Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Heavy-Duty Diesel Vehicle Deterioration: Impact Of Vehicle Age And Emission Control Technology On Nox Emissions - Preprint,
2026
Brigham Young University - Provo
Heavy-Duty Diesel Vehicle Deterioration: Impact Of Vehicle Age And Emission Control Technology On Nox Emissions - Preprint, Amber L. Gurecki Allen, Andrew R. Colman, Max D. Sommer, William D. Waddoups, Darrell B. Sonntag
FEAT Publications
Pre-print manuscript.
Abstract
This study examines the effect of aging and deterioration on NOx emissions from heavy-duty diesel trucks (HDDTs) with different emission control technologies, including Engine Control only, exhaust gas recirculation (EGR), and selective catalytic reduction (SCR). In-use tailpipe emissions were measured from 12,023 HDDTs from 13 roadside measurement campaigns conducted in California and Utah between 2008 and 2024. Vehicle registration records and the Environmental Protection Agency’s (EPA) engine certification database were used to identify engine NOx control technology. At younger ages, SCR-equipped HDDTs generally emitted significantly less NOx than non-SCR-equipped HDDTs. However, after several years …
Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp),
2026
Montana Tech Library
Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Fisheries Science Update - Pilbara Demersal Scalefish Resource - October 2026,
2026
Department of Primary Industries and Regional Development, Western Australia
Fisheries Science Update - Pilbara Demersal Scalefish Resource - October 2026, Department Of Primary Industries And Regional Development, Western Australia
Fisheries Science Updates
The Department of Primary Industries and Regional Development (DPIRD) monitors the status of Western Australia’s demersal scalefish resources by undertaking periodic stock assessments on key indicator species.
This summary provides key outcomes of the 2026 Pilbara red emperor stock assessment (Resource Assessment Report No. 12).
Resource Assessment Report No. 12: North Coast Demersal Scalefish Resource: Pilbara Red Emperor 2026 Assessment,
2026
Department of Primary Industries and Regional Development, Western Australia
Resource Assessment Report No. 12: North Coast Demersal Scalefish Resource: Pilbara Red Emperor 2026 Assessment, Fabian I. Trinnie, Rubie Evans-Powell, Brett Crisafulli, S. A. Hesp, Ainslie Denham, Dion Boddington, Craig L. Skepper
Resource Assessment Reports
Executive Summary
The North Coast Demersal Scalefish Resource (NCDSR) comprises ecological suites of tropical demersal fish species that occur predominantly in inshore (20–250 m deep) and offshore (> 250 m deep) waters of the North Coast Bioregion (NCB). More than 60 demersal species are landed by fisheries operating in the Kimberley and Pilbara regions of the NCB each year, including higher-valued species, such as red emperor (Lutjanus sebae), goldband snapper (Pristipomoides multidens), rankin cod (Epinephelus rankini), and ruby snapper (Etelis boweni), and lower-valued species, such as bluespotted emperor (Lethrinus punctulatus).
The Pilbara Demersal Scalefish Resource (PDSR) is harvested by the …
Draft Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan,
2026
Montana Tech Library
Draft Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Quality Assurance Project Plan - Spokane River Pfas Study,
2026
Eastern Washington University
Quality Assurance Project Plan - Spokane River Pfas Study, Chad Pritchard
EWU PFAS Research Collection
Assessing the impacts of poly- and perfluoroalkyl substances (PFAS) contamination across multiple aquifers and multiple sources requires a detailed understanding of the hydrogeologic framework to quantifiably determine PFAS sources. The West Plains of eastern Washington is an ideal natural laboratory to study the fate and transport of PFAS because the general geohydrologic framework has been established and collaboration with several related PFAS projects will maximize the use of grant funds. This project will help the population, environment, and commercial entities of the West Plains by building a transport model, delineating PFAS contamination, and using unique PFAS distribution at different locations …
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Operations And Maintenance Report Grove Gulch Sedimentation Bay For Third Quarter 2026 And Post-Storm 09.22.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2026
Management Service Company, ARCO
Operations And Maintenance Report Grove Gulch Sedimentation Bay For Third Quarter 2026 And Post-Storm 09.22.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2026,
2026
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2026, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Age Differences In Perceived Individual And Community Recovery After Tornadoes: Implications For Community-Centered Recovery Policy In An Aging Society,
2026
Chapman University
Age Differences In Perceived Individual And Community Recovery After Tornadoes: Implications For Community-Centered Recovery Policy In An Aging Society, Sizhuo Chen, Zhen Cong
Health Sciences and Kinesiology Faculty Articles
"This study examines perceived individual recovery and perceived community recovery among tornado survivors across three waves spanning four years. Using three-wave longitudinal survey data from survivors in Dallas, Texas; Nashville, Tennessee; and Birmingham, Alabama collected in 2021, 2022, and 2025, we estimate recovery trajectories using linear mixed-effects growth models. We link respondents to tract-level SVI 2020 component measures to examine whether tract-level social vulnerability contextualizes age differences in recovery perceptions. We ask: (1) How do perceived individual recovery and perceived community recovery change over time? (2) Do these trajectories differ by age group? (3) Do community social vulnerability measures contextualize …
Understanding The Role Of Data Science Applications In Soil And Water Health,
2026
Clemson University
Understanding The Role Of Data Science Applications In Soil And Water Health, Payton Davis, Debabrata Sahoo, Dara Park, Brook Russell
Forestry and Natural Resources
Data science is an emerging field that can be incorporated into many disciplines, including environmental science. Data science can provide valuable information from data, enhancing the understanding of systems and environments. This publication is intended to give an overview of the different aspects of data science and how data science can be leveraged into and applied to soil and water health.
Oco-3 Meets Ecostress: Insights Into Ecosystem Diurnal Water-Use Efficiency From Co-Located Solar-Induced Fluorescence And Thermal Observations,
2026
University of California, Santa Barbara
Oco-3 Meets Ecostress: Insights Into Ecosystem Diurnal Water-Use Efficiency From Co-Located Solar-Induced Fluorescence And Thermal Observations, Zoe Amie Pierrat, Thomas P. Kurosu, Abhishek Chatterjee, Joshua B. Fisher, Maggie Johnson, Le Kuai, Kanishka Mallick, Nicholas Parazoo, Benjamin Wiebe, Kerry Cawse-Nicholson
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Terrestrial ecosystem regulation of carbon and water fluxes is critical for constraining climate–biosphere feedbacks but remains poorly quantified across space and time. Here, we evaluate whether co-located observations from NASA's Orbiting Carbon Observatory-3 (OCO-3) and the ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS) can reproduce ecosystem water use efficiency (WUE) dynamics observed at FLUXNET sites across temporal scales, vegetation types, climates, and drought conditions. We created the ECOCO3 data set, which harmonizes OCO-3 and ECOSTRESS observations in space and time. ECOCO3 captures broad seasonal and diurnal carbon and water flux patterns including midday drought responses. Sampling sensitivity analysis …
Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 135 – Washoe Sampling Works,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 135 – Washoe Sampling Works, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
