Open Access. Powered by Scholars. Published by Universities.®
Environmental Health and Protection Commons™
Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 30 of 101
Full-Text Articles in Environmental Health and Protection
Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Temporary Best Management Practices Work Plan: Bres No. 16 – Curry And Bres No. 50 – Zelia, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed (IR) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on August 12, 2022, at the IR source area Butte Reclamation Evaluation System (BRES) No. 16 – Curry Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) required further evaluation of this IR Site since reclamation was conducted in 1991, prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (EPA, 2020) and because the Site did not meet BRES requirements during the 2017 assessment performed by the Clark Fork Watershed …
Draft Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Temporary Best Management Practices Work Plan: Bres No. 16 – Curry And Bres No. 50 – Zelia, Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Temporary Best Management Practices Work Plan: Bres No. 16 – Curry And Bres No. 50 – Zelia, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated June 24, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sampling: Bres No. 84 Site Evaluation Summary Report (Dated April 11, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Dated May 27, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Josephine Shaft (Ir-37) Remedial Action Work Plan (Rawp) (Dated February 6, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites: Bres No. 158 (Waste Rock Dump) Remedial Action Work Plan (Rawp), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Bpsou Insufficiently Reclaimed Sites Josephine Shaft (Ir-37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Draft Final Bpsou Insufficiently Reclaimed Sites Josephine Shaft (Ir-37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01, Revision 1 (Dated December 13, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-02, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Revision 1, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.