Open Access. Powered by Scholars. Published by Universities.®

Other Civil and Environmental Engineering Commons™

Open Access. Powered by Scholars. Published by Universities.®

2,487 Full-Text Articles 6,903 Authors 998,810 Downloads 79 Institutions

All Articles in Other Civil and Environmental Engineering

Faceted Search

2,487 full-text articles. Page 8 of 121.

Wind Tunnel Experiment On Wind-In Duced Vibration Performance Of Arch-Shaped Inclined Steel Bridge Tower In Construction Free-Standing State Using Ae Roelastic Model, XU Peijun, DENG Fei yun, CHEN Shixuan, ZHANG Jiren 2025 Changsha Public Engineering Construction Center , Changsha , Hunan 410023 , China

Wind Tunnel Experiment On Wind-In Duced Vibration Performance Of Arch-Shaped Inclined Steel Bridge Tower In Construction Free-Standing State Using Ae Roelastic Model, Xu Peijun, Deng Fei Yun, Chen Shixuan, Zhang Jiren

Journal of China & Foreign Highway

This paper presented a wind tunnel experimental study on the wind-induced response characteristics of a rectangular-sectioned arch-shaped inclined steel bridge tower during the construction free-standing stage.A 1:50 scaled aeroelastic model was employed to conduct experiments at different wind yaw angles β (0°‒180°).The experimental results indicate:① under the uniform flow field,the tower in its free-standing state does not experience galloping when the bridge ’s wind speed reaches 60 m/s;② under the uniform flow field,the tower exhibits bending vortex-induced vibrations (VIVs ) along the bridge direction or transverse to the bridge direction.However,the amplitudes of the tower top displacements associated with these VIVs …


Numerical Simulation Study On Scour Erosion Of Bridge Pile Foundations In Service, WANG Shang, MI Jiangchuan, CHEN Mingtao, SONG Dan, ZHANG Qiao, ZHANG Yong, WANG Weixiao 2025 Ankang City Transportation Bureau , Ankang , Shaanxi 725000 , China

Numerical Simulation Study On Scour Erosion Of Bridge Pile Foundations In Service, Wang Shang, Mi Jiangchuan, Chen Mingtao, Song Dan, Zhang Qiao, Zhang Yong, Wang Weixiao

Journal of China & Foreign Highway

Bridge pile foundations in servic e are subjected to long-term scour erosion caused by sediment-laden water flow,leading to a gradual expansion of the eroded and worn areas.This in turn results in varying degrees of damage to the pile foundation structure and reduces the durability and safety of the bridge.In order to study the impact of scour erosion on bridge pile foundations,this study took the Hanjiang No.1 Bridge in Ankang City as the research object.The ANSYS FLUENT software was used to conduct three-dimensional numerical simulations of the pile foundation and analyze the distribution characteristics and patterns of scour erosion under different …


Research On Influence Of Shield Synchronous Grouting Parameters On Surface Deformation, LUO Xu, ZHANG Zhaofeng, FU Helin, CAO Guiqian, ZHAO Chuanming 2025 Changsha Metro Group Co ., Ltd., Changsha , Hunan 410000 , China

Research On Influence Of Shield Synchronous Grouting Parameters On Surface Deformation, Luo Xu, Zhang Zhaofeng, Fu Helin, Cao Guiqian, Zhao Chuanming

Journal of China & Foreign Highway

In order to determine reasonable grouting parameters,control surface settlement,and reduce the risk of excessive surface settlement caused by irrational synchronous grouting parameters,this study studied the shield tunnel project between maglev T 2 station and maglev T 3 station.A numerical simulation method was adopted to study the influence of grouting pressure,grouting volume,and the elastic modulus of slurry on surface deformation.The results show that the tunnel synchronous grouting has a significant effect on surface settlement control.A greater grouting pressure,equivalent grouting layer thickness,and elastic modulus of slurry mean a smaller surface settlement.As the three parameters increase,the variation range of surface settlement decreases and …


Intelligent Vehicle Path Tracking Control Integrating Road Adhesion Constraints, ZHANG Zhiguo, WANG Pu, ZHANG Xinglong, WANG Yan 2025 School of Mechanical Engineering , Southeast University , Nanjing , Jiangsu 211189 , China ;China Automotive Technology and Research Center Co ., Ltd ., Tianjin 300300 , China

Intelligent Vehicle Path Tracking Control Integrating Road Adhesion Constraints, Zhang Zhiguo, Wang Pu, Zhang Xinglong, Wang Yan

Journal of China & Foreign Highway

In the field of fault-tolerant control for intelligent vehicle path tracking,the existing methods based on model predictive control (MPC ) have limitations.They often assume that the vehicle model parameters are fixed and ignore the impact of dynamic changes in model parameters,which are caused by factors such as vehicle load changes and external environmental interference,on the path tracking accuracy.When the steering system fails,the front wheel steering angle commands calculated by MPC cannot be directly executed and need to be converted into yaw moment control.Although the existing sliding mode yaw moment control methods have strong robustness,the chattering problem affects the stability and …


Research On Parametric Method Of Highway Bim Based On Digital Delivery, LI Jinlong, WANG Xinnan 2025 CCCC Second Highway Consultants Co ., Ltd.,Wuhan , Hubei 430056 , China

Research On Parametric Method Of Highway Bim Based On Digital Delivery, Li Jinlong, Wang Xinnan

Journal of China & Foreign Highway

By analyzing the application points and the current situation of digital delivery in each stage of highway engineering construction,this study found that the lack of parameter management and definition in the modification and refinement process of building information modeling (BIM ) source files at each stage led to difficulties in the splitting and refinement of BIM at each stage and even the need for reconstruction.To this end,a method for strengthening the overall planning of the whole life cycle was proposed.By clarifying the demand for model parameters according to the application points of each stage,a mechanism for parameter reservation and classification …


Reconstruction Plan Of Small-Spacing Interchange Connection Sections On Expressway : A Case Study Of Xinlong‒Gangkou Interchange On Zhongshan‒Jiangmen Expressway, JIE Qiang, FU Xinsha 2025 Guangdong Communication Planning & Design Institute Group Co .,Ltd., Guangzhou , Guangdong 510440 , China

Reconstruction Plan Of Small-Spacing Interchange Connection Sections On Expressway : A Case Study Of Xinlong‒Gangkou Interchange On Zhongshan‒Jiangmen Expressway, Jie Qiang, Fu Xinsha

Journal of China & Foreign Highway

The plan design for the small-spacing interchange connection on the expressway directly affects operational efficiency and driving safety.To achieve the conversion of traffic flow between different expressways,this study explored the reconstruction plan of the connection section under the condition that the interchange spacing did not meet the Design Specification for Highway Alignment (JTG D20‒2017 ) and investigated two connection schemes,including auxiliary lane and collector-distributor lane by taking the Xinlong –Gangkou interchange of the Zhongshan‒Jiangmen Expressway reconstruction and expansion project as an example.The results show that the auxiliary lane is recommended in consideration of the long-term service level,speed coordination,operational efficiency,and engineering …


Design Of Champlain Bridge In Canada, XIE Yaning, ZHOU Yanfeng, Marwan Nader 2025 China Design Group Co . Ltd., Nanjing , Jiangsu 210014 , China

Design Of Champlain Bridge In Canada, Xie Yaning, Zhou Yanfeng, Marwan Nader

Journal of China & Foreign Highway

The Champlain Bridge,an iconic gateway spanning the St.Lawrence River in Montreal,showcases not only the excellence of engineering but also becomes an integral part of the city ’s landscape.With a main span of 240 m,the bridge employs a unique single-pylon harp-shaped double-plane cable-stayed structure.The upper pylon is inspired by a tuning fork in its lateral design,while the upper crossbeam artfully mimics the shape of a bow tie,endowing the bridge with a visual beauty that harmoniously blends elegance and strength.The bridge deck,with a total width of 60 m,was the widest double-plane cable-stayed bridge in the world when it was completed.The typical spans …


Research On Bridge Jacking Decision Based On Carbon Emission Analysis, ZHANG Xinmin, HU Chengze, GAO Hongbo, YANG Yunping, SUN Zhihong, CAO Hongyou 2025 Guangdong Provincial Highway Construction Co ., Ltd., Guangzhou , Guangdong 510000 , China

Research On Bridge Jacking Decision Based On Carbon Emission Analysis, Zhang Xinmin, Hu Chengze, Gao Hongbo, Yang Yunping, Sun Zhihong, Cao Hongyou

Journal of China & Foreign Highway

To lift the longitudinal section of existing bridges in highway reconstruction and expansion projects due to insufficient under-bridge clearance,this study took the reconstruction of a 32.5 m T-beam bridge in the reconstruction and expansion project of the Guangzhou‒Shenzhen Expressway as the research object.By using a carbon emission factor method,carbon emissions of three reconstruction schemes,including broken-column jacking,conversion of bearing pads into bridge piers,and demolition and reconstruction,were calculated under different lifting heights,and the corresponding construction and installation costs were compared.The results show that when the longitudinal section of the bridge is lifted to a certain height,the economic benefits of the broken-column jacking …


Research On Rc-Uhpc Composite Slab Frame Culvert Technology In Wave-Affected Areas, QIU Junfeng 2025 Fujian Communications Planning & Design Institute Co ., Ltd., Fuzhou , Fujian 350000 , China ;Research and Development Center of Transport Industry of New Materials , Technologies Application for Highway Construction and Maintenance of Offshore Areas , Fuzhou , Fujian 350000 , China

Research On Rc-Uhpc Composite Slab Frame Culvert Technology In Wave-Affected Areas, Qiu Junfeng

Journal of China & Foreign Highway

To address the problems in the construction of offshore bridges and culverts such as the structures susceptible to waves,limited layout,and high cost of soft foundation treatment,this paper proposed a new technical solution for reinforced concrete and ultra-high performance concrete (RC-UHPC ) composite slab frame culverts.With supporting engineering,the ordinary box culvert was selected as a comparison scheme for technical and economic analysis,and the design points and construction procedures of new structures were introduced.Based on the calculation results of the overall bearing force,the bearing performance of the top slab under different load conditions was analyzed,along with an investigation of the secondary internal …


Inverse Analysis Of Thermal Parameters Of Concrete Box Girder Based On De-Bp Neural Network, YAO Yong, YAN Yu, SUN Bo wen, WANG Yuesong, JIANG Tianyong 2025 China National Chemical Construction Investment Co ., Ltd., Beijing 102308 , China

Inverse Analysis Of Thermal Parameters Of Concrete Box Girder Based On De-Bp Neural Network, Yao Yong, Yan Yu, Sun Bo Wen, Wang Yuesong, Jiang Tianyong

Journal of China & Foreign Highway

In view of temperature cracks in concrete box girders easily occurring during construction,an inverse analysis method based on uniform design theory and differential evolution back propagation (DE-BP ) neural network was proposed to accurately obtain the thermal parameters of concrete box girders and ensure the reliability of temperature analysis of concrete box girders.This method established the nonlinear relationship between the temperature peak of characteristic points and the thermal parameters through the DE-BP neural network.By using the uniform design method and the Abaqus finite element numerical model,130 sets of sample data were generated.Based on the ratio of 12∶1 for training samples …


Field Test Research On Optimization Of Smooth Blasting Parameters Based On Drilling Speed, WANG Haitao, LU Jianghua, LIU Yang, HUANG Mingli, WU Xuan 2025 CCCC Central-South Engineering Company Ltd ., Changsha , Hunan 410000 , China

Field Test Research On Optimization Of Smooth Blasting Parameters Based On Drilling Speed, Wang Haitao, Lu Jianghua, Liu Yang, Huang Mingli, Wu Xuan

Journal of China & Foreign Highway

This study aims to address poor adaptability and timeliness in the design of smooth blasting hole parameters in t he past.With the drilling and blasting method-based construction of large cross-section tunnels in Botanggou and Tielugou along the Zunhua‒Qinhuangdao Expressway as the research background and Ⅲ and Ⅳ grade surrounding rocks of porphyritic granite as the research object,statistical regression analysis and theoretical derivation were conducted on the measured data during on-site drilling according to the rock solidity coefficient.Based on this,a simple parameter design method for a smooth blasting layer based on the drilling speed index of an air leg anchor rod …


Distribution Characteristics Of Internal Distress And Maintenance Decision-Making For Asphalt Pavement Based On Three-Dimensional Ground-Penetrating Radar, LI Xiaohua, SONG Liang, YE Wei, XIE Xiaodong, YANG Jiangang, GAO Jie 2025 School of Traffic & Logistics Engineering , Xinjiang Agricultural University , Urumqi , Xinjiang 830091 , China

Distribution Characteristics Of Internal Distress And Maintenance Decision-Making For Asphalt Pavement Based On Three-Dimensional Ground-Penetrating Radar, Li Xiaohua, Song Liang, Ye Wei, Xie Xiaodong, Yang Jiangang, Gao Jie

Journal of China & Foreign Highway

The distribution characteristics of internal distress in pavement structures and the corresponding maintenance decisions are crucial for improving road performance and extending service life.Based on three-dimensional ground-penetrating radar (3D GPR ) technology,this study investigated the internal distress of a 12-kilometer section of both driving and overtaking lanes of an expressway in Hubei Province.High-resolution images of internal pavement distress were obtained,and milling maintenance decisions were optimized by employing these images and a modular decision-making model.Through an efficient and non-destructive technique,the distribution characteristics of internal pavement distress were analyzed,and potential distress types were identified,providing a scientific basis for maintenance decision-making.Data analysis revealed …


Hickory Street Square Revitalization, Spencer Knight, Grace Dungan, Tim Kula, Evan Lauritsen, Lindsey Mennenga 2025 University of Nebraska - Lincoln

Hickory Street Square Revitalization, Spencer Knight, Grace Dungan, Tim Kula, Evan Lauritsen, Lindsey Mennenga

Honors Program: Senior Projects (Public)

The Hickory Street Square Revitalization Project seeks to transform a central public space in Sidney, Nebraska into a dynamic, community-oriented area that supports local events, economic activity, and cultural heritage. The project addresses six core objectives: 1) convertible street design, 2) parking lot reconfiguration, 3) public amenities, 4) event flexibility, 5) lighting and signage, and 6) old electric plant renovation. A conceptual design was developed by the design team (S.T.E.E.L. Sentinel Solutions) by synthesizing the most effective features of three preliminary alternatives, shaped further through community feedback and evolving project constraints. The final project design minimizes disruption to existing activity …


A Parametric Study Of Compact Wind Borne Debris In Tornadoes, Akash Yadav 2025 Clemson University

A Parametric Study Of Compact Wind Borne Debris In Tornadoes, Akash Yadav

All Theses

Debris lofted and transported by tornadoes is a significant source of damage during these storms. Several approaches have been taken to model such debris flight, ranging in complexity from fine-scale CFD simulations to coupling the compact debris flight equations with simplified analytic models for the tornado vortex. Both approaches have their merits, though the latter comes with significantly lower computational costs. Despite the simplifications, this second approach has successfully captured details of debris flight events established in post-tornado forensic surveys. Herein, we take advantage of the low computational cost of the latter approach to undertake a detailed parametric study of …


Comparison And Evaluation Of Overlay And Leveling Binder In Traffic Circle Construction, Pratik Neupane 2025 University of South Alabama

Comparison And Evaluation Of Overlay And Leveling Binder In Traffic Circle Construction, Pratik Neupane

Graduate Theses and Dissertations (2019 - present)

Traffic circles play a vital role in managing traffic flow and ensuring safety, yet their unique traffic conditions make them prone to early cracking and deformation. This study evaluated the performance of overlay and leveling binder asphalt mixtures for a reconstructed traffic circle at the University of South Alabama, using plant-mixed laboratory-compacted (PMLC) specimens. Volumetric analyses were performed to determine maximum specific gravity (Gmm), bulk specific gravity (Gmb), and air voids content. Laboratory tests were conducted on both the overlay and leveling binder layers using indirect tensile cracking test (IDEAL-CT) and indirect tensile rutting test (IDEAL-RT) to assess cracking tolerance …


Bayesian Network-Based Framework To Uncover Social Inequities In Flood Risk: Application To East Baton Rouge Parish, Louisiana, Fuad Hasan 2025 Louisiana State University and Agricultural and Mechanical College

Bayesian Network-Based Framework To Uncover Social Inequities In Flood Risk: Application To East Baton Rouge Parish, Louisiana, Fuad Hasan

LSU Master's Theses

Regional flood risk assessment requires understanding the complex interplay of sociodemographic, socioeconomic, hydrogeologic, built environment, and climatic variables that impact flood vulnerability. Traditional studies often focus on large-scale units, overlooking localized variations and disproportionate exposure within populations. To address these gaps, a methodological framework of flood risk assessment using the Bayesian network was proposed and applied to East Baton Rouge Parish, Louisiana, for the August 2016 flood event to identify relationships between flood risk variables at the housing unit level. Flood exposure representativeness (FER) was determined using the Bayesian network's inference capabilities to identify over- or under-represented groups. This study …


Advancing Sustainable Road Construction With Cold Mix Rap And Rejuvenator, Abeeb G. Oyelere 2025 University of South Alabama

Advancing Sustainable Road Construction With Cold Mix Rap And Rejuvenator, Abeeb G. Oyelere

Shelby Hall Graduate Research Forum Presentations

Presentation slides for a presentation given at the 1st annual Shelby Hall Graduate Research Forum at the University of South Alabama.


Modelled Flooding Impacts On Lower Fish River Watershed, Sebastian Loschner 2025 University of South Alabama

Modelled Flooding Impacts On Lower Fish River Watershed, Sebastian Loschner

Shelby Hall Graduate Research Forum Posters

This study investigates the impacts of compound flooding in the Lower Fish River watershed, Baldwin County, Alabama, with a focus on the potential effects of sea level rise due to climate change. Coastal flooding, particularly in smaller watersheds, is a growing concern as it results from the interaction of multiple factors, including rainfall, tidal changes, and extreme weather events. Compound flooding, which involves multiple flood drivers, is expected to worsen with climate change, as increased precipitation and rising sea levels create heightened flood risks. However, existing research on compound flooding predominantly focuses on large-scale watersheds, leaving a knowledge gap in …


Static Performance And Stability Of A Multi-Span Hybrid Continuous Rigid Frame Bridge With High Piers, HUANG Yu, LIU Guanyu, YI Jianbo, XING Xuan, SU Miao, PENG Hui 2025 School of Civil Engineering , Changsha University of Science & Technology , Changsha , Hunan 410114 , China ;China First Highway Engineering Co ., Ltd., Lishui , Zhejiang 323000 , China

Static Performance And Stability Of A Multi-Span Hybrid Continuous Rigid Frame Bridge With High Piers, Huang Yu, Liu Guanyu, Yi Jianbo, Xing Xuan, Su Miao, Peng Hui

Journal of China & Foreign Highway

In order to study the static performance and stability of a steel-concrete composite continuous rigid frame bridge in Suichang,Zhejiang Province,a single girder and girder lattice finite element model for the whole bridge was established by using Midas Civil,and a local solid finite element model was established by using Ansys.A detailed analysis of the structural displacement and stress state of the bridge in use and the local stress in the solid section of the pier and girder under different loads was carried out.The influence of the pile-bottom restraint stiffness and pier-girder connection form on the overall stability of the bridge was …


Influence Of Train Speed On Thermal Insulation And Anti-Thawing Length For Tunnel In Cold Region, HUANG Huanan, CHEN Yong, WANG Yibo, WU Yaping 2025 Henan College of Industry & Information Technology , Jiaozuo , Henan 454000 , China

Influence Of Train Speed On Thermal Insulation And Anti-Thawing Length For Tunnel In Cold Region, Huang Huanan, Chen Yong, Wang Yibo, Wu Yaping

Journal of China & Foreign Highway

To study the influence of train speed on thermal insulation and anti-thawing measures for surrounding rock of tunnels in cold regions,it is necessary to analyze the temperature field.By using the Kunlun Mountain Tunnel Project in cold regions as a case study,the effects of external atmospheric temperature,piston wind effects caused by varying train speeds,and the driving resistance on the distribution of the tunnel ’s internal temperature field were considered.A three-dimensional numerical calculation model including the surrounding rock,concrete lining,and tunnel air was established by utilizing the thermo-fluid-structure interaction (TFSI ) technique.The thermal environment variations caused by trains at different speeds were predicted.The …


Digital Commons powered by bepress