Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 151 - 180 of 7898

Full-Text Articles in Environmental Health and Protection

Expression Levels Of Heat Shock Protein 72 And Their Correlation With Biomarkers Of Renal Function Among Hispanic Construction Workers Exposed To Ambient Heat In El Paso, Texas, Maria Fuentes Aug 2026

Expression Levels Of Heat Shock Protein 72 And Their Correlation With Biomarkers Of Renal Function Among Hispanic Construction Workers Exposed To Ambient Heat In El Paso, Texas, Maria Fuentes

Open Access Theses & Dissertations

Heat shock proteins (HSP) are intracellular molecular proteins that are upregulated in response to cellular stress, including heat exposure. Through their protective functions, HSP help maintain protein structure, prevent protein denaturation, and preserve cellular homeostasis during states of physiological stress. Because of their cytoprotective properties, HSP have emerged as potential biomarkers for detecting early signs of tissue injury and predicting clinical outcomes associated with heat related illnesses (HRI), including acute kidney injuries (AKI). AKI is a leading cause of hospitalizations due to heat stress exposure and heat stroke. In the absence of early detection and effective therapeutic interventions, AKI may …


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Machine Learning Approach For Water Quality Assessment In The Lower Rio Grande Valley Watershed, Saika Nowshin Nowrin, Chu-Lin Cheng, Jungseok Ho, Jinwoo An, Fatemeh Nazari Jul 2026

A Machine Learning Approach For Water Quality Assessment In The Lower Rio Grande Valley Watershed, Saika Nowshin Nowrin, Chu-Lin Cheng, Jungseok Ho, Jinwoo An, Fatemeh Nazari

Civil Engineering Faculty Publications

Water quality analysis plays an essential role in maintaining the health and sustainability of river ecosystems, especially in semi-arid regions like the Arroyo Colorado Watershed in South Texas. Since the river is a vital source of water supply for local communities, agriculture, and wildlife, it faces significant challenges and pollution from land use changes, climate variation, and agricultural runoff. Continuous monitoring and assessment of water quality parameters and their temporal variability are essential to ensure the drinking water supply and aquatic ecosystem health. However, comprehensive laboratory-based water quality investigations are often constrained by higher costs, logistical complexity, and limited manpower. …


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson Jul 2026

Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Molly Roby Jul 2026

Re: Conditional Approval Letter For The Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Field Evaluation Summary Report And Technical Recommendations Proposal, Molly Roby Jul 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Field Evaluation Summary Report And Technical Recommendations Proposal, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Response To Comment Letter (Dated June 11, 2026) For The Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Dated January 30, 2026), Brandon Warner Jul 2026

Re: Response To Comment Letter (Dated June 11, 2026) For The Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Dated January 30, 2026), Brandon Warner

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clearing The Air: Tracking Spatial And Temporal Pm2.5 Variability Along A Biking Transect In Chicago, Beau R. Rass Jul 2026

Clearing The Air: Tracking Spatial And Temporal Pm2.5 Variability Along A Biking Transect In Chicago, Beau R. Rass

DePaul Discoveries

Fine particulate matter (PM₂.₅) poses significant risks to human health and disproportionately affects marginalized communities in urban environments (World Health Organization [WHO], 2021; Tessum et al., 2021). Using low-cost mobile sensors, this study explored spatiotemporal PM₂.₅ concentration patterns along a north–south transect of Halsted Street in Chicago. A 2B Technologies Portable Aerosol Monitor (PAM) mounted on a bicycle was used to continuously record PM₂.₅ concentrations with associated GPS coordinates at approximately two-second intervals during 16 sampling events between 08-12-2025 and 10-05-2025. PM₂.₅ concentrations did not differ significantly among the South Side, West Loop, and North Side regions, contrary to the …


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc. Jul 2026

Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Influence Of Stormwater Flooding Events On The Mobile County School District Student Population, Kadence Kali Johnston Jul 2026

Influence Of Stormwater Flooding Events On The Mobile County School District Student Population, Kadence Kali Johnston

Honors Theses

Mobile County, Alabama, receives among the highest annual rainfall totals in the United States resulting in frequent stormwater flooding that intersects with existing socioeconomic vulnerabilities. Within the Mobile County Public School System (MCPSS), 77% of students are economically disadvantaged and over 10% experience homelessness, creating heightened risk for educational disruption during flood events. This study investigates how stormwater flooding influences school attendance, closures, and academic performance across MCPSS, providing insight into how climate-driven hazards exacerbate educational inequities. The research integrates flood frequency, school performance metrics, and GIS flood-zone mapping and teacher perceptions to understand how flooding affects student learning opportunities. …


Insurgent Until Proven Innocent: Land, Power, And The Right To Defend Rights, Kelsey Jost-Creegan Jul 2026

Insurgent Until Proven Innocent: Land, Power, And The Right To Defend Rights, Kelsey Jost-Creegan

Michigan Journal of International Law

As the climate crisis intensifies, advocates worldwide have stood up to defend their communities, territories, and environment. In response, they have faced violent retaliation. This repression persists despite evolving international, regional, and national-level legal frameworks around the “right to defend rights” and the “right to protection.” This article begins by providing a comprehensive overview of this evolving legal landscape. Against this backdrop, the article examines the tactics and architectures of violence used to repress land and environmental defenders through the lens of counterinsurgency theory.

The article proposes a typology of counterinsurgent violence including: surveillance; stigmatization; criminalization; arbitrary detention; infiltration; cooptation; …


Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler Jul 2026

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services Jul 2026

Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott Jun 2026

Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan (Dated May 29, 2006), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan (Dated May 29, 2006), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated May 28, 2026) And The Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated May 28, 2026), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated May 28, 2026) And The Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated May 28, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.