Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023 (Dated March 28, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023 (Dated March 28, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment/Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) For Bres No. 121 – Travona Dump, Bres No. 125 – Child Harold-2 Dump, Bres No. 34e – Eveline Dump East, Bres No. 45 – Garfield, Bres No. 49 – Old Glory, Bres No. 52 – Moscow, Bres No. 74 – West Gagnon Dump, And Bres No. 78 Original Mine (Dated May 7, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments For The 2024 Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Quality Assurance Project Plan (Qapp) For Non-Residential Parcels And Residential Daycares (Dated May 23, 2024),
2024
Environmental Protection Agency
Comments For The 2024 Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Quality Assurance Project Plan (Qapp) For Non-Residential Parcels And Residential Daycares (Dated May 23, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - May 2024 Monthly Discharge Monitoring Report,
2024
Montana Resources
Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - May 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels),
2024
Montana Tech Library
Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp),
2024
Montana Tech Library
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024),
2024
Environmental Protection Agency
Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023),
2024
Environmental Protection Agency
Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024),
2024
Environmental Protection Agency
Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels),
2024
Montana Tech Library
Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Investigation Summary Report Kennedy Elementary School Post- Remedial Action Surface Dust Sampling, Christopher Berg, Elsie King
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan, Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp) [Dated January 25, 2024], Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Western Kentucky University Stormwater Utility Survey 2024,
2024
Civil Engineering
Western Kentucky University Stormwater Utility Survey 2024, Warren Campbell
SEAS Faculty Publications
The main goal of this survey is to identify as many U.S. Stormwater Utilities (SWUs) as possible. Because many stormwater professionals do not have the time to respond to questionnaires, our primary method of identification was Internet searches. We searched key terms such as “stormwater utility,” “stormwater fee,” and “drainage fee.” We scoured online municipal codes such as Municode, AmLegal, Sterling, LexisNexis, General Code, and others. We searched through many city web websites to find utilities. We have also had many people contact me to update fees and identify new utilities. However, the data primarily comes from Internet sources and …
Environmental Fate And Transport Of Pfas In Wastewater Treatment Plant Effluent Discharged To Rapid Infiltration Basins,
2024
Western Michigan University
Environmental Fate And Transport Of Pfas In Wastewater Treatment Plant Effluent Discharged To Rapid Infiltration Basins, Kai M. Trobisch
Masters Theses
Fate and transport of per- and polyfluoroalkyl substances (PFAS) in wastewater treatment plant (WWTP) effluent discharged to rapid infiltration basins (RIBs) is investigated using data from 26 WWTPs in Michigan and numerical modeling to assess the role of air-water interface (AWI) sorption in modulating mass fluxes to the saturated zone. Analysis of RIB physical properties yields a median separation distance of 6.5 meters between land surface and the water table, and a continuum of area-normalized effluent fluxes ranging from 0.01 to 0.62 meters per day. A subset of WWTPs with RIBs indicate higher PFAS concentrations in groundwater than effluent with …
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024,
2024
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp),
2024
Montana Tech Library
Draft Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Berkeley Pit And Discharge Pilot Project Downstream Field Sampling Plan 2024 Update, Revision 1,
2024
Montana Tech Library
Berkeley Pit And Discharge Pilot Project Downstream Field Sampling Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
An Index Of Biotic Integrity For Macroinvertebrate Stream Bioassessment Conducted By Community Scientists,
2024
Portland State University
An Index Of Biotic Integrity For Macroinvertebrate Stream Bioassessment Conducted By Community Scientists, Patrick M. Edwards, Daniel Bedell, Shannon Hubler, Chad A. Larson, Kate H. Macneale, Elisa Mickelson, Chris Prescott, Elinore Webb, Jo Wilhelm
Environmental Science and Management Faculty Publications and Presentations
Community science bioassessment has great potential to inform comprehensive stream management plans, but regional analytical tools are needed to evaluate macroinvertebrate data collected through community science programs. To this end, we modified a pre-existing professional index of biotic integrity (IBI) to create a community science IBI (CS-IBI), designed for stream macroinvertebrate data collected by community scientists with minimal training. We used data collected by both professional and community scientists to develop, calibrate, and validate the CS-IBI at 76 streamsites in the Puget Lowland andWillamette Valley ecoregions of the PacificNorthwest in theUnited States. Community science data were taxonomically coarser andmore variable …