Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 361 - 390 of 7791

Full-Text Articles in Environmental Health and Protection

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc. Oct 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Dramatic Biases In Terrestrial Nitrogen Fixation In Earth System Models Revealed By Natural Isotope Signatures, Maoyuan Fang, Shushi Peng, Philippe Ciais, Daniel S. Goll, Benjamin Z. Houlton, Ying-Ping Wang, Yilong Wang, Pan Liu, Joshua B. Fisher, Pierre Regnier Oct 2025

Dramatic Biases In Terrestrial Nitrogen Fixation In Earth System Models Revealed By Natural Isotope Signatures, Maoyuan Fang, Shushi Peng, Philippe Ciais, Daniel S. Goll, Benjamin Z. Houlton, Ying-Ping Wang, Yilong Wang, Pan Liu, Joshua B. Fisher, Pierre Regnier

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Biological nitrogen fixation (BNF) is the primary input of new reactive nitrogen to natural terrestrial ecosystems. However, this flux is poorly constrained due to its unclear drivers and associated control mechanisms. Here, we extend the existing theory of nitrogen (N) isotope mass balance to estimate BNF rates and then use a Bayesian approach to constrain the BNF rates in natural terrestrial ecosystems by using measurements of natural N-isotope ratios (δ15N) in plants (δP) and soil (δS). Together with pairwise δP and δS measurements from 18 forest sites covering diverse climates and thousands …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott Oct 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) And Response To Epa Comments. (Dated September 16, 2025), Emma Rott Oct 2025

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) And Response To Epa Comments. (Dated September 16, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Protocol For Assessing And Managing Radon Gas Exposure Risks In Caves: A Case Study Of Altamira And Paleolithic Cave Art Of Northern Spain World Heritage Site, Sergio Sanchez-Moral, Javier Lario, Soledad Cuezva, Juan Carlos Cañaveras, Tamara Martín-Pozas, Angel Fernández-Cortés Oct 2025

Protocol For Assessing And Managing Radon Gas Exposure Risks In Caves: A Case Study Of Altamira And Paleolithic Cave Art Of Northern Spain World Heritage Site, Sergio Sanchez-Moral, Javier Lario, Soledad Cuezva, Juan Carlos Cañaveras, Tamara Martín-Pozas, Angel Fernández-Cortés

International Journal of Speleology

Exposure to radon and its progeny poses a significant health risk for workers in tourist caves. Implementing protective measures is challenging due to increasingly strict gas concentration and dose limits in new regulations. This study evaluates the annual effective radiation doses received by workers and researchers, considering seasonal and spatial radon variability. Radon levels, temperature, and ventilation patterns were continuously monitored for at least one year in each cave. Results show significant radon fluctuations influenced by seasonal ventilation regimes driven by thermal gradients between the cave and external atmosphere. Using International Commission on Radiological Protection guidelines, the study calculates the …


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson Oct 2025

Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Park Reclamation: Tackling Invasive Species At The Oconee River Greenway In Milledgeville, Ga, Christine Mutiti Oct 2025

Park Reclamation: Tackling Invasive Species At The Oconee River Greenway In Milledgeville, Ga, Christine Mutiti

Academic Affairs

This project focused on the ecological restoration of a kudzu-invaded section of the Oconee River Greenway while integrating high-impact learning into the Environmental Methods and Measurements (ENSC 2000) course at GCSU. Kudzu (Pueraria montana), a Category I invasive species, has significantly disrupted native plant communities at the site, making it an ideal setting for applied learning and ecological intervention. The project engaged students in authentic environmental research by involving them in every stage of the process including problem assessment, methodology design, field implementation, data collection, and reflection.

Students initiated the first phase of invasive plant removal using mechanical …


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran Oct 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott Oct 2025

Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Oct 2025

Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Oct 2025

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2025 Residential Metals Abatement Program (Rmap) Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Final 2025 Residential Metals Abatement Program (Rmap) Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Ur- 19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel (Dated August 13, 2025), Molly Roby Oct 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Ur- 19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel (Dated August 13, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield, Mike Mcanulty Oct 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated September 30, 2025), Emma Rott Oct 2025

Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated September 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.