Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 2341 - 2370 of 7899

Full-Text Articles in Environmental Health and Protection

Epa Region 8 Qa Document Review Crosswalk, Nikia Greene Nov 2021

Epa Region 8 Qa Document Review Crosswalk, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Trec Inc., A Woodard And Curran Company Nov 2021

2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), 11/16/21, Nikia Greene Nov 2021

Silver Bow Creek/Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), 11/16/21, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene Nov 2021

Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Nov 2021

Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Trec Inc., A Woodard And Curran Company Nov 2021

2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10587273 Edd, Pioneer Technical Services, Inc. Nov 2021

10587273 Edd, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10586986 Edd, Pioneer Technical Services, Inc. Nov 2021

10586986 Edd, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For: Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels), Atlantic Richfield Company And Butte- Silver Bow County, Dated October 8, 2021, Nikia Greene Nov 2021

Comments For: Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels), Atlantic Richfield Company And Butte- Silver Bow County, Dated October 8, 2021, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Bolstering Juliana: Enforceability Of Environmental Claims Through International Treaty Obligations In U.S. Courts, Lindsey Laielli Nov 2021

Bolstering Juliana: Enforceability Of Environmental Claims Through International Treaty Obligations In U.S. Courts, Lindsey Laielli

St. Mary's Law Journal

Abstract forthcoming.


Approved Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Field Sampling Plan (Fsp) Package #6: Ur‐05, Ur‐27, Ur‐28, Ur‐29, Ur‐30, And Ur‐34, Mike Mcanulty Nov 2021

Approved Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Field Sampling Plan (Fsp) Package #6: Ur‐05, Ur‐27, Ur‐28, Ur‐29, Ur‐30, And Ur‐34, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Computational Simulation Of The Lung Doses Of Air-Borne Fine And Ultrafine Particles Inhaled By Humans At Industrial Workplaces, Mohammed Ali Nov 2021

Computational Simulation Of The Lung Doses Of Air-Borne Fine And Ultrafine Particles Inhaled By Humans At Industrial Workplaces, Mohammed Ali

Technology Faculty Publications and Presentations

This study correlates computational predictions with in-vivo experimental results of inhaled fine and ultrafine particulate matters (PMs) transport, dissemination, and deposition in the human respiratory airways. Epidemiological studies suggest that workplace exposure of anthropogenic pollutant PMs as a risk factor for increased susceptibility to acute broncho-pulmonary infections. However, investigations on detailed human inhalation and PM transport processes are restrictive from time, cost, and ethical perspectives. To overcome this problem, computational simulation of particle deposition based on the Multiple Path Particle Dosimetry (MPPD) model was employed. Here, the physical, mechanical, and electrical properties of PMs of carbon black and nanoparticles from …


Epa Region 8 Qa Document Review Crosswalk, Trec Inc., A Woodard And Curran Company, Nikia Greene Nov 2021

Epa Region 8 Qa Document Review Crosswalk, Trec Inc., A Woodard And Curran Company, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10586986 Edd, Pioneer Technical Services, Inc. Nov 2021

10586986 Edd, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Feasibility Of Development Of Flood Resiliency Clearinghouse Program, Commonwealth Center For Recurrent Flooding Resiliency, Mujde Erten-Unal, Carol Considine, Mark W. Luckenbach, Elizabeth Armistead Andrews Nov 2021

Feasibility Of Development Of Flood Resiliency Clearinghouse Program, Commonwealth Center For Recurrent Flooding Resiliency, Mujde Erten-Unal, Carol Considine, Mark W. Luckenbach, Elizabeth Armistead Andrews

Commonwealth Center for Recurrent Flooding Resiliency (CCRFR): Reports

[Introduction]

House Bill 2187i, introduced by Delegate Keith Hodges in the 2021 session of the Virginia General Assembly, directed the Commonwealth Center for Recurrent Flooding Resiliency (CCRFR), a partnership between Old Dominion University, the Virginia Institute of Marine Science (VIMS) and the William & Mary Law School’s Virginia Coastal Policy Center (VCPC) established by Virginia Chapter 440 of the 2016 Acts of Assembly (HB 903), to evaluate the development of a Flood Resiliency Clearinghouse Program (henceforth Clearinghouse). The bill stipulated that the Center should work with the Department of Conservation and Recreation (DCR) to evaluate solutions that manage …


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Atlantic Richfield Company Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Design & Remedial Action, The Langdon Group, Inc., Atlantic Richfield Company Nov 2021

Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Design & Remedial Action, The Langdon Group, Inc., Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


An Assessment Of Nutrient Improvement In Surface Water Due To The Conversion Of Onsite Sewage Treatment And Disposal Systems To Sewerage, Jenelle A. Mohammed Oct 2021

An Assessment Of Nutrient Improvement In Surface Water Due To The Conversion Of Onsite Sewage Treatment And Disposal Systems To Sewerage, Jenelle A. Mohammed

USF Tampa Graduate Theses and Dissertations

Florida represents approximately 12% of all onsite sewage treatment and disposal systems (OSTDS) in the United States. Properly designed, constructed and maintained OSTDS are effective eco- friendly alternatives for the treatment of domestic wastewater from households not serviced by public sewer systems. However, conventional OSTDS are not designed to effectively remove nitrogen. If installed and improperly used, they may contribute other pollutants. OSTDS have also been linked to degraded water quality in some regions. However, it has been difficult to quantify OSTDS impacts on water quality because of various confounding factors such as point and non-point sources of nutrient input. …


Radiocarbon Analyses Quantify Peat Carbon Losses With Increasing Temperature In A Whole Ecosystem Warming Experiment, Rachel M. Wilson, Natalie A. Griffiths, Ate Visser, Karis J. Mcfarlane, Stephen D. Sebestyen, Keith C. Oleheiser, Samantha Bosman, Anya M. Hopple, Malak M. Tfaily, Randall K. Kolka, Paul J. Hanson, Joel E. Kostka, Scott D. Bridgham, Jason K. Keller, Jeffrey P. Chanton Oct 2021

Radiocarbon Analyses Quantify Peat Carbon Losses With Increasing Temperature In A Whole Ecosystem Warming Experiment, Rachel M. Wilson, Natalie A. Griffiths, Ate Visser, Karis J. Mcfarlane, Stephen D. Sebestyen, Keith C. Oleheiser, Samantha Bosman, Anya M. Hopple, Malak M. Tfaily, Randall K. Kolka, Paul J. Hanson, Joel E. Kostka, Scott D. Bridgham, Jason K. Keller, Jeffrey P. Chanton

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Climate warming is expected to accelerate peatland degradation and release rates of carbon dioxide (CO2) and methane (CH4). Spruce and Peatlands Responses Under Changing Environments is an ecosystem-scale climate manipulation experiment, designed to examine peatland ecosystem response to climate forcings. We examined whether heating up to +9 °C to 3 m-deep in a peat bog over a 7-year period led to higher C turnover and CO2 and CH4 emissions, by measuring 14C of solid peat, dissolved organic carbon (DOC), CH4, and dissolved CO2 (DIC). DOC, a major substrate for heterotrophic respiration, increased significantly with warming. There was no 7-year trend …


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Oct 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


First Quarter Data Sheets - Event Log, Chem Dump, Field Dump, Etc., Atlantic Richfield Company Oct 2021

First Quarter Data Sheets - Event Log, Chem Dump, Field Dump, Etc., Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Oct 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 104 - Colorado Dump And Response To Comments, Mike Mcanulty Oct 2021

Butte Priority Soils Operable Unit (Bpsou) Revised Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 104 - Colorado Dump And Response To Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Attachment D To The Dsr; Work Order 10577874, 10584152 Edd, Pioneer Technical Services, Inc. Oct 2021

Attachment D To The Dsr; Work Order 10577874, 10584152 Edd, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Comments To The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Draft Final Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17, Mike Mcanulty Oct 2021

Response To Comments To The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Draft Final Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.