Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023),
2023
Environmental Protection Agency
Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Insar Time Series Analysis To Evaluate Subsidence Risk Of Monumental Chandigarh City (India) And Surroundings,
2023
RSS-Hydro, Luxembourg
Insar Time Series Analysis To Evaluate Subsidence Risk Of Monumental Chandigarh City (India) And Surroundings, Jungrack Kim, Shih-Yuan Lin, Tejpal Singh, Ramesh P. Singh
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Groundwater depletion is one of the serious geo-environmental issues causing ground subsidence, which damage buildings, infrastructures and causes loss of life. The quantitative and qualitative evaluation of groundwater variability requires multiple approaches to measure hydraulic head level and geodetic deformation. In this study, we have made efforts to integrate multiple hierarchical space-borne data, including Gravity Recovery and Climate Experiment (GRACE), Sentinel-1 Interferometric Synthetic Aperture Radar (InSAR), geological and hydrological data, to quantify subsidence in Chandigarh city and its surroundings. First, we conducted New-Small BAseline Subsets (NSBAS) and pointwise persistent scatterer (PS) InSAR techniques in parallel, using three-years Sentinel-1 data showing …
Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023,
2023
Environmental Protection Agency
Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023, Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1,
2023
Montana Tech Library
Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02,
2023
Management Service Company, ARCO
Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Detection And Identification Of Pre-Seismic Thermal Anomalies In Cloudy Conditions Associated With The 2022 Luding (China) Mw 6.6 Earthquake,
2023
China Earthquake Administration
Detection And Identification Of Pre-Seismic Thermal Anomalies In Cloudy Conditions Associated With The 2022 Luding (China) Mw 6.6 Earthquake, Feng Jing, Meng Jiang, Lu Zhang, Ramesh P. Singh
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Over the past three decades, thermal anomalies from satellite infrared data have been widely discussed and associated with earthquakes. Besides infrared satellite data, the recent use of passive microwave satellite data has emerged as an important dataset to detect the potential thermal anomalies prior to earthquakes in all weather conditions due to its capability to monitor the earth in cloudy and foggy conditions and has been applied to the numerous strong earthquake events around the world. On 5 September 2022, an Mw 6.6 earthquake occurred in Luding county, nearby Mt. Gongga, China, with heavy cloud coverage over the epicenter and …
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
