Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report,
2025
Montana Tech Library
Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Epa Region 8 Optimized Ufp-Qapp Review Crosswalk,
2025
Environmental Protection Agency
Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024,
2025
Montana Tech Library
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan,
2025
Montana Tech Library
Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Characterizing Fish Communities Using Traditional And Emerging Monitoring Approaches In San Diego County Estuaries,
2025
University of San Diego
Characterizing Fish Communities Using Traditional And Emerging Monitoring Approaches In San Diego County Estuaries, Natalie Katherine De Wet
Theses
Fish communities are essential to estuarine health, playing key roles in food webs, nutrient cycling, and ecosystem functioning. However, the persistence of native fish populations is increasingly threatened by the cumulative impacts of coastal development, pollution, and climate change. Rapid, effective monitoring of species distributions is a priority, enabling timely conservation and management. However, the study of any ecosystem is limited by time, resources, and the consideration that research of a system can damage the ecosystem under study.
This research aimed to characterize fish species richness and evaluate the benefits and limitations of different estuary monitoring approaches. Specifically, this study …
Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report,
2025
Montana Resources
Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report,
2025
Montana Resources
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025),
2025
Environmental Protection Agency
Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2025 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan,
2025
Montana Resources
Re: 2025 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan, Mark Thompson, Loren Burmeister
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2025 (Dated June 30, 2025),
2025
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2025 (Dated June 30, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025),
2025
Environmental Protection Agency
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025),
2025
Environmental Protection Agency
Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp).,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap),
2025
Montana Tech Library
Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
New Precipitation Is Scarce In Deep Soils: Findings From 47 Forest Plots Spanning Switzerland,
2025
Chapman University
New Precipitation Is Scarce In Deep Soils: Findings From 47 Forest Plots Spanning Switzerland, Emily I. Burt, Scott T. Allen, Sabine Braun, Simon Tresch, James W. Kirchner, Gregory R. Goldsmith
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
As precipitation infiltrates into soils, it can recharge them, displace previously stored waters, or bypass already-filled pores. Using 3,697 δ2H and δ18O measurements of water collected nearly monthly over >3 years in 47 forest plots across Switzerland, we present a systematic investigation of the controls on mobile soil water transport. We quantified the lags and damping of water as it percolates downward using young water fraction analysis (Fyw), and the fractions of soil water composed by precipitation that fell within the previous month (new water fractions, Fnew). The Fnew of water sampled in surface soils ranged …
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025),
2025
Environmental Protection Agency
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
The Future Intensification Of Hydrological Extremes And Whiplashes In The Contiguous United States Increase Community Vulnerability,
2025
Chapman University
The Future Intensification Of Hydrological Extremes And Whiplashes In The Contiguous United States Increase Community Vulnerability, Surendra Maharjan, Wenzhao Li, John D. Bolten, Hesham El-Askary
Mathematics, Physics, and Computer Science Faculty Articles and Research
Hydroclimatic whiplash rapid shifts between drought and flood poses growing risks to U.S. communities. Here, we assess historical extremes and future projections using a normalized streamflow metric: the annual mean flow’s deviation from the 1981–2020 average, expressed as a fraction of that average. This metric is applied to United States Geological Survey records and Localized Constructed Analogs downscaled projections under Representative Concentration Pathways 4.5 and 8.5. Results reveal sharp regional disparities, with drought deficits exceeding 300% of normal flow during multi-year droughts. By linking hydrologic outcomes with the Federal Emergency Management Agency’s National Risk Index, we find that counties facing …