Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp),
2026
Montana Tech Library
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap),
2026
Montana Tech Library
Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft 2025 Butte Priority Soils Operable Unit Residential Metals Abatement Program Construction Completion Report,
2026
Butte-Silver Bow Reclamation & Environmental Services
Draft 2025 Butte Priority Soils Operable Unit Residential Metals Abatement Program Construction Completion Report, Abby Peltomaa
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Diggings East Final 95% Remedial Design Package Submittal,
2026
Management Service Company, ARCO
Butte Priority Soils Operable Unit Diggings East Final 95% Remedial Design Package Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Conservation Area (Sbcca) – Revised 95% Programmatic Technical Specifications Submittal,
2026
Management Service Company, ARCO
Silver Bow Creek Conservation Area (Sbcca) – Revised 95% Programmatic Technical Specifications Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Butte Hill Revegetation Specifications,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Butte Hill Revegetation Specifications, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp),
2026
Montana Tech Library
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Josephine Shaft (Bres No. 37) Remedial Action Work Plan (Rawp),
2026
Montana Tech Library
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Josephine Shaft (Bres No. 37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Rock Creek Cattle Company Borrow Submittal #2 (Dated February 4, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Rock Creek Cattle Company Borrow Submittal #2 (Dated February 4, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Advancing Environmental Justice Through Chemical Education: Perspective From New Orleans’ Water And Air Quality Challenges,
2026
Xavier University of Louisiana
Advancing Environmental Justice Through Chemical Education: Perspective From New Orleans’ Water And Air Quality Challenges, Ja’Lynn Keller, Sita Aggarwal, Rami A. Al-Horani, Morewell Gasseller, Navneet Goyal
Faculty and Staff Publications
New Orleans, Louisiana, faces profound environmental vulnerabilities arising from the convergence of industrial pollution, urban runoff, and climate change–driven weather events. This paper examines systemic challenges affecting water and air quality in the region, with particular focus on low-income and marginalized communities disproportionately burdened by environmental degradation. Drawing on educational and community-based monitoring initiatives at Xavier University of Louisiana and Southeastern Louisiana University, we highlight the integration of student learning with real-time data collection of contaminants such as fecal coliforms, heavy metals, hydrocarbons, and polycyclic aromatic hydrocarbons (PAHs). The aftermath of Hurricane Katrina revealed significant fecal contamination in sediment layers, …
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2023 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2023 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2022 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2022 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 3 2025 (Dated December 23, 2025),
2026
Environmental Protection Agency
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 3 2025 (Dated December 23, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The 2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Consent Decree-Civil Action No. Cv89-039-Bu-She (Dated February 3, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The 2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Consent Decree-Civil Action No. Cv89-039-Bu-She (Dated February 3, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana,
2026
Montana Tech Library
Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana,
2026
Montana Tech Library
Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Intermediate (60%) Remedial Design Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana,
2026
Montana Tech Library
Draft Intermediate (60%) Remedial Design Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.