Re: Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 9 – Clark Street Dump,
2026
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 9 – Clark Street Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine,
2026
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp) Request For Change Ur-2026-Ra-01,
2026
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp) Request For Change Ur-2026-Ra-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2nd Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2026
Management Service Company, ARCO
Re: 2nd Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated August 24, 2026) And The 2026 Draft Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated August 24, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated August 24, 2026) And The 2026 Draft Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated August 24, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr),
2026
Montana Tech Library
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
The purpose of this Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites Construction Completion Report (CCR) is to describe the tasks completed as described in the Final BPSOU UR Sites: UR-35 Remedial Action Work Plan (RAWP) (referred to herein as RAWP; Atlantic Richfield Company, 2025) (Appendix A). This CCR was prepared to outline Remedial Action (RA) tasks performed at the UR source area, UR-35, within the BPSOU (referred to herein as UR-35 Site or Site) as part of the Further Remedial Elements Scope of Work described in the BPSOU Consent Decree (EPA, 2020). All work was completed according to …
Re: Conditional Approval Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated August 3, 2026),
2026
Environmental Protection Agency
Re: Conditional Approval Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated August 3, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2026 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2026
Management Service Company, ARCO
Re: 2026 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate-90,
2026
Atlantic Richfield Company
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate-90, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine,
2026
Atlantic Richfield Company
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump,
2026
Atlantic Richfield Company
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill,
2026
Atlantic Richfield Company
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques,
2026
Pukyong National University
Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques, Youngmin Seo, Seung Hee Kim, Menas Kafatos, Jinsoo Kim, Yangwon Lee
Institute for ECHO Articles and Research
The increasing frequency of wildfires under a changing climate has led to extensive ecosystem destruction, highlighting the need for reliable burned area assessment using satellite imagery. Single-satellite data are constrained by observation gaps and interference from smoke and clouds, whereas multi-satellite data fusion can mitigate these limitations. Nonetheless, the fusion techniques still encounter challenges such as spatial information loss from resolution differences and cross-satellite domain mismatch. This study presents a burned area mapping framework that integrates super-resolution (SR) with transfer learning to address spatial and domain gaps in multi-satellite data. Specifically, Landsat-8 imagery is super-resolved to 7.5 m resolution, and …
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 16, 2023, at the Butte Reclamation Evaluation System (BRES) No. 31 – Waste Dump #5 Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established …
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp),
2026
Montana Tech Library
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Backfill and Cover Material Quality Assurance Project Plan (QAPP) provides the procedures and protocols necessary to conduct sampling and geotechnical characterization activities on import borrow and other externally sourced materials that will be used in backfill, cover soil, or engineered caps for upcoming BPSOU remediation activities described in the BPSOU Consent Decree (CD) (referred to as BPSOU CD; EPA, 2020a) Further Remedial Elements Scope of Work (FRESOW) (Attachment C of Appendix D to the BPSOU CD), the 2020 Residential Metals Abatement Program (RMAP) Unilateral Administrative Order (UAO) Amendment (EPA, 2020a), and ongoing maintenance …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp),
2026
Montana Tech Library
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp),
2026
Montana Tech Library
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp),
2026
Montana Tech Library
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
Multiple Secondary Risks Triggered By Rapid Rising Of Groundwater Level And Corresponding Tactics In The North China Plain,
2026
Center for Agricultural Resources Research, Institute of Genetics and Developmental Biology, Chinese Academy of Sciences, Shijiazhuang 050021, China; University of Chinese Academy of Sciences, Beijing 100049, China
Multiple Secondary Risks Triggered By Rapid Rising Of Groundwater Level And Corresponding Tactics In The North China Plain, Yanjun Shen, Fubao Sun, Congqiang Liu, Fengchang Wu
Bulletin of Chinese Academy of Sciences (Chinese Version)
In recent years, following the implementation of the South-to-North Water Diversion Project and comprehensive control of groundwater over-exploitation, coupled with natural factors such as more frequent and intensified extreme rainstorms, the groundwater level at large extent of the North China Plain has stopped declining and even started rising, with gradual recovery of groundwater storage. Nevertheless, the rapid rise in groundwater levels has disrupted the long-standing hydrological-geological-ecological balance shaped by prolonged over-extraction, triggering multiple secondary risks. The rebounding water level markedly exacerbates potential seismic liquefaction hazards at construction sites and raises risks of water seepage, anti-float failure, and structural damage for …
