Request For Change (Rfc-Rmap-2024-002),
2024
Atlantic Richfield Company
Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Request For Change (Rfc-Rmap-2024-002),
2024
Atlantic Richfield Company
Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp),
2024
Montana Tech Library
Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report,
2024
Montana Tech Library
Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Response To Agency Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report Prepared For Atlantic Richfield Company By Stantec Consulting Services, Inc. Dated September 12, 2024 Date Of Comments: February 1, 2024, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Groundwater Model Technical Memorandum,
2024
Montana Tech Library
Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum,
2024
Montana Tech Library
Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) –East Middle School (Dated March 29, 2024),
2024
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) –East Middle School (Dated March 29, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Low-Emission Beef Production In The Southern Rangelands Of Western Australia: An Analysis Of Herd Structure And Stocking Rate Experiencing Droughts,
2024
Department of Primary Industries and Regional Development, Western Australia
Low-Emission Beef Production In The Southern Rangelands Of Western Australia: An Analysis Of Herd Structure And Stocking Rate Experiencing Droughts, Christophe D'Abbadie
Animal production and livestock research articles
Reconciling profitable cattle production with rangeland health and reduced emissions is a key challenge in the southern rangelands of Western Australia (WA). Stocking rate and herd structure selection are crucial decisions to achieve this balance. This study assessed the emission profiles of three contrasting herd structures (weaner production, live export, and slaughter production), and three stocking rates within a herd–carbon accounting modelling framework. The analysis considers the impact of varying drought frequencies on these cattle production systems. Herd models were developed for the semiarid southern WA rangelands. Stocking rates were set at 100%, 80% and 66% of the government recommended …
Re: Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01,
2024
Management Service Company, ARCO
Re: Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp),
2024
Environmental Protection Agency
Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 181 – Mountain Con-3 Dump,
2024
Environmental Protection Agency
Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 181 – Mountain Con-3 Dump, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 30, 2024).,
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 30, 2024)., Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Methane Fluxes In Tidal Marshes Of The Conterminous United States,
2024
Universitat Autònoma de Barcelona
Methane Fluxes In Tidal Marshes Of The Conterminous United States, Ariane Arias-Ortiz, Jaxine Wolfe, Scott D. Bridgham, Sara Knox, Gavin Mcnicol, Brian A. Needelman, Julie Shahan, Ellen J. Stuart-Haëntjens, Lisamarie Windham-Myers, Patty Y. Oikawa, Dennis D. Baldocchi, Joshua S. Caplan, Margaret Capooci, Kenneth M. Czapla, R. Kyle Derby, Heida L. Diefenderfer, Inke Forbrich, Gina Groseclose, Jason K. Keller, Cheryl Kelley, Amir E. Keshta, Helena S. Kleiner, Ken W. Krauss, Robert R. Lane, Sarah Mack, Serena Moseman-Valtierra, Thomas J. Mozdzer, Peter Mueller, Scott C. Neubauer, Genevieve Noyce, Katrina V. R. Schäfer, Rebecca Sanders-Demott, Charles A. Schutte, Rodrigo Vargas, Nathaniel B. Weston, Benjamin Wilson, J. Patrick Megonigal, James R. Homquist
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Methane (CH4) is a potent greenhouse gas (GHG) with atmospheric concentrations that have nearly tripled since pre-industrial times. Wetlands account for a large share of global CH4 emissions, yet the magnitude and factors controlling CH4 fluxes in tidal wetlands remain uncertain. We synthesized CH4 flux data from 100 chamber and 9 eddy covariance (EC) sites across tidal marshes in the conterminous United States to assess controlling factors and improve predictions of CH4 emissions. This effort included creating an open-source database of chamber-based GHG fluxes (https://doi.org/10.25573/serc.14227085). Annual fluxes across chamber and EC sites averaged 26 ± 53 g CH4 …
Tracing Atlantic Sea Scallops Using Radio Frequency Identification (Rfid) Technology,
2024
Virginia Institute of Marine Science
Tracing Atlantic Sea Scallops Using Radio Frequency Identification (Rfid) Technology, Will Shoup, David Rudders, Jonathon Peros
Journal of Extension
Radio Frequency Identification (RFID) represents a technology that has the potential to enhance many aspects of the Atlantic sea scallop fishery. Driven by fishery management and market forces, fishery product traceability benefits fisheries managers, consumers, and fishermen. In order to demonstrate the capabilities of RFID technology in the scallop fishery, a solution is proposed that would help establish clear Chain of Custody (CoC) so that the scallop supply chain can be better documented. Implementation and acceptance of any new technology will hinge on effective communication and extension efforts that can leverage the multi-benefit aspects of adopting RFID into the fishery.
Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization,
2024
Management Service Company, ARCO
Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Comments On Bpsou “Diggings East 60% Remedial Design Package” Received From British Petroleum - Atlantic Richfield Company (Bp-Ar) On 4/23/2024,
2024
Natural Resource Damage Program, Helena MT
Draft Comments On Bpsou “Diggings East 60% Remedial Design Package” Received From British Petroleum - Atlantic Richfield Company (Bp-Ar) On 4/23/2024, Jim Ford
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization,
2024
Management Service Company, ARCO
Re: Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
