Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1921 - 1950 of 7791

Full-Text Articles in Environmental Health and Protection

Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc. Aug 2022

Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Pilot Study: Geoenvironmental Controls Of Residential Radon Cedar Falls, Iowa, Maya Mallavarapu, Chad Heinzel Ph.D. Jul 2022

Pilot Study: Geoenvironmental Controls Of Residential Radon Cedar Falls, Iowa, Maya Mallavarapu, Chad Heinzel Ph.D.

Summer Undergraduate Research Program (SURP) Symposium

  • The leading cause of lung-cancer for individuals who do not smoke is exposure to abnormally high radon concentrations. If radon concentrations within a person’s basement is above 4 pCi/L, the EPA recommends further testing and possible decontamination of the area to mitigate one’s exposure to radon.
  • Radon is a radioactive gas that originates from the decay series of Uranium-238. The decay series begins with Uranium-238 and finishes with an end product of Lead-206. However, during this decay process before Lead-206 is culminated, intermediates such as Uranium-234, Thorium-230, Radium-226, and Radon-222 are also produced


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exploring New Methods For Quantifying Soil Reduction, Redox Potential, And Iron Reducing Bacteria Using The Iris Method In Wetland Soils., Jessica Everett Jul 2022

Exploring New Methods For Quantifying Soil Reduction, Redox Potential, And Iron Reducing Bacteria Using The Iris Method In Wetland Soils., Jessica Everett

Biology Theses

The presence of hydric soils is one of the key factors used to identify and delineate wetlands as specified by the United States Fish and Wildlife Service (USFWS). The Indicator of Reduction in Soil (IRIS) Method, accepted by the National Technical Committee for Hydric Soils (NTCHS) can indicate iron reduction in soil which can identify hydric soil for wetland delineation efforts. This thesis was conducted to see if the IRIS method had potential for other uses such as quantifying relative measurements of iron reducing bacteria and to see if a colorimetric scale could be curated to bring less subjection to …


Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jul 2022

Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike Mcanulty Jul 2022

Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty Jul 2022

Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene Jul 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Jul 2022

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2022

Draft Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill (Dated July 14, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill (Dated July 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene Jul 2022

Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline., Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Draft Final 2021 Unreclaimed Site Investigation: Xrf To Laboratory Correlation And Regression Analyses Procedure (Dated May 16, 2022), Nikia Greene Jul 2022

Comment Letter For The Draft Final 2021 Unreclaimed Site Investigation: Xrf To Laboratory Correlation And Regression Analyses Procedure (Dated May 16, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Response To Agency Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021; Dated April 8, 2022. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Jul 2022

Re: Response To Agency Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021; Dated April 8, 2022. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Jul 2022

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Reduction Works (Brw) Phase I Qapp, Pioneer Technical Services, Inc., Nikia Greene Jul 2022

Final Butte Reduction Works (Brw) Phase I Qapp, Pioneer Technical Services, Inc., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2021, Pioneer Technical Services, Inc. Jul 2022

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2021, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 13, 2022), Nikia Greene Jul 2022

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 13, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Wildfire Risk In Mountain West States, 2017-2021, Olivia K. Cheche, Corryn Richardson, Zachary Billot, Miguel Soriano Ralston, Vanessa Booth, Caitlin J. Saladino, William E. Brown Jr. Jul 2022

Wildfire Risk In Mountain West States, 2017-2021, Olivia K. Cheche, Corryn Richardson, Zachary Billot, Miguel Soriano Ralston, Vanessa Booth, Caitlin J. Saladino, William E. Brown Jr.

Environment

This fact sheet examines data on wildfire destruction in the Mountain West states of Arizona, Colorado, Nevada, New Mexico, and Utah. The original report from the Insurance Information Institute presents findings on percent of properties at risk of wildfire destruction, the number of wildfires by state, and numbers of acres burned per state.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Environment And Sustainability: July 2022, Environment And Sustainability, Office Of The President Jul 2022

Environment And Sustainability: July 2022, Environment And Sustainability, Office Of The President

Environment and Sustainability Archives

• UC Nairobi getting EDGE Advanced certified

• The President’s blog contemplates on our sustainability responsibility

• Donated electric bikes reduce emissions and local air pollution

• Impact of Earth Day and World Environment Day activities

• Related events from across the university.