Re: August 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report,
2024
Montana Resources
Re: August 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Butte Hill Revegetation Specifications (Bhrs),
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Butte Hill Revegetation Specifications (Bhrs), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2024 Monthly Discharge Monitoring Report,
2024
Montana Resources
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Seasonal Dynamics In Land Surface Temperature In Response To Land Use Land Cover Changes Using Google Earth Engine,
2024
Chinese Academy of Sciences
Seasonal Dynamics In Land Surface Temperature In Response To Land Use Land Cover Changes Using Google Earth Engine, Lei Feng, Sajjad Hussain, Narcisa G. Pricope, Sana Arshad, Aqil Tariq, Li Feng, Muhammad Mubeen, Rana Waqar Aslam, Mohammed S. Fnais, Wenzhao Li, Hesham El-Askary
Mathematics, Physics, and Computer Science Faculty Articles and Research
Changes in land use and land cover (LULC) are critical for evaluating global spatiotemporal trends, especially regarding climate change and urbanization. This study investigates the dynamics of Landsat surface temperature (LST) in response to LULC changes and their effects on the seasonal microclimate in Kasur District, Pakistan. Using the Google Earth Engine platform, we employed a random forest algorithm to detect LULC changes (cropland, forest, built-up, fallow, barren, and water) and analyze seasonal spectral indices from Landsat imagery for 1988, 2002, and 2022. Significant LULC changes were observed, including a 9.8% increase in built-up areas, a 4.2% decrease in cropland, …
2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp),
2024
Montana Tech Library
2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Effects Of Microplastic Biofilms On An Anthropogenically Impacted Suburban Lake,
2024
Grand Valley State University
Effects Of Microplastic Biofilms On An Anthropogenically Impacted Suburban Lake, Paris M. Velasquez
Masters Theses
Plastics have been observed in every location on the planet, and their prevalence in the environment is due in part to their strong resistance to degradation. Inland lakes are susceptible to plastic pollution by highway runoff, which contains plastic fragments of brake pads, car tires, litter, and road paint. These plastics eventually enter freshwater environments and degrade into microplastics (
Re: Comment Letter For Draft Bpsou 2023 Groundwater Data Summary Report (Dated May 31, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For Draft Bpsou 2023 Groundwater Data Summary Report (Dated May 31, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
A Generalized Machine Learning Model For Long-Term Coral Reef Monitoring In The Red Sea,
2024
Chapman University
A Generalized Machine Learning Model For Long-Term Coral Reef Monitoring In The Red Sea, Justin J. Gapper, Surendra Maharjan, Wenzhao Li, Erik Linstead, Surya Prakash Tiwari, Mohamed A. Qurban, Hesham El-Askary
Mathematics, Physics, and Computer Science Faculty Articles and Research
Coral reefs, despite covering less than 0.2 % of the ocean floor, harbor approximately 35 % of all known marine species, making their conservation critical. However, coral bleaching, exacerbated by climate change and phenomena such as El Niño, poses a significant threat to these ecosystems. This study focuses on the Red Sea, proposing a generalized machine learning approach to detect and monitor changes in coral reef cover over an 18-year period (2000–2018). Using Landsat 7 and 8 data, a Support Vector Machine (SVM) classifier was trained on depth-invariant indices (DII) derived from the Gulf of Aqaba and validated against ground …
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Request For Change (Rfc-Rmap-2024-002),
2024
Atlantic Richfield Company
Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Request For Change (Rfc-Rmap-2024-002),
2024
Atlantic Richfield Company
Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp),
2024
Montana Tech Library
Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report,
2024
Montana Tech Library
Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Response To Agency Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report Prepared For Atlantic Richfield Company By Stantec Consulting Services, Inc. Dated September 12, 2024 Date Of Comments: February 1, 2024, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum,
2024
Montana Tech Library
Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Groundwater Model Technical Memorandum,
2024
Montana Tech Library
Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
