Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023,
2024
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Enhancing Landslide Susceptibility Modelling Through A Novel Non-Landslide Sampling Method And Ensemble Learning Technique,
2024
China University of Geosciences Wuhan
Enhancing Landslide Susceptibility Modelling Through A Novel Non-Landslide Sampling Method And Ensemble Learning Technique, Chao Zhou, Yue Wang, Ying Cao, Ramesh P. Singh, Bayes Ahmed, Mahdi Motagh, Yang Wang, Ling Chen, Guangchao Tan, Shanshan Li
Mathematics, Physics, and Computer Science Faculty Articles and Research
In recent years, several catastrophic landslide events have been observed throughout the globe, threatening to lives and infrastructures. To minimize the impact of landslides, the need of landslide susceptibility map is important. The study aims to extract high-quality non-landslide samples and improve the accuracy of landslide susceptibility modelling (LSM) outcomes by applying a coupled method of ensemble learning and Machine Learning (ML). The Zigui-Badong section of the Three Gorges Reservoir area (TGRA) in China was considered in the present study. Twelve influencing factors were selected as inputs for LSM, and the relationship between each causal factor and landslide spatial development …
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg, Thomas J. Beckman
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh,
2024
Environmental Protection Agency
Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Construction Completion Report Butte Career Center / Webster GarIeld, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc,
2024
Environmental Protection Agency
Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc,
2024
Environmental Protection Agency
Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design,
2024
Management Service Company, ARCO
Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Long Term Monitoring And Research On Temperate Glaciers And Related Environments Provide Technological Support For Regional Sustainable Development,
2024
State Key Laboratory of Cryospheric Science and Frozen Soil Engineering, Northwest Institute of Eco-Environment and Resources, Chinese Academy of Sciences, Lanzhou 730000, China
Yulong Snow Mountain National Field Observation and Research Station for Cryosphere and Sustainable Development, Chinese Academy of Sciences, Lijiang 674100, China
Midui Glacier-Guangxie Lake Disaster Field Science Observation and Research Station of Tibet Autonomous Region, Nyingchi 860000, China
Long Term Monitoring And Research On Temperate Glaciers And Related Environments Provide Technological Support For Regional Sustainable Development, Shijin Wang, Shichang Kang, Tuo Chen, Yuanqing He, Meixue Yang, Quanlian Li, Hewen Niu, Tao Pu, Binglin Zhang, Yanjun Che, Wanqin Guo, Xingguo Yan, Xinggang Ma, Rongjun Wang
Bulletin of Chinese Academy of Sciences (Chinese Version)
After nearly 20 years of development, the Yulong Snow Mountain National Field Observation and Research Station for Cryosphere and Sustainable Development, Chinese Academy of Sciences has built a field comprehensive observation system and data online visualization platform of temperate glacier and environment integrating observation, research, demonstration, and service. Based on the long-term positioning monitoring of temperate glaciers and the environment, and focusing on key scientific issues related to sustainable development in temperate glacier areas, this study deeply analyzes the mechanism of changes in temperate glaciers, reveals the hydrological, microorganisms, and climatic effects of temperate glacier change, evaluates the effectiveness of …
Yulong Snow Mountain National Field Observation And Research Station For Cryosphere And Sustainable Development,
2024
Chinese Academy of Sciences
Yulong Snow Mountain National Field Observation And Research Station For Cryosphere And Sustainable Development
Bulletin of Chinese Academy of Sciences (Chinese Version)
No abstract provided.
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School,
2024
Montana Tech Library
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024),
2024
Environmental Protection Agency
Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Type B Borrow Material Submittal #2 (Dated February 14, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Type B Borrow Material Submittal #2 (Dated February 14, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Medical Monitoring Working Group Meeting Minutes,
2024
Atlantic Richfield Company
Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2,
2024
Montana Tech Library
Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Ground Electric Field, Atmospheric Weather And Electric Grid Variations In Northeast Greece Influenced By The March 2012 Solar Activity And The Moderate To Intense Geomagnetic Storms,
2024
Democritus University of Thrace (DUTH)
Ground Electric Field, Atmospheric Weather And Electric Grid Variations In Northeast Greece Influenced By The March 2012 Solar Activity And The Moderate To Intense Geomagnetic Storms, Georgios Anagnostopoulos, Anastasios Karkanis, Athanasios Kampatagis, Panagiotis Marhavilas, Sofia-Anna Menesidou, Dimitrios Efthymiadis, Stefanos Keskinis, Dimitar Ouzounov, Nick Hatzigeorgiu, Michael Danakis
Mathematics, Physics, and Computer Science Faculty Articles and Research
In a recent paper, we extended a previous study on the solar solar influence to the generation of the March 2012 heatwave in the northeastern USA. In the present study we check the possible relationship of solar activity with the early March 2012 bad weather in northeast Thrace, Greece. To this end, we examined data from various remote sensing instrumentation monitoring the Sun (SDO satellite), Interplanetary space (ACE satellite), the Earth’s magnetosphere (Earth-based measurements, NOAA-19 satellite), the top of the clouds (Terra and Aqua satellites), and the near ground atmosphere. Our comparative data analysis suggests that: (i) the winter-like weather …
Draft Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2,
2024
Montana Tech Library
Draft Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Soil) - Butte High School,
2024
Montana Tech Library
Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Soil) - Butte High School, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
