Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment Commons™

Open Access. Powered by Scholars. Published by Universities.®

6,853 Full-Text Articles 9,146 Authors 2,476,838 Downloads 196 Institutions

All Articles in Environmental Indicators and Impact Assessment

Faceted Search

6,853 full-text articles. Page 65 of 276.

Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. 2024 Montana Tech Library

Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report Kennedy Elementary School Post- Remedial Action Surface Dust Sampling, Christopher Berg, Elsie King 2024 ERM

Residential Metals Abatement Program Investigation Summary Report Kennedy Elementary School Post- Remedial Action Surface Dust Sampling, Christopher Berg, Elsie King

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan, Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp) [Dated January 25, 2024], Molly Roby 2024 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan, Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp) [Dated January 25, 2024], Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Screening Life Cycle Analysis Of One-Way And Reusable Crate Designs – Estimating Environmental Impacts Via Lca Software, Nicolas R. Corona 2024 California Polytechnic State University

A Screening Life Cycle Analysis Of One-Way And Reusable Crate Designs – Estimating Environmental Impacts Via Lca Software, Nicolas R. Corona

Master's Theses

A comparison analysis conducted via COMPASS life cycle analysis software has indicated that a one-way crate design, rather than a reusable crate design, is in fact the more environmentally friendly packaging system. These results can be interpreted differently, however, as the manufacturer of said crate designs must confirm what impact indicators they would like to reference as environmental goalposts. The conducted analysis provides insight into what the environmental impacts of each packaging system look like as packaging at all three system levels has been identified as a means of reducing environmental impacts globally. As such, the manufacturer of said crate …


Assessing The Efficacy Of Hydraulic Pumping As A Remediation Method Of A Subsurface Light Non-Aqueous Phase Liquid Spill In Arroyo Grande, California, James M. Raney 2024 California Polytechnic State University, San Luis Obispo

Assessing The Efficacy Of Hydraulic Pumping As A Remediation Method Of A Subsurface Light Non-Aqueous Phase Liquid Spill In Arroyo Grande, California, James M. Raney

Master of Science in Environmental Sciences and Management Projects

The efficacy of hydraulic pumping as a remediation method of a petroleum, or Light Non-Aqueous Phase Liquid (LNAPL) spill in Arroyo Grande, California will be assessed by determining aquifer properties, assessing the chemical properties of the contaminant, recovering the contaminant from the subsurface, and proposing alternative remediation techniques. Soil, groundwater and contaminant characteristics, cumulative volume of LNAPL skimming test data, pumping rates, and LNAPL thicknesses in wells installed within the contaminant plume were collected. Sediments around the LNAPL source are contaminated with hydrocarbons in the gas and diesel range. Pumping efficacy is expected to continue to decrease at the site, …


Herbicides, Department of Primary Industries and Regional Development, Western Australia 2024 Department of Primary Industries and Regional Development, Western Australia

Herbicides, Department Of Primary Industries And Regional Development, Western Australia

Grains and other field crops factsheets

Herbicides play a vital role in integrated weed management programs. Knowledge of the mechanisms and activity of herbicides will improve the impact and sustainability of herbicides as a weed management tactic. This fact sheet is a guide to the types of herbicides available and when and how they should be used.


Berkeley Pit And Discharge Pilot Project Discharge System Operations Assurance Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc., WSP Environment & Infrastructure, Inc. 2024 Montana Tech Library

Berkeley Pit And Discharge Pilot Project Discharge System Operations Assurance Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc., Wsp Environment & Infrastructure, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc. 2024 Montana Tech Library

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit And Discharge Pilot Project Downstream Field Sampling Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc. 2024 Montana Tech Library

Berkeley Pit And Discharge Pilot Project Downstream Field Sampling Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. 2024 Montana Tech Library

Draft Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Remediating History: A Review Of Restoration For Creeks Polluted From Historical Mining Sites, With The Red Boy Mine As A Primary Case Study, Kara Atiyeh 2024 Portland State University

Remediating History: A Review Of Restoration For Creeks Polluted From Historical Mining Sites, With The Red Boy Mine As A Primary Case Study, Kara Atiyeh

University Honors Theses

I conducted a literature review to examine the key aspects of restoring watersheds affected by pollution from historical mining. This review is then applied to a case study discussion of the Red Boy Mine and Clear Creek remediation project in Granite, Oregon. The goal of this discussion is to explore how an analysis of site conditions along with current literature on management practices can help guide these projects. Thousands of abandoned hard rock mines remain throughout the country, and many pose serious environmental health effects. Heavy metals like cadmium, nickel, and copper are brought to the surface from mining activity, …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Borrow Amendment Submittal #1 (Dated May 9, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Borrow Amendment Submittal #1 (Dated May 9, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Final Request For Change (Rfc-Rmap-2024-001), Mike McAnulty 2024 Atlantic Richfield Company

Re: Final Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design (Dated March 22, 2024), Emma Rott 2024 Environmental Protection Agency

Re: Conditional Approval Letter Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design (Dated March 22, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson 2024 Management Service Company, ARCO

Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress