Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr),
2026
Montana Tech Library
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Type B Borrow Material Submittal #3 (Dated May 6, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Type B Borrow Material Submittal #3 (Dated May 6, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026),
2026
Environmental Protection Agency
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2026
Management Service Company, ARCO
Re: Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal,
2026
Montana Tech Library
Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Evaluating Soil Health And Crop Yield In Louisiana Agricultural Systems: Impacts Of Best Management Practices And Prediction Models,
2026
Louisiana State University and Agricultural and Mechanical College
Evaluating Soil Health And Crop Yield In Louisiana Agricultural Systems: Impacts Of Best Management Practices And Prediction Models, Hector J. Mendoza Lagos
LSU Doctoral Dissertations
The adoption of conservation management practices is critical for improving soil health, enhancing nutrient use efficiency, and sustaining crop productivity in row crop systems in Louisiana. This study evaluated the role of conservation agronomic practices, soil biochemical indicators, and machine learning predictive models to improve soil nutrient dynamics, soil health indicators, microbial communities (MC), and crop productivity on a corn (Zea mays L.) research plot scale and in a commercial forty-hectare cotton (Gassypium hirsutum L.)-corn-soybean (Glycine max L.) rotation system in northeast Louisiana. The objectives of the study were to evaluate soil nutrient dynamics and MCs under …
Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 1st Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2026
Management Service Company, ARCO
Re: 1st Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Conservation Area Approved Final Principles For A Greener Cleanup Report,
2026
Montana Tech Library
Silver Bow Creek Conservation Area Approved Final Principles For A Greener Cleanup Report, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Butte Reduction Works Smelter Area Intermediate 60% Remedial Design Submittal,
2026
Montana Tech Library
Butte Priority Soils Operable Unit Butte Reduction Works Smelter Area Intermediate 60% Remedial Design Submittal, Pioneer Technical Services, Inc., Atlantic Richfield Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Subject: Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 And First Quarter 2026 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2026
Management Service Company, ARCO
Subject: Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 And First Quarter 2026 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp),
2026
Montana Tech Library
2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Urban Conflagrations: Structural Ash And Soil Metal(Loid) Contamination After California’S Eaton And Palisades Fires,
2026
Duke University
Urban Conflagrations: Structural Ash And Soil Metal(Loid) Contamination After California’S Eaton And Palisades Fires, S. Anselme Dossou, Leon Kelly, P. Louis Lu, Robin Jones, Oliver O'Donnell, Justin St. P. Walsh, Daniel D. Richter
Art Faculty Articles and Research
In the weeks after California’s Eaton-Palisades wildfires, structural ash of burned homes and soils from yards and curbsides were sampled for analysis of Pb, As, and eight metals from 32 burned residences. About six months after fires and after US Army Corps of Engineers’ Phase 2 cleanups removed 15 cm from structural ash footprints, 17 properties were resampled within about a meter of original sampling sites. Concentrations of metal(oid)s in structural ash and residential soils varied between and within properties with significant spatial and temporal patterns. Lead concentrations were highest in structural ash and soil of yards of select pre-1970s …
Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025,
2026
Montana Tech Library
Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Solid Waste Management In Greater Khartoum City, Sudan,
2026
Fordham University
Solid Waste Management In Greater Khartoum City, Sudan, Roba Mahmoud
Student Theses 2015-Present
This study investigates the rising solid waste management (SWM) dilemma in Greater Khartoum City (GKC), a critical environmental and public health issue caused by fast urbanization and inadequate infrastructure, with historical linkages to Sudan's colonial and postcolonial growth. Chapter 1 describes the current problem using quantitative and qualitative data, demonstrating that GKC produces approximately 3,340 tons of waste each day, with 56% organic matter, 8% plastics, and 16% paper. Collection efficiency remains severely poor, at 31.5%. Informal recyclers known as Nakasha or Barkata collect approximately 7% of total waste, supporting roughly 3,900 people, whereas filthy open dumps and unsorted medical …
Re: Comment Letter For Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area (Ctcwma) Remedy Effectiveness Evaluation Phase I (Conceptual Site Model) (Dated February 27, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area (Ctcwma) Remedy Effectiveness Evaluation Phase I (Conceptual Site Model) (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
