Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment Commons™

Open Access. Powered by Scholars. Published by Universities.®

6,850 Full-Text Articles 9,145 Authors 2,476,838 Downloads 196 Institutions

All Articles in Environmental Indicators and Impact Assessment

Faceted Search

6,850 full-text articles. Page 56 of 276.

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson 2024 Management Service Company, ARCO

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Altitude-Driven Variations In Chrysophycean Stomatocyst Assemblages: Implications For Climate Reconstructions In The Three Parallel Rivers Of Yunnan Protected Area, China, Yanling Li, Qi Liu, Yangdong Pan, Wanting Pang 2024 Yunnan University

Altitude-Driven Variations In Chrysophycean Stomatocyst Assemblages: Implications For Climate Reconstructions In The Three Parallel Rivers Of Yunnan Protected Area, China, Yanling Li, Qi Liu, Yangdong Pan, Wanting Pang

Environmental Science and Management Faculty Publications and Presentations

The Three Parallel Rivers of Yunnan Protected Area (TPRYPA) is in the core area of the Hengduan Mountains, characterized by paralleling alternately high mountains and canyons that led to significant vertical temperature variation. Developing a climate transfer function for this region is crucial for both biodiversity protection and enhancing our understanding of feedback mechanisms between low-latitude and high-altitude areas in the context of global climate change. We investigated the chrysophycean stomatocyst assemblages from surface sediments of 46 high mountain lakes (altitude: 3244 to 5043 m) in the TPRYPA to assess the suitability of cysts in prediction of climate variability in …


Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott 2024 Environmental Protection Agency

Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby 2024 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis 2024 Montana Resources

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu 2024 Northwest A&F University

Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Ecosystem restoration is a critical nature-based solution to mitigate climate change. However, the carbon sequestration potential of restoration, defined as the maximum achievable carbon storage, has likely been overestimated because previous studies have not adequately accounted for the competition between ecosystem water demands for maximizing carbon sequestration and human water needs. Here we used a comprehensive process-based model combined with extensive land-use data and evaporation recycling accounting for land–atmosphere feedback to estimate the water requirements associated with ecosystem restoration. We found that achieving the carbon sequestration potential of restoration would significantly reduce global water availability per capita by 26%, posing …


Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe 2024 Environmental Protection Agency

Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe 2024 Environmental Protection Agency

Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott 2024 Environmental Protection Agency

Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024), Emma Rott 2024 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024), Molly Roby 2024 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024), Molly Roby 2024 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Liming Acidic Soils Creates Profits, Land Use Options But Often More Emissions, Sud Kharel, Christophe d'Abbadie, Amir Abadi Ghadim, Chris Gazey, Ross Kingwell 2024 Department of Primary Industries and Regional Development, Western Australia

Liming Acidic Soils Creates Profits, Land Use Options But Often More Emissions, Sud Kharel, Christophe D'Abbadie, Amir Abadi Ghadim, Chris Gazey, Ross Kingwell

Natural Resources Research Articles

Context

Soil acidity constrains crop production in Australia. The practice of liming can reduce soil acidity but produces greenhouse gas emissions.

Aims

By examining land use sequences over three decades at a range of locations in Western Australia, this study aims to identify firstly where and when liming might boost farm profits and secondly, what emissions and land use management flexibilities are generated by liming.

Methods

Bioeconomic simulation modelling is used to identify the gross margins and emissions associated with liming in land use sequences at 14 locations in Western Australia. Three intensities of cropping and three different rotational sequences …


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. 2024 Montana Tech Library

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Discharge System 2023 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 20, 2024, Jason Rappe 2024 Environmental Protection Agency

Approval Of: Discharge System 2023 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 20, 2024, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024, Jason Rappe 2024 Environmental Protection Agency

Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Draft Final 2023 Annual Report, Operations & Maintenance Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 10, 2024., Jason Rappe 2024 Environmental Protection Agency

Approval Of: Draft Final 2023 Annual Report, Operations & Maintenance Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 10, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024., Jason Rappe 2024 Environmental Protection Agency

Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump And Responses To Agency Comments, Mike McAnulty 2024 Atlantic Richfield Company

Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump And Responses To Agency Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. 2024 Montana Tech Library

Final 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress