Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 661 - 690 of 7791

Full-Text Articles in Environmental Health and Protection

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated December 10, 2024), Emma Rott Feb 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated December 10, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – January 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Feb 2025

Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – January 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated December 30, 2024), Emma Rott Feb 2025

Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated December 30, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson Feb 2025

Re: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc. Feb 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Residential Parcels), Pioneer Technical Services, Inc. Feb 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: January 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Feb 2025

Re: January 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 30 – Atlantic 1 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2025

Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 30 – Atlantic 1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Draft Final Phase I Design Investigation Evaluation Report And Response To Comments, Blacktail Creek Riparian Actions (Dated January 24, 2025), Emma Rott Feb 2025

Re: Comment Letter For Bpsou Draft Final Phase I Design Investigation Evaluation Report And Response To Comments, Blacktail Creek Riparian Actions (Dated January 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2025

Silver Bow Creek Butte Area Npl Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (Dated January 31, 2025), Emma Rott Feb 2025

Re: Comment Letter For Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (Dated January 31, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2025

Re: Silver Bow Creek Butte Area Npl Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dated January 3, 2025), Emma Rott Feb 2025

Re: Comment Letter For The Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dated January 3, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Blacktail Creek Groundwater Hydraulic Control System Preliminary 30% Remedial Design Report (Dated October 28, 2024), Emma Rott Feb 2025

Re: Comment Letter For Draft Blacktail Creek Groundwater Hydraulic Control System Preliminary 30% Remedial Design Report (Dated October 28, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Butte School District No. 1 (West Elementary School And Butte High School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Feb 2025

Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Butte School District No. 1 (West Elementary School And Butte High School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Feb 2025

2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2024 Fourth Quarter Report, Mark Thompson, Dave Griffis Feb 2025

Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2024 Fourth Quarter Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Materials Management Plan (Dated November 21, 2024), Emma Rott Feb 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Materials Management Plan (Dated November 21, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson Feb 2025

Silver Bow Creek Butte Area Npl Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson Feb 2025

Re: Silver Bow Creek Butte Area Npl Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report East Middle School, Environmental Resource Management (Erm) Feb 2025

Residential Metals Abatement Program Construction Completion Report East Middle School, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance, Josh Bryson Feb 2025

Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Feb 2025

2025 Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 158 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 158 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Insufficiently Reclaimed Sites Josephine Shaft (Ir-37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Feb 2025

Draft Final Bpsou Insufficiently Reclaimed Sites Josephine Shaft (Ir-37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Removal Sign Off Individual Site Work Plans 2025 Round 2 Rmap Basement Projects Butte, Mt 59701 January 31, 2025, Butte-Silver Bow Department Of Reclamation And Environmental Services, Atlantic Richfield Company Jan 2025

Final Removal Sign Off Individual Site Work Plans 2025 Round 2 Rmap Basement Projects Butte, Mt 59701 January 31, 2025, Butte-Silver Bow Department Of Reclamation And Environmental Services, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.