Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023),
2023
Environmental Protection Agency
Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023),
2023
Environmental Protection Agency
Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023),
2023
Environmental Protection Agency
Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Distribution And Habitat Associations Of The Georgia Satyr (Neonympha Areolatus) In Arkansas,
2023
Arkansas Tech University
Distribution And Habitat Associations Of The Georgia Satyr (Neonympha Areolatus) In Arkansas, Kristi Patterson
ATU Theses and Dissertations 2021 - Present
The Georgia satyr (Neonympha areolatus) is a small sedentary butterfly that is rare in Arkansas. Currently, the exact locations of this butterfly in Arkansas are unknown, along with the habitat characteristics associated with their presence. In order to determine these unknowns, I completed 104 surveys across seven different wildlife management areas in southern Arkansas. Pollard-Yates transects were conducted at each study site, and weather variables were recorded before each survey. Vegetation surveys were also completed at each site, and where each Georgia satyr was identified. Generalized linear models (GLM) were created to identify what parameters are important for …
Analyzing The Adoption, Cropping Rotation, And Impact Of Winter Cover Crops In The Mississippi Alluvial Plain (Map) Region Through Remote Sensing Technologies,
2023
University of Arkansas, Fayetteville
Analyzing The Adoption, Cropping Rotation, And Impact Of Winter Cover Crops In The Mississippi Alluvial Plain (Map) Region Through Remote Sensing Technologies, Zobaer Ahmed
Graduate Theses and Dissertations
This dissertation explores the application of remote sensing technologies in conservation agriculture, specifically focusing on identifying and mapping winter cover crops and assessing voluntary cover crop adoption and cropping patterns in the Arkansas portion of the Mississippi Alluvial Plain (MAP). In the first chapter, a systematic review using the PRISMA methodology examines the last 30 years of thematic research, development, and trends in remote sensing applied to conservation agriculture from a global perspective. The review uncovers a growing interest in remote sensing-based research in conservation agriculture and emphasizes the necessity for further studies dedicated to conservation practices. Among the 68 …
Integrating Sensor Development, Risk Assessment, And Community Engagement To Support Environmental Justice In The Rural Community Of El Tiple, Colombia,
2023
Clemson University
Integrating Sensor Development, Risk Assessment, And Community Engagement To Support Environmental Justice In The Rural Community Of El Tiple, Colombia, David Bahamon Pinzon
All Dissertations
In Colombia, ethnic communities have traditionally been responsible stewards of natural resources. They recognize the importance of these resources for their livelihood, as well as their ancestral and cultural heritage. El Tiple, a rural Afro-Colombian community, has been affected by the incursion of private corporations that promoted the expansion of sugarcane monocrops in their territory. Since the introduction of the monoculture industry, local freshwater sources have been depleted due to intensive water use for irrigation of the sugarcane crops. Additionally, the intensive usage of agrochemicals has been linked with loss of native flora, damages to family farms, and pollution of …
Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2022 To 30th April 2023,
2023
Department of Primary Industries and Regional Development, Western Australia
Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2022 To 30th April 2023, Department Of Primary Industries And Regional Development, Western Australia
Irrigated Agricultural Development in the North
The Weaber Plain Development Project (Goomig Project) was approved on 13 September 2011. The approval reference is EPBC 2010/5491 (the Approval).
The Goomig Project comprises irrigated farmland, associated infrastructure, and a buffer area on the Weaber Plain located about 30km north-northeast of Kununurra in Western Australia. Figure 1 shows the location and layout of the Goomig Project and interface with other projects including the Knox Creek Plain Irrigation Development (EPBC 2014/7143), Sorby Hills Silver Lead Zinc mining project, and Ord River Irrigation Area (ORIA) Stage 1 'Cave Springs' farms.
The Department of Primary Industries and Regional Development is the Goomig …
High-Energy Storm Events And Their Impacts On Carbon Storage In Tidal Wetlands Of South Carolina,
2023
Clemson University
High-Energy Storm Events And Their Impacts On Carbon Storage In Tidal Wetlands Of South Carolina, Gavin Gleasman
All Dissertations
Atmospheric carbon dioxide (CO2) concentrations have been increasing at an accelerating rate for the past two centuries, profoundly impacting global climate change. Atmospheric CO2 concentrations are influenced by the global carbon cycle through physical and biogeochemical pathways. Tidal wetland environments play a vital role in the global carbon cycle by offsetting atmospheric CO2 concentrations through their natural physiochemical processes of high autotrophic productivity, allochthonous organic matter deposition, anoxic soils, and continuous accretion which promotes carbon sequestration with long-term storage at the land-ocean margin. The Intergovernmental Panel on Climate Change (IPCC) and United States Global Change Research …
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Final Multi-Pathway Residential Metals Abatement Program Plan,
2023
Montana Tech Library
Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022),
2023
Environmental Protection Agency
Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church],
2023
Montana Tech Library
Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area,
2023
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Diurnal Variations Of Meteorological Elements To Fluctuation Of Air Quality Parameters,
2023
Faculty of Agriculture, Universitas Sriwijaya, Palembang 30139 Indonesia
Diurnal Variations Of Meteorological Elements To Fluctuation Of Air Quality Parameters, Wandayantolis Wandayantolis, Firda Amalia Maslakah, Sugeng Nugroho
Journal of Environmental Science and Sustainable Development
Many studies have shown the relationship between meteorological elements and air quality. However, some aspects of the relationship are unknown, particularly in Indonesia, which has a variety of topographical landscapes and climatic conditions. This study seeks to define the relationship between meteorological variables and the diurnal pattern of three pollutants that contributes to the so-called Indeks Standard Pencemar Udara (ISPU), similar to the Air Quality Index (AQI), in a remote area in Bukit Kototabang, West Sumatra, Indonesia. The three parameters, namely Particulate Matter 10 micrometers (PM10), carbon monoxide (CO), and tropospheric ozone (O3), were correlated with diurnal variations …
Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023),
2023
Environmental Protection Agency
Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022),
2023
Environmental Protection Agency
Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023),
2023
Environmental Protection Agency
Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
