Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1951 - 1980 of 7791

Full-Text Articles in Environmental Health and Protection

Draft Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jul 2022

Draft Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Residential Metals Abatement Program (Rmap) (Non- Residential Parcels) Data Summary Report (Dsr) (Dated April 19, 2022), Nikia Greene Jul 2022

Comments For The Draft Final Residential Metals Abatement Program (Rmap) (Non- Residential Parcels) Data Summary Report (Dsr) (Dated April 19, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Local And State Climate Initiatives In Louisiana Since 2005: Content And Thematic Analyses, Jessie F. Parrott Jul 2022

Local And State Climate Initiatives In Louisiana Since 2005: Content And Thematic Analyses, Jessie F. Parrott

LSU Master's Theses

Louisiana is uniquely exposed to severe weather because of its geography and climate. Louisiana’s extreme weather is exacerbated by anthropogenic climate change, which will worsen in the future. The risks its population and environment are exposed to has generated several policies and planning documents, nine of which are analyzed in this thesis. Three plans are from the state level, three are from the parish level, and three are from the urban (New Orleans) level. These planning documents pose various adaptation and mitigation actions to ameliorate and address multiple climate issues. These actions utilize specific mitigation strategies. The content and thematic …


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 158 – Waste Rock Dump (Dated June 20, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 158 – Waste Rock Dump (Dated June 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump (Dated June 23, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump (Dated June 23, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Reduction Works (Brw) Phase Ii Qapp, Nikia Greene, Pioneer Technical Services, Inc. Jul 2022

Final Butte Reduction Works (Brw) Phase Ii Qapp, Nikia Greene, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Revised Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Revised Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Revised Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Revised Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Jul 2022

Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit Butte Treatment Lagoons And Bpsou Subdrain Sampling And Monitoring Quality Assurance Project Plan, Nikia Greene, Pioneer Technical Services, Inc. Jul 2022

Revised Draft Final Butte Priority Soils Operable Unit Butte Treatment Lagoons And Bpsou Subdrain Sampling And Monitoring Quality Assurance Project Plan, Nikia Greene, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc. Jul 2022

Draft Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Btc Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Qapp, Nikia Greene, Pioneer Technical Services, Inc. Jul 2022

Btc Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Qapp, Nikia Greene, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Monitoring Whitebark Pine Stand Health In The Central Washington Cascades, Nancy H. Parra, Teresa J. Lorenz, Taza D. Schaming, Alison Scoville Jul 2022

Monitoring Whitebark Pine Stand Health In The Central Washington Cascades, Nancy H. Parra, Teresa J. Lorenz, Taza D. Schaming, Alison Scoville

Student Published Works

Whitebark pine (Pinus albicaulis) plays a vital role in colonizing newly disturbed areas, providing shade for other tree species to germinate, and supplying food for a variety of birds and mammals, such as Clark’s Nutcrackers (Nucifraga columbiana) and grizzly bears (Ursus arctos horribilis). Decline of whitebark pine populations has been attributed to several factors, including white pine blister rust (Cronartium ribicola), mountain pine beetle (Dendroctonus ponderosae) outbreaks, and fire exclusion. In 2009, the U.S. Forest Service began to install permanent plots in whitebark pine stands in Washington and Oregon as …


Appendix B - Data Validation Reports, Pioneer Technical Services, Inc. Jul 2022

Appendix B - Data Validation Reports, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Appendix D Laboratory Analytical Full Data Packages, Pace Analytical Services Jul 2022

Appendix D Laboratory Analytical Full Data Packages, Pace Analytical Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

Final Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 50 – Zelia (Dated June 22, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 50 – Zelia (Dated June 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps (Dated June 20, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps (Dated June 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump (Dated June 23, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump (Dated June 23, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Nikia Greene Jun 2022

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 4, 2022), Nikia Greene Jun 2022

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Assessing The Human-Health Risk Of Exposure To Pathogens From Beach Sands, Javier Federico Gallard-Góngora Jun 2022

Assessing The Human-Health Risk Of Exposure To Pathogens From Beach Sands, Javier Federico Gallard-Góngora

USF Tampa Graduate Theses and Dissertations

Fecal contamination at recreational beaches impacts the health of beachgoers, through the introduction of disease-causing microorganisms, and the well-being of communities dependent on income from recreational beach activities. Beach ecosystems are also impacted by sewage through the introduction of nutrients that can cause abnormal increases in autochthonous microorganisms which can impact the population of larger organisms in the ecosystem. Fecal contamination is introduced into sand via untreated sewage, direct deposition of human feces into sand, runoff, and deposition of animal feces into sand. The introduction of fecal contamination into sand exposes individuals to pathogens (disease causing microorganisms) which can result …


Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp, Pioneer Technical Services, Inc. Jun 2022

Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene, Pioneer Technical Services, Inc. Jun 2022

Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval On The Draft Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Piezometer Installation And Monitoring Well Repair Plan (Dated June 10, 2022), Nikia Greene Jun 2022

Approval On The Draft Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Piezometer Installation And Monitoring Well Repair Plan (Dated June 10, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union, Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame- Sage], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union, Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame- Sage], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc. Jun 2022

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 - Final Revised - Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jun 2022

2022 - Final Revised - Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclaimed Areas Maintenance And Monitoring Plan (Dated June 15, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclaimed Areas Maintenance And Monitoring Plan (Dated June 15, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.