Redeveloping Mississippi: A Case Study On Brownfields In Central & Southern Mississippi,
2026
University of Southern Mississippi
Redeveloping Mississippi: A Case Study On Brownfields In Central & Southern Mississippi, Sahrah R. Yeroozedek
Master's Theses
Brownfields, or properties that are or possibly are contaminated with dangerous materials, represent a common obstacle for communities in Mississippi. The real or potential presence of contaminants at these sites often deters investors due to costly cleanup requirements (EPA, n.d. -b). The Environmental Protection Agency (EPA), through its Brownfield Revitalization Program, implemented guidelines for covering the costs and labor associated with the remediation of these properties. The EPA is not, however, responsible for redevelopment that supports long-term environmental and economic sustainability. Although the EPA maintains inventories of all Brownfields, there is also no comprehensive database of Brownfields and their current …
Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025,
2026
Montana Tech Library
Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area Materials Management Plan,
2026
Montana Tech Library
Final Silver Bow Creek Conservation Area Materials Management Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap),
2026
Montana Tech Library
Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4,
2026
Montana Tech Library
2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan,
2026
Montana Tech Library
Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Exploratory Proxy Occupational Health Risk Assessment On Pm2.5 Exposure Among Outdoor Personnel At International Ports Of Entry,
2026
University of Texas at El Paso
Exploratory Proxy Occupational Health Risk Assessment On Pm2.5 Exposure Among Outdoor Personnel At International Ports Of Entry, Josdell Maria Guerra Ruiz
Open Access Theses & Dissertations
Despite growing public health concerns on PM2.5 exposure and its respiratory health effects, no documented evidence has been found on the application of proxy methods to perform occupational health risk assessments for PM2.5 exposure among outdoor personnel. The purpose of this research study was to conduct a descriptive and predictive occupational health risk assessment for cancer and non-cancer respiratory health outcomes related to PM2.5 exposure among outdoor personnel at targeted international ports of entry (IPOE). A total of 61 samples were collected, for 24 hours, at two targeted IPOEs (every sixth day) over 12-month period. Samples included measurements on PM2.5 …
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Ai-Driven Multispectral Drone Monitoring For Afforestation In Arid Environments,
2026
Chapman University
Ai-Driven Multispectral Drone Monitoring For Afforestation In Arid Environments, Hesham Morgan, Ali Elgendy, Brandon Tran, Tamer Ismail, Mohamed M. Moursy, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Mubarak, Khaled Allam Harhash, Hesham El-Askary
Mathematics, Physics, and Computer Science Faculty Articles and Research
Monitoring large-scale afforestation projects in arid and semi-arid environments requires accurate, high-resolution, and repeatable methods to assess tree survival and growth. In this study, we integrated unmanned aerial vehicle (UAV) multispectral imaging with an advanced object detection framework to evaluate vegetation establishment in the Shuayb Al-Budai afforestation site, part of the Imam Turki bin Abdullah Royal Natural Reserve, Kingdom of Saudi Arabia (KSA). Multispectral datasets were acquired using a MicaSense Altum-PT sensor and processed through a masked Region-based Convolutional Neural Network (RCNN) with two backbone architectures: ResNet-101 and VGG19-BN. The Mask R-CNN–ResNet-101 model achieved superior performance, with an overall accuracy …
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp),
2026
Montana Tech Library
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp),
2026
Montana Tech Library
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Uniform Federal Policyquality Assurance Project Plan Addendum,
2026
Montana Tech Library
Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
