Integrating Geomorphology-Based Terrain Segmentation With Machine Learning For Landslide Susceptibility Assessment In The Darjeeling Sikkim Himalaya, India,
2026
Banaras Hindu University
Integrating Geomorphology-Based Terrain Segmentation With Machine Learning For Landslide Susceptibility Assessment In The Darjeeling Sikkim Himalaya, India, Saurabh Singh, Ashwani Raju, Ascanio Rosi, Ramesh P. Singh, Sanjeet Kumar, Mario Floris, Sansar Raj Meena
Mathematics, Physics, and Computer Science Faculty Articles and Research
Precise assessment of landslide potential in tectonically active mountainous areas like the Darjeeling Sikkim Himalaya (DSH) is a scientific challenge because of the complexity of the terrain and the factors controlling landslides. Despite several studies on landslide susceptibility mapping in the DSH, most conventional pixel-based approaches struggle to demarcate the geomorphological units and complex nonlinear relationships among the landslide conditioning factors. Furthermore, incomplete landslide inventories can also hamper landslide susceptibility assessment quality. Due to all these limitations, more robust methods integrated with geomorphologically based terrain segmentation and advanced machine learning methods are required, which will not only determine the landslide …
Re: Request For Change To The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2026 Update),
2026
Management Service Company, ARCO
Re: Request For Change To The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2026 Update), Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Operations And Maintenance Report Grove Gulch Sedimentation Bay - Post-Storm 10.13.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2026
Management Service Company, ARCO
Operations And Maintenance Report Grove Gulch Sedimentation Bay - Post-Storm 10.13.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Hidden Thermal Signatures Reveal The Microclimatic Influence Of Scheduled Cave Tourism,
2026
Institute of Rock Structure & Mechanics CAS
Hidden Thermal Signatures Reveal The Microclimatic Influence Of Scheduled Cave Tourism, Matt Rowberry, John Gunn, Andrew Smith
International Journal of Speleology
Tourist activity is widely recognised as a source of cave microclimate disturbance, yet visitor-induced variability is difficult to distinguish from natural environmental fluctuations. The coronavirus pandemic created a natural experiment at Poole’s Cavern, United Kingdom, in which periods of complete closure could be compared with contrasting visitor access regimes. Two years of high resolution temperature records from six monitoring points were analysed. Harmonic regression and a state space model removed deterministic diurnal cycles and lower frequency temperature variability. The remaining residual variability differed systematically among visitor access regimes and between daytime and nighttime conditions. Spectral analysis of the residuals identified …
Geological Investigation Of Mass-Transport Morphodynamics On A River-Dominated Subaqueous Delta,
2026
Louisiana State University and Agricultural and Mechanical College
Geological Investigation Of Mass-Transport Morphodynamics On A River-Dominated Subaqueous Delta, Nathan Figueredo
LSU Doctoral Dissertations
The Mississippi River Delta has shown documented declines in sediment accumulation offshore of its main channels. The subaqueous delta offshore, also known as the Mississippi River Delta Front (MRDF), is being impacted by declines in sediment supply, and experience intense morphodynamic processes. The major work of this dissertation is presented in three Chapters (2 – 4), preceded by an introduction, and followed by a summary of conclusions. To explore relationships among sediment supply, accumulation, and seabed morphodynamics, sediment cores were collected from mudflow lobes, undisturbed sediment, and gullies at ~20 – 230 m water depth.
Chapter 2 (Figueredo et al., …
Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report,
2026
Montana Tech Library
Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated July 31, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated July 31, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr),
2026
Environmental Protection Agency
Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr),
2026
Montana Tech Library
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Hydraulic Capacity Improvements Interim Operations And Water Management Plan (Dated September 18, 2026),
2026
Environmental Protection Agency
Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Hydraulic Capacity Improvements Interim Operations And Water Management Plan (Dated September 18, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Revision October 2026,
2026
Management Service Company, ARCO
Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Revision October 2026, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Unreclaimed Sites Sampling: Ur-44 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2024 Unreclaimed Sites Sampling: Ur-44 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Heavy-Duty Diesel Vehicle Deterioration: Impact Of Vehicle Age And Emission Control Technology On Nox Emissions - Preprint,
2026
Brigham Young University - Provo
Heavy-Duty Diesel Vehicle Deterioration: Impact Of Vehicle Age And Emission Control Technology On Nox Emissions - Preprint, Amber L. Gurecki Allen, Andrew R. Colman, Max D. Sommer, William D. Waddoups, Darrell B. Sonntag
FEAT Publications
Pre-print manuscript.
Abstract
This study examines the effect of aging and deterioration on NOx emissions from heavy-duty diesel trucks (HDDTs) with different emission control technologies, including Engine Control only, exhaust gas recirculation (EGR), and selective catalytic reduction (SCR). In-use tailpipe emissions were measured from 12,023 HDDTs from 13 roadside measurement campaigns conducted in California and Utah between 2008 and 2024. Vehicle registration records and the Environmental Protection Agency’s (EPA) engine certification database were used to identify engine NOx control technology. At younger ages, SCR-equipped HDDTs generally emitted significantly less NOx than non-SCR-equipped HDDTs. However, after several years …
Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area Remedy Effectiveness Evaluation Phase 1 – Draft Updated Conceptual Site Model,
2026
Montana Tech Library
Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area Remedy Effectiveness Evaluation Phase 1 – Draft Updated Conceptual Site Model, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
