Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2024 Monthly Discharge Monitoring Report,
2024
Montana Resources
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Amino Acid-Based Protein-Mimic Hydrogel Incorporating Pro-Regenerative Lipid Mediator And Microvascular Fragments Promotes The Healing Of Deep Burn Wounds,
2024
LSU Health Sciences Center - New Orleans
Amino Acid-Based Protein-Mimic Hydrogel Incorporating Pro-Regenerative Lipid Mediator And Microvascular Fragments Promotes The Healing Of Deep Burn Wounds, Yan Lu, Shanchun Su, Chih Chang Chu, Yuichi Kobayashi, Abdul Razak Masoud, Hongying Peng, Nathan Lien, Mingyu He, Christopher Vuong, Ryan Tran, Song Hong
School of Medicine Faculty Publications
Pro-regenerative lipid mediator 1 (PreM1) is a specialized pro-resolving lipid mediator that promotes wound healing and regenerative functions of mesenchymal stem cells (MSCs), endothelial cells, and macrophages. The healing of third-degree (3°) burns and regenerative functions of MSCs are enhanced by ACgel1, an arginine-and-chitosan-based protein-mimic hybrid hydrogel. Adipose-tissue derived microvascular fragments (MVFs) are native vascularization units and a rich source of MSCs, endothelial cells, and perivascular cells for tissue regeneration. Here we describe an innovative PreM1-MVFs-ACgel1 construct that incorporated PreM1 and MVFs into ACgel1 via optimal design and fabrication. This construct delivered PreM1 to 3°-burn wounds at least up to …
Climate Smart Agriculture,
2024
University of Nebraska-Lincoln
Climate Smart Agriculture, J. David Aiken
Cornhusker Economics
There are several programs encouraging producers to reduce their carbon intensity, including United States Department of Agriculture climate-smart agriculture programs, the 2024 Nebraska Climate Action Plan, and the 2024 Nitrogen Reduction Incentive Act. The hope is that producers with lower carbon intensity (CI) scores will receive a premium for their products. Producers would be well advised to learn more about these programs, as reducing carbon intensity in agriculture seems to be an emerging agricultural policy trend that will be with us for some time to come.
2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp),
2024
Montana Tech Library
2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Draft Bpsou 2023 Groundwater Data Summary Report (Dated May 31, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For Draft Bpsou 2023 Groundwater Data Summary Report (Dated May 31, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Request For Change (Rfc-Rmap-2024-002),
2024
Atlantic Richfield Company
Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Ecology Of Tetrodotoxin Toxicity And Ectoparasite Burden Of Hong Kong Newt Populations,
2024
Lingnan University
Ecology Of Tetrodotoxin Toxicity And Ectoparasite Burden Of Hong Kong Newt Populations, Wing Yan Yip
Lingnan Theses (MPhil & PhD)
Many amphibians have defensive chemicals in their skin. Newts from the family Salamandridae possess a potent neurotoxin - tetrodotoxin (TTX). TTX toxicity has been studied intensively, with the aim of revealing the function and origin of TTX in this family. Research has found within- and between-population variations in North American newts like Taricha, possibly related to co-evolution with its predator, symbiotic bacteria, or several life history traits (e.g., sex and life stage). However, our knowledge about TTX ecology in the Asian newt clade is relatively limited. Additionally, a group of water mites, Lurchibates, specifically parasitizes Asian newts, but …
Request For Change (Rfc-Rmap-2024-002),
2024
Atlantic Richfield Company
Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp),
2024
Montana Tech Library
Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report,
2024
Montana Tech Library
Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Response To Agency Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report Prepared For Atlantic Richfield Company By Stantec Consulting Services, Inc. Dated September 12, 2024 Date Of Comments: February 1, 2024, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum,
2024
Montana Tech Library
Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Groundwater Model Technical Memorandum,
2024
Montana Tech Library
Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) –East Middle School (Dated March 29, 2024),
2024
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) –East Middle School (Dated March 29, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01,
2024
Management Service Company, ARCO
Re: Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.