Silver Bow Creek Conservation Area (Sbcca) – Revised 95% Programmatic Technical Specifications Submittal,
2026
Management Service Company, ARCO
Silver Bow Creek Conservation Area (Sbcca) – Revised 95% Programmatic Technical Specifications Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Josephine Shaft (Bres No. 37) Remedial Action Work Plan (Rawp),
2026
Montana Tech Library
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Josephine Shaft (Bres No. 37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Rock Creek Cattle Company Borrow Submittal #2 (Dated February 4, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Rock Creek Cattle Company Borrow Submittal #2 (Dated February 4, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp),
2026
Montana Tech Library
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Butte Hill Revegetation Specifications,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Butte Hill Revegetation Specifications, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Advancing Environmental Justice Through Chemical Education: Perspective From New Orleans’ Water And Air Quality Challenges,
2026
Xavier University of Louisiana
Advancing Environmental Justice Through Chemical Education: Perspective From New Orleans’ Water And Air Quality Challenges, Ja’Lynn Keller, Sita Aggarwal, Rami A. Al-Horani, Morewell Gasseller, Navneet Goyal
Faculty and Staff Publications
New Orleans, Louisiana, faces profound environmental vulnerabilities arising from the convergence of industrial pollution, urban runoff, and climate change–driven weather events. This paper examines systemic challenges affecting water and air quality in the region, with particular focus on low-income and marginalized communities disproportionately burdened by environmental degradation. Drawing on educational and community-based monitoring initiatives at Xavier University of Louisiana and Southeastern Louisiana University, we highlight the integration of student learning with real-time data collection of contaminants such as fecal coliforms, heavy metals, hydrocarbons, and polycyclic aromatic hydrocarbons (PAHs). The aftermath of Hurricane Katrina revealed significant fecal contamination in sediment layers, …
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2023 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2023 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2022 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2022 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The 2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Consent Decree-Civil Action No. Cv89-039-Bu-She (Dated February 3, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The 2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Consent Decree-Civil Action No. Cv89-039-Bu-She (Dated February 3, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 3 2025 (Dated December 23, 2025),
2026
Environmental Protection Agency
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 3 2025 (Dated December 23, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit - Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit - Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana,
2026
Montana Tech Library
Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana,
2026
Montana Tech Library
Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Intermediate (60%) Remedial Design Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana,
2026
Montana Tech Library
Draft Intermediate (60%) Remedial Design Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Peruvian Pinniped Teeth Trace Element Data-Tracking Ecosystem Variabilites Through Trace Element Record Found In Peruvian Pinniped Dentin,
2026
Nova Southeastern University
Peruvian Pinniped Teeth Trace Element Data-Tracking Ecosystem Variabilites Through Trace Element Record Found In Peruvian Pinniped Dentin, Dimitrios Giarikos, Amy Hirons, Ally E. Sheehan, Radleigh Santos
SECLER Data
The South American sea lion (Otaria byronia; SASL) and the Peruvian fur seal (Arctocephalus australis; PFS) are apex predators within the Humboldt Current ecosystem, where population dynamics respond to both natural variability and anthropogenic pressures, including El Niño–Southern Oscillation (ENSO) events and coastal mining. This study quantified 18 trace elements (TEs) in canine dentin from both species collected at Punta San Juan, Peru using laser ablation-inductively coupled plasma-mass spectrometry (LA-ICP-MS) to evaluate long-term environmental exposure. Because dentin is deposited incrementally, it preserves a chronological chemical archive reflecting ontogenetic shifts in diet and habitat use. Overall, TE concentrations were broadly similar …
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance,
2026
Management Service Company, ARCO
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter With Comments For The Draft Final 2026 Residential Metals Abatement Program (Rmap) Anselmo Mine Yard Development Plan (Dated February 25, 2026),
2026
Environmental Protection Agency
Re: Conditional Approval Letter With Comments For The Draft Final 2026 Residential Metals Abatement Program (Rmap) Anselmo Mine Yard Development Plan (Dated February 25, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.