Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering and Management Commons™

Open Access. Powered by Scholars. Published by Universities.®

4,454 Full-Text Articles 5,873 Authors 2,628,906 Downloads 120 Institutions

All Articles in Construction Engineering and Management

Faceted Search

4,454 full-text articles. Page 168 of 180.

Testing And Analysis Of An Alternative Connection Method In Closed Panel Timber Frame Domestic Construction, Brendan Towey 2014 Technological University Dublin

Testing And Analysis Of An Alternative Connection Method In Closed Panel Timber Frame Domestic Construction, Brendan Towey

Masters

Construction practices continue to evolve in tandem with the requirements for more energy efficient buildings, materials and construction methods. This steady and progressive move towards the development of the industry and its products comes, not in leaps and bounds, but in incremental advances across all areas of construction. The research detailed in this project is one such advancement. Timber frame construction has been in existence for centuries and its tried and tested methods have been utilised worldwide in both domestic and industrial building. In recent times, standard open panel timber frame construction has been enhanced by the development of closed …


Behavior Of I-Section Gfrp Beam Including Retrofitting For Damage Effects, Mamadou Konate, Zia Razzaq 2014 Old Dominion University

Behavior Of I-Section Gfrp Beam Including Retrofitting For Damage Effects, Mamadou Konate, Zia Razzaq

Civil & Environmental Engineering Faculty Publications

This paper presents the outcome of a study of an I-section Glass Fiber Reinforced Polymer (GFRP) beam including retrofitting for damage effects. A total of three beam tests were conducted in the following sequence: GFRP beam with no retrofitting and a single mid-span web brace; the partially damaged (cracked) beam with GFRP plates used for retrofitting; and the retrofitted beam re-tested with the lateral brace at the top flange level. Both cracking and lateral-torsional buckling behavior is studied and experimental load-deflection relationships recorded. Using the mechanical properties of GFRP based on the experimental data, theoretical predictions are made for the …


Housing The Workforce Following The Canterbury Earthquakes In New Zealand, Yan Chang-Richards, Suzanne J. Wilkinson, Erica Seville, David Brundson 2014 The University of Auckland

Housing The Workforce Following The Canterbury Earthquakes In New Zealand, Yan Chang-Richards, Suzanne J. Wilkinson, Erica Seville, David Brundson

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

Temporary housing following a large-scale disaster has a positive effect on household welfare and community recovery. Following the 2010 and 2011 Canterbury earthquakes, a shortage of temporary accommodation created barriers for the outside construction workforce to engage in repairs and rebuild in Christchurch. This study investigates the impacts of housing shortages for the overall recovery and the strategies adopted by both households and the workforce in the building industry. Findings suggest that the interplay among the industry strategies and household strategies for securing housing determines the magnitude and scope of economy-wide inflation. One unfortunate consequence of these industry strategies is …


Compare And Contrast Major Nuclear Power Plant Disasters: Lessons Learned From The Past, Sayanti Mukhopadhyay, Makarand Hastak Dr., Jessica Halligan 2014 Purdue University

Compare And Contrast Major Nuclear Power Plant Disasters: Lessons Learned From The Past, Sayanti Mukhopadhyay, Makarand Hastak Dr., Jessica Halligan

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

The construction of nuclear power plants is a major step towards reducing greenhouse gas emissions compared to the conventional coal-fired or oil-fired power plants. However, some of the major nuclear accidents in the past have raised questions about the safety and reliability of nuclear power plants. This paper compares and contrasts the major nuclear accidents of the past for example, the Chernobyl disaster (USSR), the Fukushima Daiichi disaster (Japan), and the Three Mile Island incident (USA). Although each of the accidents was unique, a thorough comparison found some common issues, such as faulty design of reactors and safety systems, safety …


Postdisaster Reconstruction Of Horizontal Infrastructure Systems: A Review Of The Christchurch Rebuild, Kristen A. MacAskill 2014 University of Cambridge

Postdisaster Reconstruction Of Horizontal Infrastructure Systems: A Review Of The Christchurch Rebuild, Kristen A. Macaskill

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

This paper investigates the decision-making processes guiding postdisaster infrastructure reconstruction— concentrating on wastewater, water supply, stormwater and road networks (“horizontal infrastructure”). It draws on empirical analysis of the postearthquake reconstruction currently underway in Christchurch, New Zealand.

Restoring infrastructure services to provide at least a basic level of essential services after a disaster helps wider economic recovery. Subsequently, there is pressure to restore infrastructure services to predisaster levels as quickly as possible. Reconstruction programmes thus commence in highly uncertain decision-making environments and are reactive to perceived, immediate needs. The extent and nature of the work is later clarified and re-evaluated as …


Selecting A Temporary Debris Management Site For Effective Debris Removal, Jooho Kim, Abhijeet Deshmukh, Makarand Hastak 2014 Purdue University

Selecting A Temporary Debris Management Site For Effective Debris Removal, Jooho Kim, Abhijeet Deshmukh, Makarand Hastak

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

The overall debris removal after disasters is often prolonged due to the huge amount of debris and lack of capacities such as a Temporary Debris Management Site (TDMS) in the community. This results in a delay of overall recovery and increases the total recovery cost. Strategic planning and building a TDMS will help in providing extra time for proper disposal of debris and clearing a disaster-impacted site that will facilitate the reconstruction process. This paper presents a unique approach for identifying and selecting TDMS locations for expediting debris removal from the community. A hypothetical example of a community impacted by …


Bs News January/February, 2014 Technological University Dublin

Bs News January/February

Building Services Engineering

No abstract provided.


Mechanical And Transport Properties Of Alkali-Activated Natural Pozzolans As Sustainable Binders, Brittany Radke 2014 University of Nevada, Las Vegas

Mechanical And Transport Properties Of Alkali-Activated Natural Pozzolans As Sustainable Binders, Brittany Radke

Calvert Undergraduate Research Awards

OPC production accounts for 5 to 7% of the global carbon dioxide (CO2) emissions, contributing to global warming. The desire to reduce CO2 emissions and produce more durable concrete has given impetus to search for new binders. It is suggested that alkali-activated natural pozzolans have the potential for use as a sustainable replacement for OPC in concrete.

The current study presented herein evaluated fresh, mechanical, and transport properties of alkali-activated natural pozzolan mortars containing various concentrations of sodium hydroxide solutions as an alkaline activator. To this aim, alkali-activated natural pozzolan mortars were made with concentrations of sodium …


Implementing Green Roofs On Movie Theaters And Shopping Centers: Business Cases In Profitable Sustainability, Ryan J. Miller 2014 Pomona College

Implementing Green Roofs On Movie Theaters And Shopping Centers: Business Cases In Profitable Sustainability, Ryan J. Miller

Pomona Senior Theses

This thesis presents the business case for installing green roofs on movie theaters and shopping centers. These businesses can then derive increased profits from the environmental benefits of reduced energy use and increased stormwater retention. After presenting the basic design and benefits of a green roof, the thesis develops stand-alone business plans for a movie theater and shopping center. The author finds that green roofs are a profitable sustainability solution for the commercial enterprise.


Network Interdependency Modeling For Risk Assessment On Built Infrastructure Systems, Vhance V. Valencia 2013 Air Force Institute of Technology

Network Interdependency Modeling For Risk Assessment On Built Infrastructure Systems, Vhance V. Valencia

Theses and Dissertations

As modern infrastructures become more interconnected, the decision-making process becomes more difficult because of the increased complexity resulting from infrastructure interdependencies. Simulation and network modeling provide a way to understand system behavior as a result of interdependencies. One area within the asset management literature that is not well covered is infrastructure system decay and risks associated with that decay. This research presents an enhanced version of Haimes' input-output inoperability model (IIM) in the analysis of built infrastructure systems. Previous applications of the IIM characterized infrastructure at the national level utilizing large economic databases. This study develops a three-phased approach that …


The Performance Of Risk Management And Innovation In Construction Manager/General Contractor Delivery In Civil Construction Applications, Rebecca M. Owens 2013 Brigham Young University - Provo

The Performance Of Risk Management And Innovation In Construction Manager/General Contractor Delivery In Civil Construction Applications, Rebecca M. Owens

Theses and Dissertations

Project teams that deliver high risk, complex projects in the civil construction industry need tools to enable successful delivery. Construction Manager/General Contractor (CM/GC) is an innovative alternate delivery method, providing one such a tool. CM/GC furnishes public agencies with an attractive option for delivering projects in a less adversarial and more constructive manner by involving the contractor during design. The sophisticated public owner does not have to relinquish control of the details of the design in order to accelerate the schedule or see the benefits of real-time cost estimating data. There are also significant cost and schedule benefits with not …


Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process, Barry McAuley 2013 Technological University Dublin

Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process, Barry Mcauley

Conference papers

The Facilities Manager occupies a unique position within the lifecycle of a building asset, as he/she is one of the only AEC / FM professionals who is in a position to view the product of the entire design and build process and, is responsible for the operational phase which incurs approximately five times the initial capital cost. Despite the potential benefits that the Facilities Manager offers, this profession still does not command the recognition it deserves within the AEC/FM sector. This is beginning to change through the introduction of Building Information Modelling (BIM). In order for the BIM process to …


Standardized Longitudinal Connection Detail For Decked Precast Prestressed Concrete Girders, Ramzi Muftah Ali Abduallah 2013 Western Michigan University

Standardized Longitudinal Connection Detail For Decked Precast Prestressed Concrete Girders, Ramzi Muftah Ali Abduallah

Masters Theses

The use of decked precast prestressed concrete girders (DPPCG) is becoming popular in accelerated bridge construction. DPPCGs are assembled and connected on site using grout or concrete longitudinal connections. The durability performance of these connections is a concern. The objective of this research is to document the longitudinal connection behavior with respect to its design parameters, and establish a process for developing a standardized connection detail considering the demands due to live load and temperature gradient (TG) load. In order to demonstrate this process, decked bulb-tee and decked box-beam girders were considered. Finite element models, under various types and levels …


In-Plane Loading Of Brick Veneer Over Wood Shear Walls, Elias Anis Toubia, James M. Lintz 2013 University of Dayton

In-Plane Loading Of Brick Veneer Over Wood Shear Walls, Elias Anis Toubia, James M. Lintz

Civil and Environmental Engineering and Engineering Mechanics Faculty Publications

In the design of wood stud walls with brick veneer, current design building codes specify that the wood stud wall should resist all in-plane and out-of-plane loads (IBC 2009). For out-of-plane loads, this assumption is entirely justified as the brittle brick veneer will crack and lose its capacity to resist bending. For in-plane loads, the brick veneer is significantly stiffer than the wood shear wall, and the veneer is unlikely to crack before the wood shear wall reaches its allowable capacity. The assumption that the wood shear wall resists the entire load is based on the further assumption that the …


Performance Comparison Of Design-Build And Construction Manager/General Contractor Highway Projects, Binita Shakya 2013 University of Nevada, Las Vegas

Performance Comparison Of Design-Build And Construction Manager/General Contractor Highway Projects, Binita Shakya

UNLV Theses, Dissertations, Professional Papers, and Capstones

Researchers have conducted numerous studies comparing project performance of design-bid-build (DBB) and design-build (DB) highway projects. However, little research has been done to compare the performance of DB and construction manager/general contractor (CM/GC) highway projects. Therefore, an exploratory study was conducted to compare the performance of 55 DB and 34 CM/GC highway projects from various States Departments of Transportation (DOTs) in terms of cost, change orders, and construction intensity. The results showed that contract award cost growth was significantly lower in DB projects than in CM/GC projects. In contrast to this, the total cost growth of DB projects was higher …


A Comparative Study Of Performance, Impediments, Advantages, And Disadvantages Of Construction And Professional Disadvantaged Business Enterprises, Ravi Sharma 2013 University of Nevada, Las Vegas

A Comparative Study Of Performance, Impediments, Advantages, And Disadvantages Of Construction And Professional Disadvantaged Business Enterprises, Ravi Sharma

UNLV Theses, Dissertations, Professional Papers, and Capstones

Construction and professional disadvantaged, minority, and women business enterprises (DBE/MBE/WBEs) face several impediments that hinder their business growth. A questionnaire survey was conducted to determine the important factors that affect their business performance, impediments faced by these business enterprises, advantages, and disadvantages of being DBE (DBE will be an umbrella designation for DBE, MBE, and WBE). This study compares the difference in responses from these two groups. A total of 333 business enterprises responded to the questionnaire. The survey results showed that construction firms gave significantly higher importance to "financial" issues and "safe work practices" as their most important factors …


Evaluation Of Alternative Project Delivery Methods In Water And Wastewater Projects, Ruiko Maharjan 2013 University of Nevada, Las Vegas

Evaluation Of Alternative Project Delivery Methods In Water And Wastewater Projects, Ruiko Maharjan

UNLV Theses, Dissertations, Professional Papers, and Capstones

The United States (U.S.) is facing significant challenges in addressing aging water infrastructure. Most of the drinking water infrastructure is reaching the end of their useful lives. The American Water Works Association (AWWA) estimated that it will cost about $1 trillion to repair or replace drinking water pipes. Over the next 20 years, it will cost about $298 billion to fix or expand pipes of the nation's wastewater and storm-water systems (AWWA, 2012). Owners, engineers, and contractors are using Alternative Project Delivery (APD) methods - e.g., Design-Build Construction Management-at-Risk Construction Management/General Contractor- to build water and wastewater projects in order …


Creating Interactive Facilities Management Capabilities Through Building Information Modelling As A Tool For Managing The Irish Public Sector Estates, Barry McAuley, Alan V. Hore, Roger West, Deborah Rowland 2013 Technological University Dublin

Creating Interactive Facilities Management Capabilities Through Building Information Modelling As A Tool For Managing The Irish Public Sector Estates, Barry Mcauley, Alan V. Hore, Roger West, Deborah Rowland

Conference papers

The Irish Government manages estates that are faced with increased pressure on their greenhouse gas emissions, as well as, poorly managed assets that leave it increasingly difficult for an effective Facilities Management (FM) process to be operated. The FM processes represents the most costly stage in the life-cycle of a building and must now take priority in the design process, as the operating and maintenance costs can be up to five times the capital costs, with the business operating costs reaching up to two hundred times the capital costs over the life of the building. In order for Ireland to …


Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process, Barry McAuley, Alan V. Hore, Roger West 2013 Technological University Dublin

Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process, Barry Mcauley, Alan V. Hore, Roger West

Conference papers

The Facilities Manager occupies a unique position within the lifecycle of a building asset, as he/she is one of the only Architectural, Engineering, and Construction/Facilities Management (AEC / FM) professionals who is in a position to view the product of the entire design and build process. Despite the potential benefits that the Facilities Manager offers, this profession still remains largely undeveloped and still does not command the recognition it deserves within the AEC/FM sector. This is beginning to change through the introduction of Building Information Modelling (BIM) which can offer a new level of functionality for the management of buildings …


Public / Private Bim: An Irish Perspective, Barry McAuley, Alan V. Hore, John Deeney 2013 Technological University Dublin

Public / Private Bim: An Irish Perspective, Barry Mcauley, Alan V. Hore, John Deeney

Conference papers

The current economic difficulties have affected most practitioners within the industry and, as a result, many firms and contractors are bidding for fewer projects, resulting in below-cost tenders. It is clear that, many firms and contractors are now operating on thin margins; which makes it increasingly difficult for them to commit to the introduction of new software applications and system upgrades. The transition to Building Information Modelling (BIM) from traditional 2D CAD by Irish firms and contractors has been a relatively slow process compared with our international colleagues. There are many reasons for this, including lack of resources, lack of …


Digital Commons powered by bepress