Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2023 To 30th April 2024,
2024
Department of Primary Industries and Regional Development, Western Australia
Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2023 To 30th April 2024, Department Of Primary Industries And Regional Development, Western Australia
Irrigated Agricultural Development in the North
The Weaber Plain Development Project (Goomig Project) was approved on 13 September 2011. The approval reference is EPBC 2010/5491 (the Approval).
The Goomig Project comprises irrigated farmland, associated infrastructure, and a buffer area on the Weaber Plain located about 30km north-northeast of Kununurra in Western Australia. Figure 1 shows the location and layout of the Goomig Project and interface with other projects including the Knox Creek Plain Irrigation Development (EPBC 2014/7143), Sorby Hills Silver Lead Zinc mining project, and Ord River Irrigation Area (ORIA) Stage 1 'Cave Springs' farms.
The Department of Primary Industries and Regional Development is the Goomig …
May 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report,
2024
Montana Resources
May 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update,
2024
Montana Resources
Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments For The 2024 Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Quality Assurance Project Plan (Qapp) For Non-Residential Parcels And Residential Daycares (Dated May 23, 2024),
2024
Environmental Protection Agency
Comments For The 2024 Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Quality Assurance Project Plan (Qapp) For Non-Residential Parcels And Residential Daycares (Dated May 23, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment/Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) For Bres No. 121 – Travona Dump, Bres No. 125 – Child Harold-2 Dump, Bres No. 34e – Eveline Dump East, Bres No. 45 – Garfield, Bres No. 49 – Old Glory, Bres No. 52 – Moscow, Bres No. 74 – West Gagnon Dump, And Bres No. 78 Original Mine (Dated May 7, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Mandan Park Soil Rawp (Dated May 10, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Mandan Park Soil Rawp (Dated May 10, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #14 [Silver Bow Homes Park, Butte Koa, Fairmont Rv Park, And Cccs Gymnasium] (Dated May 10, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #14 [Silver Bow Homes Park, Butte Koa, Fairmont Rv Park, And Cccs Gymnasium] (Dated May 10, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #13 [Copper Mountain Park] (Dated May 10, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #13 [Copper Mountain Park] (Dated May 10, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023 (Dated March 28, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023 (Dated March 28, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval For The Response To Comments Letter (Dated May 21, 2024) For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans (Caps) For Reclaimed Sites (Dated January 31, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - May 2024 Monthly Discharge Monitoring Report,
2024
Montana Resources
Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - May 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Assessment And Prediction Of Meteorological Drought Using Machine Learning Algorithms And Climate Data,
2024
Abdelmalek Essaâdi University
Assessment And Prediction Of Meteorological Drought Using Machine Learning Algorithms And Climate Data, Khalid En-Nagre, Mourad Aqnouy, Ayoub Ouarka, Syed Ali Asad Naqvi, Ismail Bouizrou, Jamal Eddine Stitou El Messari, Aqil Tariq, Walid Soufan, Wenzhao Li, Hesham El-Askary
Mathematics, Physics, and Computer Science Faculty Articles and Research
Monitoring drought in semi-arid regions due to climate change is of paramount importance. This study, conducted in Morocco’s Upper Drâa Basin (UDB), analyzed data spanning from 1980 to 2019, focusing on the calculation of drought indices, specifically the Standardized Precipitation Index (SPI) and the Standardized Precipitation Evapotranspiration Index (SPEI) at multiple timescales (1, 3, 9, 12 months). Trends were assessed using statistical methods such as the Mann-Kendall test and the Sen’s Slope estimator. Four significant machine learning (ML) algorithms, including Random Forest, Voting Regressor, AdaBoost Regressor, and K-Nearest Neighbors Regressor, were evaluated to predict the SPEI values for both three …
Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels),
2024
Montana Tech Library
Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Establishment Of A Research Site At The Kennedy Mountain Campus For The Observation Of Airborne Particulate Matter,
2024
University of Denver
Establishment Of A Research Site At The Kennedy Mountain Campus For The Observation Of Airborne Particulate Matter, Alyssa Knaus
Undergraduate Theses, Capstones, and Recitals
This thesis explored particulate matter (PM) concentrations at two sites within the Colorado Front Range. The study utilized two models of PurpleAir PM sensors, Flex and SD-II, to provide real-time, accessible data on PM1, PM2.5, and PM10 mass concentrations with the goal of establishing the first research site at the Kennedy Mountain Campus (KMC). The first of the two sites used during this study was at a suburban location outside of Denver, CO. This period was used as an instrument intercomparison period in order to conduct instrument analysis. The initial findings from this period found significant correlations between PM concentration …
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp),
2024
Montana Tech Library
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023),
2024
Environmental Protection Agency
Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024),
2024
Environmental Protection Agency
Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Heavy Metals Implications To Sediment Microbiome And Coral Response To Arsenic Dosing,
2024
Nova Southeastern University
Heavy Metals Implications To Sediment Microbiome And Coral Response To Arsenic Dosing, Dimitrios G. Giarikos, Amy Hirons, Jose V. Lopez, Abigail Renegar, Jason Gershman
SECLER Data
No abstract provided.