, relationships between brands and suppliers have become untenable. Limited transparency and imbalanced power dynamics at the hand of the industry’s leading retailers require restructuring in order to build more sustainable and equitable supply-chain practices. Further, governmental regulation is currently limited in its capacity to enforce sustainable business practices on a global …


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


What's The Value Of A State? Accounting For The Ecosystem Services And Natural Capital Of Oregon, Kathryn Liebrecht Aug 2025

What's The Value Of A State? Accounting For The Ecosystem Services And Natural Capital Of Oregon, Kathryn Liebrecht

University Honors Theses

Ecosystem services are vital to human welfare and society, but often are overlooked when it comes to planning and setting policy. By neglecting to incorporate the benefits received from natural resources, policy makers may unknowingly be making decisions that harm the long term sustainability and use of these services. To highlight the importance of Oregon's ecosystems, the present study aims to provide a full accounting of the ecosystem services and natural capital of the state. Using data from the Institute for Natural Resources' updated Oregon statewide habitat map, Oregon's ecosystems were matched to biome categories from the Ecosystem Services Valuation …


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Multi-Crop Systems And Crop-Switching Strategies To Enhance Water Use Efficiency And Climate Resilience In Arid Agricultural Regions, Shahryar Fazli, Wenzhao Li, Surendra Maharjan, Hesham El-Askary Aug 2025

Multi-Crop Systems And Crop-Switching Strategies To Enhance Water Use Efficiency And Climate Resilience In Arid Agricultural Regions, Shahryar Fazli, Wenzhao Li, Surendra Maharjan, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Agriculture in the Lower Colorado River (LCR) region faces mounting challenges from climate change, arid conditions, and water scarcity. This study evaluates water use efficiency (WUEc) and crop-switching strategies under SSP2-4.5 and SSP5-8.5 scenarios for 2025–2049, 2050–2074, and 2075–2099. Using historical data, climatic drivers such as temperature and precipitation were analyzed for their influence on key crops, including durum wheat, winter wheat, and corn. Results show SSP2-4.5 supports water use reductions up to 16%, stable profits (80–90%), and modest calorie increases (up to 15%), while SSP5-8.5 poses severe challenges, with water use reductions of 2–5%, profits dropping to around 20%, …


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.