Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering and Management Commons™

Open Access. Powered by Scholars. Published by Universities.®

4,454 Full-Text Articles 5,873 Authors 2,628,906 Downloads 120 Institutions

All Articles in Construction Engineering and Management

Faceted Search

4,454 full-text articles. Page 169 of 180.

Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process - Presentation, Barry McAuley 2013 Technological University Dublin

Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process - Presentation, Barry Mcauley

Conference papers

No abstract provided.


Bs News November/December, 2013 Technological University Dublin

Bs News November/December

Building Services Engineering

No abstract provided.


Creating Interactive Facilities Management Capabilities Through Building Information Modelling As A Tool For Managing The Irish Public Sector Estates - Presentation, Barry McAuley 2013 Technological University Dublin

Creating Interactive Facilities Management Capabilities Through Building Information Modelling As A Tool For Managing The Irish Public Sector Estates - Presentation, Barry Mcauley

Conference papers

No abstract provided.


Compression Testing And Failure Modes Of Steel-Concrete Composite (Sc) Structures For Nuclear Containment, Patrick Michael Wanamaker, Amit H. Varma 2013 Purdue University

Compression Testing And Failure Modes Of Steel-Concrete Composite (Sc) Structures For Nuclear Containment, Patrick Michael Wanamaker, Amit H. Varma

The Summer Undergraduate Research Fellowship (SURF) Symposium

Although being able to provide much cleaner power than burning coal and other fossil fuels, nuclear power plants are still a tough sell to the general public due to their history of being spontaneously dangerous. The containment structures surrounding these nuclear plants, however, can play a huge role in reducing the risks associated with them. Relatively new designs for these containment assemblies, known as SC (steel-concrete composite) structures, aim to increase the strength and durability of the containment facilities while keeping costs down. By varying the spacing between shear studs, the ratio of concrete to steel, and the ratio of …


Using Ultrasonic Pulse Velocity (Upv) To Predict Properties And Performance Of Pervious Concrete, Jeremy Adato, Norbert Delatte 2013 Cleveland State University

Using Ultrasonic Pulse Velocity (Upv) To Predict Properties And Performance Of Pervious Concrete, Jeremy Adato, Norbert Delatte

Undergraduate Research Posters 2013

Pervious concrete is a type of porous portland cement concrete with interconnected voids. This material has been increasingly used to reduce the amount of stormwater runoff from paved areas. It has also been shown to improve the water quality near low volume and low speed pavements as well as in parking lots. Due to the low compressive strength of pervious concrete associated with the high void content, it currently is not used in highway structures except perhaps as an overlay for conventional concrete pavement. The large, open pore structure of this material allows water to pass through its structure, thereby …


Advancing The Facilities Management Process In Ireland Through The Implementation Of Building Information Modelling Within The Public Sector, Barry McAuley, Alan V. Hore, Roger West 2013 Technological University Dublin

Advancing The Facilities Management Process In Ireland Through The Implementation Of Building Information Modelling Within The Public Sector, Barry Mcauley, Alan V. Hore, Roger West

Conference papers

It is widely accepted that it costs up to five times more to operate and maintain a building than to construct it. Despite this statistic the Irish construction sector has done little to move towards cutting edge technologies that will help in addressing this impact on life cycle cost. This is due partly to the fact that the Irish construction sector continues to operate in a depressed state. Despite this harsh reality Ireland must find a way to create a public sector that has a more energy efficient and enhanced physical environment in which to operate without sacrificing user thermal …


Bs News September/October, 2013 Technological University Dublin

Bs News September/October

Building Services Engineering

No abstract provided.


Parameterizing Analytical Models To Support An Empirically Based Warehouse Design Methodology, Lisa Thomas 2013 University of Arkansas, Fayetteville

Parameterizing Analytical Models To Support An Empirically Based Warehouse Design Methodology, Lisa Thomas

Graduate Theses and Dissertations

Research in the area of warehouse design is characterized by a myriad of analytical models that address one, typically small and isolated, area of the warehouse. These models, although important in gaining insight into one question of warehouse design, are of limited value when one considers the larger question of overall warehouse design. Thus, research in the area of overall warehouse design typically consists of procedure-driven processes based on qualitative factors and not the quantifiable results of analytical models.

In contrast, practitioners have significant empirical data related to how a design alternative performs in an industry, a company, or a …


A Comparative Analysis Of Energy Modelingmethods For Commercial Buildings, Spencer Mark Salmon 2013 Brigham Young University - Provo

A Comparative Analysis Of Energy Modelingmethods For Commercial Buildings, Spencer Mark Salmon

Theses and Dissertations

This thesis researched the accuracy of measured energy data in comparison to estimated hand calculation data and estimated building energy performance simulation data. In the facility management industry, there is minimal evidence that building energy performance software is being used as a benchmark against measured energy usage within a building. Research was conducted to find examples of measured energy data compared to simulated data. The study examined the accuracy of a simulation software and hand calculations to measured energy data. Data suggests that comparisons may be made between building energy performance simulated data and measured data, though comparisons are solely …


Observations Of Peak Strength Behavior In Csa Cement Mortars, Joshua V. Brien, Kevin R. Henke, Kamyar C. Mahboub 2013 University of Kentucky

Observations Of Peak Strength Behavior In Csa Cement Mortars, Joshua V. Brien, Kevin R. Henke, Kamyar C. Mahboub

Civil Engineering Faculty Publications

The purpose of this study was to assess the mechanical property performance behavior of calcium sulfoaluminate (CSA) cement mortar when cured at ambient laboratory temperature of ~23°C (73°F) and constant 50% relative humidity for an extended period of time. Four CSA cement mortars were tested. Three CSA cement mortars contained equivalent mass amounts of calcium sulfate; whereas, the fourth mortar contained double the amount of calcium sulfate. The three CSA cement mortars containing constant mass amounts of calcium sulfate differed as the specific type of calcium sulfate varied across the three formulations—one mortar containing solely anhydrite, one mortar contained half …


Bs News July/August, 2013 Technological University Dublin

Bs News July/August

Building Services Engineering

No abstract provided.


Impact Of Prevailing Wages On The Cost Among The Various Construction Trades, Alan Atalah 2013 Bowling Green State University

Impact Of Prevailing Wages On The Cost Among The Various Construction Trades, Alan Atalah

Construction Management Faculty Publications

In 1997, the Ohio Senate passed Senate Bill 102 which established the Ohio School Facilities Commission as a separate agency to oversee the rebuilding projects of the public schools in Ohio. The bill also exempted the construction contractors from paying prevailing wages on these projects on the hypothesis that this exemption would lower the construction cost. The purpose of this study is to investigate this hypothesis through the statistical analysis of 8,093 bids received from the years 2000 through 2007 for the schools’ construction. Union contractors who paid their workers union wages and non-union contractors who did not pay prevailing …


1976 Montreal Olympics: Case Study Of Project Management Failure, Ashish Patel, Paul A. Bosela, Norbert Delatte 2013 HWH Architects Engineers Planners, Inc

1976 Montreal Olympics: Case Study Of Project Management Failure, Ashish Patel, Paul A. Bosela, Norbert Delatte

Civil and Environmental Engineering Faculty Publications

A successful engineering project must include its timely and economic completion. A project management failure can lead to delays and cost overruns. One example of a project that greatly exceeded its projected budget is the construction of the multiple facilities for the 1976 Olympic Games in Montreal. These included the Olympic Stadium, a velodrome for bicycle events, and the Olympic Village to house the athletes. This case study reviews the circumstances of the cost increases and the design decisions and other circumstances that led to them. The difficulties were brought on by an unrealistic schedule to complete the facilities before …


Design, Construction, And Evaluation Of A Hydraulic Oil Filtration Cart, Eric Steiger 2013 California Polytechnic State University, San Luis Obispo

Design, Construction, And Evaluation Of A Hydraulic Oil Filtration Cart, Eric Steiger

BioResource and Agricultural Engineering

This report discusses the design, construction, and evaluation of a hydraulic oil filtration car sponsored by Papich Construction Inc. This company developed the need for a filter cart system to service equipment by flushing and cleaning the oil in hydraulic reservoirs and systems. The opportunity of reviewing an existing product from Caterpillar was taken to obtain basic design parameters. This car however, did not meet all the needs preferred by the service technicians of Papich; thus leading to the idea of a custom filter cart.

The filter cart is composed of a square tube frame sitting on pneumatic no-flat castor …


Airport Runway Heating System, Greg Wang, Curtis Reedy 2013 California Polytechnic State University - San Luis Obispo

Airport Runway Heating System, Greg Wang, Curtis Reedy

Electrical Engineering

According to the Federal Aviation Administration, flight delays cost airlines $22 billion annually (Rapajic 16). Snow and ice buildup on the tarmacs are a major contributor to these delays in regions where freezing weather conditions are common. Current solutions such as anti-freeze chemicals and snowplows are ineffective and costly. Implementing a radiant heating system, specifically pipes running hot liquid within or below the runways, can help maintain the surface above freezing temperatures. Such a system has yet to be installed in a functioning airport because of its complexity and high cost. However, the FAA provides funding for infrastructure improvements, and …


Spurlock, Christy Leigh, B. 1963 (Mss 451), Manuscripts & Folklife Archives 2013 Western Kentucky University

Spurlock, Christy Leigh, B. 1963 (Mss 451), Manuscripts & Folklife Archives

Manuscript Collection Finding Aids

Finding aid only for Manuscripts Small Collection 451. Paper titled “White Stone Quarry of Bowling Green, KY” written by Christy Leigh Spurlock for a Western Kentucky University history department independent study project. Includes research materials such as maps, deeds, photos, and transcriptions of interviews with former quarry employees and their family members.


American Architectural, Engineering And Construction Companies Working In The Green Building Industry In The Republic Of India, Matthew O. Harbour 2013 Roger Williams University

American Architectural, Engineering And Construction Companies Working In The Green Building Industry In The Republic Of India, Matthew O. Harbour

Construction Management Theses

This research paper has addressed the problem statement "Too few American Architectural, Engineering, and Construction (AEC) companies are participating in the green building market in the Republic of India." This paper provides a conceptual model to support American AEC companies to become involved in the green building market in the Republic of India. This model is a result of a literature review, an analysis of an online survey and a personal interview. This paper addresses the need for American AEC companies to remain competitive in the green building market in the Republic of India. This paper provides a brief history …


Comparison Of Personality Traits Among Estimators, Project Managers, And The Population, Alan Atalah 2013 Bowling Green State University

Comparison Of Personality Traits Among Estimators, Project Managers, And The Population, Alan Atalah

Construction Management Faculty Publications

The intuitive hypothesis that Construction Management Professionals (CMP) must have a high level of people skills implies that they should be different than the population at large in terms of people skills. In addition, estimators do not deal with as many people as project managers; therefore, they may not have/need as high of people skills as project managers. This paper tests these hypotheses through the analysis of 47 personality traits of 102 experienced applicants for construction management positions and compares this analysis to the traits of the overall population. The analysis suggested that (1) CMP were significantly different from the …


Pump Controller Design For Variable Primary Flow Configuration Systems, Yifan Shi 2013 University of Nebraska-Lincoln

Pump Controller Design For Variable Primary Flow Configuration Systems, Yifan Shi

Durham School of Architectural Engineering and Construction: Dissertations, Theses, and Student Research

Pump systems are utilized widely in Heating, Ventilation and Air-Conditioning (HVAC) systems. There are mainly three configuration types: (1) the constant primary-only flow configuration, (2) the constant primary/variable secondary flow configuration, and (3) the variable primary-only flow configuration. This thesis focuses on finding the optimal control strategy for it and programming a controller for easy in-field usage.

In this thesis, the pump brake horse power (BHP) of the three pump configurations is simulated and compared using varying control methods. The best pump efficiency staging and DP reset control methods are implemented into the pump controller. A one month field experiment …


Bs News May/June, 2013 Technological University Dublin

Bs News May/June

Building Services Engineering

No abstract provided.


Digital Commons powered by bepress