Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated August 14, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated August 14, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) Revision 0 (2026) Request For Change (Rfc)-2026-001 (Dated September 8, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) Revision 0 (2026) Request For Change (Rfc)-2026-001 (Dated September 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Final Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated September 8, 2026) And The 2026 Final Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated September 8, 2026),
2026
Environmental Protection Agency
Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Final Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated September 8, 2026) And The 2026 Final Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated September 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Uncontrolled Surface Flow Areas Drainage C 95% Design Remedial Action Work Plan,
2026
Environmental Protection Agency
Re: Approval Letter For The Uncontrolled Surface Flow Areas Drainage C 95% Design Remedial Action Work Plan, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Multi-Temporal Satellite Observations And Machine Learning-Based Flood Susceptibility Assessment Of The 2025 Punjab Flood,
2026
Banaras Hindu University
Multi-Temporal Satellite Observations And Machine Learning-Based Flood Susceptibility Assessment Of The 2025 Punjab Flood, Ankush Kumar, Ashwani Raju, Saraah Imran, Ramesh P. Singh
Mathematics, Physics, and Computer Science Faculty Articles and Research
Over the past decade, the Punjab plains of Northern India have experienced recurrent flooding driven by hydroclimatic variability, specifically shifts in western disturbances that have intensified monsoon precipitation. Following a devastating flood in 2025, the region remains highly vulnerable to hydrological extremes, a risk further exacerbated by shifting land use and agricultural patterns, geomorphic parameters, and complex fluvial systems. This study assesses flood susceptibility by integrating multi-sensor satellite observations, multi-temporal Sentinel-1 backscatter signals, and refined runoff potential estimates derived from local climate zones, accounting for land cover, soil type, and infiltration characteristics, into machine learning frameworks. The model is trained …
Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025,
2026
Montana Tech Library
Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-42 Site Evaluation Summary Report (Sesr) (Dated July 22, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-42 Site Evaluation Summary Report (Sesr) (Dated July 22, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit, Draft Final Unreclaimed Sites: Ur-31 Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit, Draft Final Unreclaimed Sites: Ur-31 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) Dated August 26, 2026,
2026
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) Dated August 26, 2026, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate 90,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate 90, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance,
2026
Management Service Company, ARCO
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill,
2026
Atlantic Richfield Company
Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine,
2026
Atlantic Richfield Company
Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill,
2026
Atlantic Richfield Company
Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Broadening The Community Of Nudibranch Enthusiasts Through Multilingual Educational Programming To Increase Climate Advocacy Engagement,
2026
Chapman University
Broadening The Community Of Nudibranch Enthusiasts Through Multilingual Educational Programming To Increase Climate Advocacy Engagement, Richelle Li Tanner, Cintya Felix Mendivil, Ashley Lam, Lorena Muñoz, Micah Kim, Elena G. Morales Poot, Gabrielle Keeler-May
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Environmental literacy and advocacy for environmental protections are essential components of responsible stewardship. For coastal communities, stewardship requires knowledge of ocean processes and the biological communities living within these ecosystems. While many studies highlight difficulties in engaging American audiences in environmental concern and stewardship due to hyper-individualistic societal values, tidepooling is one recreational pathway to coastal community engagement that strengthens sense of place, and therefore, responsibility to protect natural resources. We sought to broaden the tidepooling community to include more diverse voices through a participatory science program with inland city-dwelling, multilingual, and non-English speaking adults. Using nudibranchs as an environmental …
Re: Request For Change To The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2026 Update),
2026
Management Service Company, ARCO
Re: Request For Change To The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2026 Update), Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
