Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

7,403 Full-Text Articles 10,517 Authors 2,305,939 Downloads 200 Institutions

All Articles in Environmental Monitoring

Faceted Search

7,403 full-text articles. Page 4 of 302.

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. 2026 Montana Tech Library

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Type B Borrow Material Submittal #3 (Dated May 6, 2026), Molly Roby 2026 Environmental Protection Agency

Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Type B Borrow Material Submittal #3 (Dated May 6, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby 2026 Environmental Protection Agency

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson 2026 Montana Tech Library

Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 1st Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson 2026 Management Service Company, ARCO

Re: 1st Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Ecological Interest Theory Of “Lucid Waters And Lush Mountains Are Invaluable Assets” And Its Application In The Yellow River Basin, Guangqian WANG, Deyu ZHONG 2026 State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing 100084, China

Ecological Interest Theory Of “Lucid Waters And Lush Mountains Are Invaluable Assets” And Its Application In The Yellow River Basin, Guangqian Wang, Deyu Zhong

Bulletin of Chinese Academy of Sciences (Chinese Version)

To address the core challenges of quantifying ecological value and converting it into economic gains, this study proposes a theoretical framework of ecological interest (EI) based on the principle that “lucid waters and lush mountains are invaluable assets”. Three fundamental origins of ecological interest are explained, including the temporal value discount, the spatial ecological compensation, and the civilizational occupation-compensation balance. These three dimensions establish the logical connection between ecological and economic values. Setting a 5% annual simple interest rate as the benchmark and adopting “Lucid Waters and Lush Mountains” green certificates as the standardized ecological assets for property rights delineation …


Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quantifying Co2 And Ch4 Fluxes In A Semi-Arid Floodplain: Assessing Spatial And Temporal Drivers, Miles E. Kelsey 2026 University of New Mexico

Quantifying Co2 And Ch4 Fluxes In A Semi-Arid Floodplain: Assessing Spatial And Temporal Drivers, Miles E. Kelsey

Earth and Planetary Sciences ETDs

Rivers transport sediment and carbon across Earth’s surface, and their floodplains can store carbon over decades to millennia, making them important to terrestrial carbon management. While soil carbon can persist long term, it may be released as greenhouse gases through processes like methanogenesis and heterotrophic respiration. Environmental controls on these fluxes remain poorly constrained across floodplains in different climate and geomorphic setting, but especially in semi-arid systems where measurements are limited. To address this gap, we quantified CO₂ and CH₄ fluxes along the Middle Rio Grande (New Mexico, USA) using 227 chamber measurements collected May to November 2025 at three …


2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. 2026 Montana Tech Library

2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Assessing Vegetation Health Following The 2014 Carlton Complex Fire Using Remote Sensing, Rachael SV Pentico 2026 Eastern Washington University

Assessing Vegetation Health Following The 2014 Carlton Complex Fire Using Remote Sensing, Rachael Sv Pentico

2026 Symposium

Climate change, combined with decades of altered fire regimes and fire suppression, has increased fuel accumulation across western U.S. forests, contributing to more frequent, larger, and more intense wildfires. Remote sensing offers an effective approach for analyzing these large-scale fire events and their ecological impacts, as satellite imagery enables affordable, accessible, and reproducible monitoring of vegetation change across broad spatial and temporal scales. This study examined the 2014 Carlton Complex Fire in the Methow Valley, Washington. Burning 265,108 acres, it was the largest wildfire in Washington State history at the time and caused extensive agricultural and forest damage. Post-fire vegetation …


Urban Conflagrations: Structural Ash And Soil Metal(Loid) Contamination After California’S Eaton And Palisades Fires, S. Anselme Dossou, Leon Kelly, P. Louis Lu, Robin Jones, Oliver O'Donnell, Justin St. P. Walsh, Daniel D. Richter 2026 Duke University

Urban Conflagrations: Structural Ash And Soil Metal(Loid) Contamination After California’S Eaton And Palisades Fires, S. Anselme Dossou, Leon Kelly, P. Louis Lu, Robin Jones, Oliver O'Donnell, Justin St. P. Walsh, Daniel D. Richter

Art Faculty Articles and Research

In the weeks after California’s Eaton-Palisades wildfires, structural ash of burned homes and soils from yards and curbsides were sampled for analysis of Pb, As, and eight metals from 32 burned residences. About six months after fires and after US Army Corps of Engineers’ Phase 2 cleanups removed 15 cm from structural ash footprints, 17 properties were resampled within about a meter of original sampling sites. Concentrations of metal(oid)s in structural ash and residential soils varied between and within properties with significant spatial and temporal patterns. Lead concentrations were highest in structural ash and soil of yards of select pre-1970s …


Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson 2026 Management Service Company, ARCO

Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress