Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026).,
2026
Environmental Protection Agency
Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Quantifying Terrain Controls On Satellite-Based Snow Water Equivalent Estimation: A Spatially Explicit Machine Learning Approach,
2026
University of Denver
Quantifying Terrain Controls On Satellite-Based Snow Water Equivalent Estimation: A Spatially Explicit Machine Learning Approach, Brant Giovannetti
Geography and the Environment: Graduate Student Capstones
Terrain variables are widely incorporated into machine learning Snow Water Equivalent (SWE) models but are rarely evaluated for their independent contribution relative to spectral predictors. Using a four-tier stepwise Random Forest framework with Harmonized Landsat Sentinel-2 imagery and Airborne Snow Observatory LiDAR ground truth, this study isolates the contribution of elevation, slope, northness, and eastness across Peak and Ablation snowpack regimes in the East Taylor River Watershed, Colorado. During peak snowpack, adding terrain improved R² by 0.214, with elevation alone accounting for 42.8% of model importance. During ablation, full-dataset terrain gains were modest, increasing R² by only 0.036. However, when …
Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For First Quarter 2026 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026).,
2026
Environmental Protection Agency
Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For First Quarter 2026 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoon (Btl) System Annual Report – 2025 (Dated May 11, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoon (Btl) System Annual Report – 2025 (Dated May 11, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Desert Dichotomies: Climatic Imaginaries Of The Arid+[Ant]Arctic,
2026
University of Texas at Arlington
Desert Dichotomies: Climatic Imaginaries Of The Arid+[Ant]Arctic, Amanda Aman
Mavs Open Press Open Educational Resources
Desert Dichotomies is a research-based architecture design studio that examines the impacts of climate change across arid and polar desert environments, revealing unexpected parallels between landscapes often understood as environmental opposites. Focusing on Antarctica, Arctic Alaska and the Sonoran Desert, the project investigates how climate change, resource extraction and human systems of control are transforming ecological processes, water systems and cultural landscapes. While arid deserts face increasing drought and water scarcity, polar deserts are experiencing accelerated warming, ice loss, permafrost thaw and flooding. Despite these contrasting conditions, both regions exhibit similar consequences, including declining water quality, biodiversity loss, infrastructural vulnerability …
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: New And Mahoney (Ur-23) Construction Completion Report (Ccr),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: New And Mahoney (Ur-23) Construction Completion Report (Ccr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp),
2026
Environmental Protection Agency
Re: Conditional Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Site Specific Corrective Action Plans For Quadrant 2,
2026
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Site Specific Corrective Action Plans For Quadrant 2, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Construction Completion Report (Ccr),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Construction Completion Report (Ccr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated May 8, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated May 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Assessing Indoor Heat Vulnerability And Cooling Strategies In Three Mobile Home Communities In Boulder, Colorado, Usa,
2026
City University of New York
Assessing Indoor Heat Vulnerability And Cooling Strategies In Three Mobile Home Communities In Boulder, Colorado, Usa, Mehdi P. Heris, Skye Niles, Alana Wilson, Megan Mccurdy, Amy Lacourse, Nick Lankau
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Extreme heat is an increasing public health and environmental threat shaped by both physical and social factors. This study assesses the vulnerability of mobile homes and their residents at three mobile home parks in Boulder, Colorado. We examined indoor temperature, housing conditions, and social and personal risk factors of the households. We monitored indoor and outdoor temperatures using 27 indoor and 5 outdoor temperature data loggers, comparing mobile homes with air conditioning, swamp coolers, and passive cooling designs. This work provides a detailed analysis of indoor temperature patterns and demonstrates how evaluating trends yields insights into the performance and effectiveness …
Rfc - Request For Information - Waste Rock Dump Stormwater Runoff Collection System Substitution,
2026
Environmental Protection Agency
Rfc - Request For Information - Waste Rock Dump Stormwater Runoff Collection System Substitution, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Western Kentucky University Stormwater Utility Survey 2026,
2026
Civil Engineering
Western Kentucky University Stormwater Utility Survey 2026, Warren Campbell
SEAS Faculty Publications
In the U.S., more than 2200 stormwater utilities have been enacted. This year, we have expanded the survey to include stormwater utilities in other countries. Many of these stormwater assessments are called taxes, but if the assessment is recurring, is not an ad valorem tax, and is dedicated to stormwater purposes, we call it a stormwater utility. With the help of ChatGPT we have been able to identify 25 stormwater fees in Australia. We were also able to identify 3 in New Zealand, and some in Europe as well.
Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr),
2026
Montana Tech Library
Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026,
2026
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025,
2026
Montana Tech Library
Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp),
2026
Montana Tech Library
Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.