Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection Commons

Open Access. Powered by Scholars. Published by Universities.®

7,801 Full-Text Articles 8,812 Authors 5,301,903 Downloads 220 Institutions

All Articles in Environmental Health and Protection

Faceted Search

7,801 full-text articles. Page 53 of 208.

Re: Comment Letter For Draft Bpsou Blacktail Creek Riparian Actions Remedial Design Work Plan (Rdwp) (Dated April 4, 2024), Emma Rott 2024 Environmental Protection Agency

Re: Comment Letter For Draft Bpsou Blacktail Creek Riparian Actions Remedial Design Work Plan (Rdwp) (Dated April 4, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Climate Change In Mississippi: A Journalistic Exploration Of Education And Activism, Kala Nance 2024 University of Mississippi

Climate Change In Mississippi: A Journalistic Exploration Of Education And Activism, Kala Nance

Honors Theses

Climate Change in Mississippi: A Journalistic Exploration of Education and Activism takes an investigative, journalistic approach toward climate change in Mississippi. Specifically, how education and awareness have a direct impact on Mississippi industries, people and legislation. The project explored the level of acknowledgement of climate change across the state, and how certain individuals used advocacy to encourage education about climate change to raise awareness of the severity of the situation. This project includes interviews with university professors and researchers, non-profit organizations, educational groups and working individuals in some of Mississippi’s largest areas of employment. Additionally, this project draws on research …


Surface Water Quality Assessment Of Mingo Creek County Park: The Impacts Of Extractive Industries, Mikayla J. Bayto 2024 Duquesne University

Surface Water Quality Assessment Of Mingo Creek County Park: The Impacts Of Extractive Industries, Mikayla J. Bayto

Electronic Theses and Dissertations

Historical and current extraction operations and infrastructure, including natural gas pipelines, conventional and unconventional oil and natural gas drilling, longwall coal mining, and strip coal mining, occur throughout the Mingo Creek watershed of Washington County, Pennsylvania, including Mingo Creek County Park. Mingo Creek and several associated tributaries flow through Mingo Creek County Park, eventually discharging into the Monongahela River. An independent water quality study was conducted from June 2020 through July 2023 in Mingo Creek County Park to determine if historical and current extraction activities impact Mingo Creek and its associated tributaries. Weekly sampling of Mingo Creek and associated tributaries …


Draft Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #13 [Copper Mountain Park], Pioneer Technical Services, Inc. 2024 Montana Tech Library

Draft Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #13 [Copper Mountain Park], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Mandan Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. 2024 Montana Tech Library

Draft Final 2024 Residential Metals Abatement Program (Rmap) Mandan Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Submittal #1, Pioneer Technical Services, Inc. 2024 Montana Tech Library

Draft Final 2024 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Request For Change (Rfc-Rmap-2024-001), Mike McAnulty 2024 Atlantic Richfield Company

Re: Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revitalizing Turtle Creek Park, Michael Hardyway, Ethan Harm, Abbey Jacoby, Casey Stephenson 2024 Bucknell University

Revitalizing Turtle Creek Park, Michael Hardyway, Ethan Harm, Abbey Jacoby, Casey Stephenson

Final Reports in ENST 411: Environmental Community Projects

We current ENST 411 students, Abbey Jacoby, Michael Hardyway, Ethan Harm, and Casey Stephenson have chosen to work with Jim Knight, East Buffalo Township, the Merrill Linn Land and Waterways Conservancy, and many others in an attempt to revitalize Turtle Creek Park for a plethora of reasons. Three of us are majoring in biology, and two are majoring in environmental science, which makes much of the information and techniques relevant in Turtle Creek applicable to our courses of study. This project included heavy hands on work which allowed us students to leave a memorable and impactful influence on the Lewisburg …


Fireflies At Rpa Natural Area Final Report, Olivia H. Bush, Sydney M. Shea, Sofia J. Gordon, Nick S. Wiebke 2024 Bucknell University

Fireflies At Rpa Natural Area Final Report, Olivia H. Bush, Sydney M. Shea, Sofia J. Gordon, Nick S. Wiebke

Final Reports in ENST 411: Environmental Community Projects

Our group worked alongside community partners Shaunna Barnhart and Jim Dunn during the Spring 2024 semester to assist with their annual event Fireflies at RPA Natural Area. RPA Natural Area is a local park in South Williamsport, Pennsylvania that was recently acquired by Southside Recreational Authority. Since taking over the park, the organization has begun hosting an event each July to educate the general public about firefly biology and conservation by showing a film and guiding attendees through a firefly tour through the park. Our goals for this project included creating physical educational materials to be used at the park …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021 Residential Metals Abatement Program – Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021 Residential Metals Abatement Program – Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit, Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels-Indoor Dust) - Butte Career Center/Webster Garfield (Dated March 29, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit, Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels-Indoor Dust) - Butte Career Center/Webster Garfield (Dated March 29, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – Montana Technological University (Prospector Residence Hall) (Dated March 21, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – Montana Technological University (Prospector Residence Hall) (Dated March 21, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021-2022 Residential Metals Abatement Program – Aware Early Head Start Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021-2022 Residential Metals Abatement Program – Aware Early Head Start Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) – Interior School Dust - Investigation Summary Report – East Middle School (Dated January 16, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) – Interior School Dust - Investigation Summary Report – East Middle School (Dated January 16, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – United Congregational Church (Crayon Academy Preschool) (Dated April 2, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – United Congregational Church (Crayon Academy Preschool) (Dated April 2, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 125 – Child Harold-2 Dump., Mike McAnulty 2024 Atlantic Richfield Company

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 125 – Child Harold-2 Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 121 – Travona Dump., Mike McAnulty 2024 Atlantic Richfield Company

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 121 – Travona Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East., Mike McAnulty 2024 Atlantic Richfield Company

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump., Mike McAnulty 2024 Atlantic Richfield Company

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 74 – West Gagnon Dump., Mike McAnulty 2024 Atlantic Richfield Company

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 74 – West Gagnon Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress