2024 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp),
2024
Montana Tech Library
2024 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Accuracy Of Nitrate Hysteresis And Flushing For Agricultural Watersheds In The Midwest,
2024
Purdue University
Accuracy Of Nitrate Hysteresis And Flushing For Agricultural Watersheds In The Midwest, Noah Rudko, Sara K. W. Mcmillian, Jane Frankenberger, François Birgand
Graduate Industrial Research Symposium
Storm event-based metrics, such as hysteresis (HI) and flushing (FI), are used to differentiate nitrate pathways and sources, which is essential for watershed management. Estimations of these event-based metrics typically use high frequency (15-minute – hourly) measurements, but daily data are also used due to their greater availability. To date, there has been no study assessing how using lower frequency samples affect the accuracy of HI and FI, which could skew interpretation of potential nutrient pathways and sources. We used continuous measurements of nitrate collected at 9 watersheds throughout the Midwest spanning 448 storms. HI and FI were estimated from …
Automated Tree Mortality Detection Using Ubiquitously Available Public Data,
2024
California Polytechnic State University, San Luis Obispo
Automated Tree Mortality Detection Using Ubiquitously Available Public Data, Michael T. Huggins
Master's Theses
Understanding the dynamic interplay between fire severity, topography, and tree mortality, is crucial for predicting future forest dynamics and enhancing resilience against climate change-induced wildfire regimes. This thesis develops a multi-sensor approach for automated estimation of tree mortality, then applies it to examine trends in tree mortality over a six-year period across a fire affected study site in the Trinity River basin in Northern California. The Random Forest model uses publicly available USGS 3D Elevation Program Lidar (3DEP) and NAIP imagery as inputs and is likely to be easily adaptable to other landscapes. The model had a Receiver Operating Characteristic …
Water Quality Assessment For San Luis Obispo Creek And Stenner Creek,
2024
California Polytechnic State University, San Luis Obispo
Water Quality Assessment For San Luis Obispo Creek And Stenner Creek, Brent Flemmer
Master of Science in Environmental Sciences and Management Projects
Water quality was assessed in five stream segments in San Luis Obispo and Stenner Creeks in Spring of 2023. Two of the five sites were located along San Luis Obispo Creek, and three located along Stenner Creek. Criteria to evaluate these aquatic systems was provided by the Standard Operating Procedures of the Surface Water Ambient Monitoring Program, formulated by the State Water Resources Control Board. These procedures describe the methodology surrounding the collection of chemical, physical, and biological parameters of stream systems; streamflow, substrate, flow habitat, chemical water quality, and benthic macroinvertebrates are some of the criteria collected that allows …
Procedures For Rangeland Condition Assessment In The Kimberley 2022,
2024
Department of Primary Industries and Regional Development, Western Australia
Procedures For Rangeland Condition Assessment In The Kimberley 2022, Department Of Primary Industries And Regional Development
Natural resources published reports
This report defines the procedures used in 2022 by DPIRD to complete rangeland condition assessment (RCA) in the Kimberley region which has grass-based pastures. For the rest of the pastoral estate, DPIRD uses the Procedures for RCA in the Pilbara and southern rangelands which have predominantly shrub pastures.
RCA is the process DPIRD uses to make systematic, lease-level assessment of rangeland. Rangeland condition considers both the condition of pastures (as defined in the 'Pasture condition guide for the Kimberley') and soils as determined by erosion, using the erosion assessment method on pastoral lands in Western Australia (WA). The methods have …
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022,
2024
Montana Tech Library
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022,
2024
Montana Tech Library
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2024 Draft Final Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp),
2024
Montana Tech Library
2024 Draft Final Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Health And Safety Plan (Hasp) Butte Priority Soils Operable Unit,
2024
Montana Tech Library
Health And Safety Plan (Hasp) Butte Priority Soils Operable Unit, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Technical Memorandum Grove Gulch Earth Volumetric Studio Model Inputs,
2024
Management Service Company, ARCO
Technical Memorandum Grove Gulch Earth Volumetric Studio Model Inputs, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Attachment A Demonstration Of Need For Butte Priority Soils Operable Unit (Bpsou) Temporary Construction Surface Water Performance Standards Variance Request For Grove Gulch Sedimentation Bay Remedial Action Site,
2024
Management Service Company, ARCO
Attachment A Demonstration Of Need For Butte Priority Soils Operable Unit (Bpsou) Temporary Construction Surface Water Performance Standards Variance Request For Grove Gulch Sedimentation Bay Remedial Action Site, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Grove Gulch Sedimentation Bay Final Remedial Design Report,
2024
Montana Tech Library
Grove Gulch Sedimentation Bay Final Remedial Design Report, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Pilot Project Quality Assurance Project Plan 2024 Update,
2024
Montana Tech Library
Pilot Project Quality Assurance Project Plan 2024 Update, Alloy Group
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Environmental Analysis Of Codfish Production And Consumption In Portugal,
2024
School for International Training
Environmental Analysis Of Codfish Production And Consumption In Portugal, Ayla Frost, Joana Almeida, Joana Dionisio, Radu Godina, Cátia Magro
Journal of Critical Global Issues
Codfish, a typical dish consumed frequently in Portugal, is fished in the cold Northern Atlantic waters far from the Portuguese coast. Thus, regional tensions and the environmental impacts of Portuguese codfish importation and production are significant current issues. The present study uses a life cycle assessment methodology to evaluate the array of environmental impacts of the production of 1 kg of codfish, following a cradle to gate approach. The life cycle inventory was grouped into catch and preprocessing, transit, and curing stages. The data collection of products and processes in each stage was based on scientific peer reviewed documents, technical …
Re: Silver Bow Creek Butte Area Npl Site 4th Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She,
2024
Management Service Company, ARCO
Re: Silver Bow Creek Butte Area Npl Site 4th Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site 4th Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She,
2024
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site 4th Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Construction Completion Report (Non-Residential Parcels – Indoor Soil) – Butte High School (Dated February 12, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Construction Completion Report (Non-Residential Parcels – Indoor Soil) – Butte High School (Dated February 12, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) (Non-Residential) - Interior School Dust - Investigation Summary Report–– Emerson Elementary (Dated October 13, 2023),
2024
Montana Tech Library
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) (Non-Residential) - Interior School Dust - Investigation Summary Report–– Emerson Elementary (Dated October 13, 2023), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments On: Berkeley Pit And Discharge Pilot Project, Quarterly Pilot Project Report, Third Quarter 2023, Dated December 20, 2023,
2024
Environmental Protection Agency
Re: Comments On: Berkeley Pit And Discharge Pilot Project, Quarterly Pilot Project Report, Third Quarter 2023, Dated December 20, 2023, Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System -Third Quarter 2022 (Dated November 16, 2023),
2024
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System -Third Quarter 2022 (Dated November 16, 2023), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
