Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment Commons™

Open Access. Powered by Scholars. Published by Universities.®

6,788 Full-Text Articles 9,107 Authors 2,419,846 Downloads 197 Institutions

All Articles in Environmental Indicators and Impact Assessment

Faceted Search

6,788 full-text articles. Page 7 of 273.

Ecorxchoice.Com— An Sidp-Funded Calculator Integrating Environmental Metrics With Antimicrobial Stewardship, Pamela S. Lee, Hugh Gordon, Theresa Ferguson, Tien Dinh, Misty Vu, Marina Nguyen, Chaynor Hsiao, Gary Fong 2026 University of California, Los Angeles

Ecorxchoice.Com— An Sidp-Funded Calculator Integrating Environmental Metrics With Antimicrobial Stewardship, Pamela S. Lee, Hugh Gordon, Theresa Ferguson, Tien Dinh, Misty Vu, Marina Nguyen, Chaynor Hsiao, Gary Fong

Pharmacy Faculty Articles and Research

Healthcare sustainability is a multidisciplinary field that seeks to mitigate healthcare’s environmental consequences. Antimicrobial stewardship and healthcare sustainability both aim to reduce wasteful resource use while maximizing patient safety. However, a strong partnership between antimicrobial stewardship and healthcare sustainability has yet to develop. To facilitate environmentally sustainable decision-making in antimicrobial prescribing, we developed a web-based calculator (EcoRxChoice (www.ecorxchoice.com)) where users can enter different antimicrobial regimens and compare how much plastic waste each regimen creates. This work was supported in part by the Society of Infectious Diseases Pharmacists (SIDP), reflecting SIDP’s commitment to strengthening sustainability as a practical extension of antimicrobial …


Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department of Reclamation and Environmental Services 2026 Montana Tech Library

Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike McAnulty, Eric Hassler 2026 Atlantic Richfield Company

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. 2026 Montana Tech Library

2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Coastal Flood Risk In New Hampshire: The Latest Science (2025), Lisa Wise, Hannah Volk, Kirsten Howard 2026 NH Sea Grant

Coastal Flood Risk In New Hampshire: The Latest Science (2025), Lisa Wise, Hannah Volk, Kirsten Howard

UNH Cooperative Extension

This document provides a two-page summary of the NH Coastal Flood Risk Summary, Part I: Science report, which was updated in 2025.


Riesgo De Inundaciones Costeras En New Hampshire: La Ciencia Más Reciente (2025), Lisa Wise, Hannah Volk, Kirsten Howard 2026 NH Sea Grant

Riesgo De Inundaciones Costeras En New Hampshire: La Ciencia Más Reciente (2025), Lisa Wise, Hannah Volk, Kirsten Howard

UNH Cooperative Extension

Este documento resume el informe "Resumen del Riesgo de Inundaciones Costeras de NH, Parte I: Ciencia," actualizado en 2025.


Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott 2026 Environmental Protection Agency

Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Concealed History Of Microplastic Pollution In The Msimbazi Estuary, Dar Es Salaam, Tanzania, Dativa J. Shilla 2026 Dar es Salaam University College of Education, University of Dar es Salaam

Concealed History Of Microplastic Pollution In The Msimbazi Estuary, Dar Es Salaam, Tanzania, Dativa J. Shilla

Tanzania Journal of Science

This study reconstructed the historical deposition of microplastics in sediments of the Msimbazi Estuary, Tanzania, using a radiometrically dated sediment core. Sediment chronology established using ²¹⁰Pb and the Constant Initial Concentration (CIC) model provided an approximately 83-year depositional record. The ²¹⁰Pb age model suggested marked temporal variability in sedimentation rates, with peaks around 1961, 1998, 2013, and 2015, potentially reflecting hydrological extremes and catchment disturbances. Anthropogenic microparticles were detected throughout most of the sediment core, with concentrations ranging from below detection limit (BDL) to 34 items kg⁻¹ dry weight (mean 8.5 ± 3.2 items kg⁻¹), and their abundance generally increased …


Re: Conditional Approval Letter For The Final Silver Bow Creek Conservation Area Materials Management Plan (Dated May 28, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Conditional Approval Letter For The Final Silver Bow Creek Conservation Area Materials Management Plan (Dated May 28, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated May 28, 2026) And The Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated May 28, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Conditional Approval Letter For The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated May 28, 2026) And The Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated May 28, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan (Dated May 29, 2006), Emma Rott 2026 Environmental Protection Agency

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan (Dated May 29, 2006), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Third Butte Rmap Biomonitoring (Phase 3) Report, Ramboll, Atlantic Richfield Company 2026 Montana Tech Library

Third Butte Rmap Biomonitoring (Phase 3) Report, Ramboll, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Butte Priority Soils Operable Unit Draft Final Leak Detection Monitoring Plan (Dated May 13, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Conditional Approval Letter For Butte Priority Soils Operable Unit Draft Final Leak Detection Monitoring Plan (Dated May 13, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 1, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 1, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Trophic Transfer Of Fluorescent Polyethylene Microplastics In A Simplified Artemia–Oreochromis Aquatic Food Chain, Dativa J. Shilla 2026 Dar es Salaam University College of Education, University of Dar es Salaam

Trophic Transfer Of Fluorescent Polyethylene Microplastics In A Simplified Artemia–Oreochromis Aquatic Food Chain, Dativa J. Shilla

Tanzania Journal of Science

Microplastics (MPs) are pervasive contaminants in aquatic ecosystems, yet experimental evidence of their trophic transfer within tropical African food webs remains scarce. This study provides experimental evidence of indirect trophic transfer of microplastics from Artemia salina to Oreochromis urolepis, a cichlid species of ecological and economic importance in African inland and coastal waters. A simplified two-level food chain was established by exposing A. salina nauplii to fluorescent polyethylene microplastics (10–20 µm; 1, 10, and 100 mg L⁻¹) and subsequently feeding them to juvenile O. urolepis under controlled laboratory conditions. These concentrations were selected to represent a range of exposure levels …


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Intermediate (60%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated March 13, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Intermediate (60%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated March 13, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Effects Of Changing Fire Regimes On Black Huckleberry Habitat Suitability, Emily LaBarge 2026 Portland State University

Effects Of Changing Fire Regimes On Black Huckleberry Habitat Suitability, Emily Labarge

University Honors Theses

Black huckleberries are a significant cultural, ecological, and economic species in the Pacific Northwest. Historically, black huckleberries were tended with cultural fire by Indigenous peoples, and now also hold importance as a resource in the non-timber forest product economy. Research has begun on the impacts of climate change on suitable black huckleberry habitat and on changing fire regimes, but not in relation to each other. To address this gap, I examined the area of overlap between suitable black huckleberry habitat and fire burn probability into mid-century climate projections. I determined the current ownership entities with management jurisdiction in areas with …


Digital Commons powered by bepress