Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment Commons™

Open Access. Powered by Scholars. Published by Universities.®

6,853 Full-Text Articles 9,146 Authors 2,476,838 Downloads 196 Institutions

All Articles in Environmental Indicators and Impact Assessment

Faceted Search

6,853 full-text articles. Page 64 of 276.

Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2023 To 30th April 2024, Department of Primary Industries and Regional Development, Western Australia 2024 Department of Primary Industries and Regional Development, Western Australia

Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2023 To 30th April 2024, Department Of Primary Industries And Regional Development, Western Australia

Irrigated Agricultural Development in the North

The Weaber Plain Development Project (Goomig Project) was approved on 13 September 2011. The approval reference is EPBC 2010/5491 (the Approval).

The Goomig Project comprises irrigated farmland, associated infrastructure, and a buffer area on the Weaber Plain located about 30km north-northeast of Kununurra in Western Australia. Figure 1 shows the location and layout of the Goomig Project and interface with other projects including the Knox Creek Plain Irrigation Development (EPBC 2014/7143), Sorby Hills Silver Lead Zinc mining project, and Ord River Irrigation Area (ORIA) Stage 1 'Cave Springs' farms.

The Department of Primary Industries and Regional Development is the Goomig …


May 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister 2024 Montana Resources

May 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Mark Thompson, Dave Griffis 2024 Montana Resources

Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The 2024 Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Quality Assurance Project Plan (Qapp) For Non-Residential Parcels And Residential Daycares (Dated May 23, 2024), Molly Roby 2024 Environmental Protection Agency

Comments For The 2024 Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Quality Assurance Project Plan (Qapp) For Non-Residential Parcels And Residential Daycares (Dated May 23, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment/Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) For Bres No. 121 – Travona Dump, Bres No. 125 – Child Harold-2 Dump, Bres No. 34e – Eveline Dump East, Bres No. 45 – Garfield, Bres No. 49 – Old Glory, Bres No. 52 – Moscow, Bres No. 74 – West Gagnon Dump, And Bres No. 78 Original Mine (Dated May 7, 2024), Molly Roby 2024 Environmental Protection Agency

Comment/Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) For Bres No. 121 – Travona Dump, Bres No. 125 – Child Harold-2 Dump, Bres No. 34e – Eveline Dump East, Bres No. 45 – Garfield, Bres No. 49 – Old Glory, Bres No. 52 – Moscow, Bres No. 74 – West Gagnon Dump, And Bres No. 78 Original Mine (Dated May 7, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Mandan Park Soil Rawp (Dated May 10, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Mandan Park Soil Rawp (Dated May 10, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #14 [Silver Bow Homes Park, Butte Koa, Fairmont Rv Park, And Cccs Gymnasium] (Dated May 10, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #14 [Silver Bow Homes Park, Butte Koa, Fairmont Rv Park, And Cccs Gymnasium] (Dated May 10, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #13 [Copper Mountain Park] (Dated May 10, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #13 [Copper Mountain Park] (Dated May 10, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023 (Dated March 28, 2024), Emma Rott 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023 (Dated March 28, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval For The Response To Comments Letter (Dated May 21, 2024) For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans (Caps) For Reclaimed Sites (Dated January 31, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval For The Response To Comments Letter (Dated May 21, 2024) For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans (Caps) For Reclaimed Sites (Dated January 31, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - May 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis 2024 Montana Resources

Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - May 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Assessment And Prediction Of Meteorological Drought Using Machine Learning Algorithms And Climate Data, Khalid En-Nagre, Mourad Aqnouy, Ayoub Ouarka, Syed Ali Asad Naqvi, Ismail Bouizrou, Jamal Eddine Stitou El Messari, Aqil Tariq, Walid Soufan, Wenzhao Li, Hesham el-Askary 2024 Abdelmalek Essaâdi University

Assessment And Prediction Of Meteorological Drought Using Machine Learning Algorithms And Climate Data, Khalid En-Nagre, Mourad Aqnouy, Ayoub Ouarka, Syed Ali Asad Naqvi, Ismail Bouizrou, Jamal Eddine Stitou El Messari, Aqil Tariq, Walid Soufan, Wenzhao Li, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Monitoring drought in semi-arid regions due to climate change is of paramount importance. This study, conducted in Morocco’s Upper Drâa Basin (UDB), analyzed data spanning from 1980 to 2019, focusing on the calculation of drought indices, specifically the Standardized Precipitation Index (SPI) and the Standardized Precipitation Evapotranspiration Index (SPEI) at multiple timescales (1, 3, 9, 12 months). Trends were assessed using statistical methods such as the Mann-Kendall test and the Sen’s Slope estimator. Four significant machine learning (ML) algorithms, including Random Forest, Voting Regressor, AdaBoost Regressor, and K-Nearest Neighbors Regressor, were evaluated to predict the SPEI values for both three …


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump, Mike McAnulty 2024 Atlantic Richfield Company

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. 2024 Montana Tech Library

Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Establishment Of A Research Site At The Kennedy Mountain Campus For The Observation Of Airborne Particulate Matter, Alyssa Knaus 2024 University of Denver

Establishment Of A Research Site At The Kennedy Mountain Campus For The Observation Of Airborne Particulate Matter, Alyssa Knaus

Undergraduate Theses, Capstones, and Recitals

This thesis explored particulate matter (PM) concentrations at two sites within the Colorado Front Range. The study utilized two models of PurpleAir PM sensors, Flex and SD-II, to provide real-time, accessible data on PM1, PM2.5, and PM10 mass concentrations with the goal of establishing the first research site at the Kennedy Mountain Campus (KMC). The first of the two sites used during this study was at a suburban location outside of Denver, CO. This period was used as an instrument intercomparison period in order to conduct instrument analysis. The initial findings from this period found significant correlations between PM concentration …


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. 2024 Montana Tech Library

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023), Emma Rott 2024 Environmental Protection Agency

Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024), Emma Rott 2024 Environmental Protection Agency

Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Heavy Metals Implications To Sediment Microbiome And Coral Response To Arsenic Dosing, Dimitrios G. Giarikos, Amy Hirons, Jose V. Lopez, Abigail Renegar, Jason Gershman 2024 Nova Southeastern University

Heavy Metals Implications To Sediment Microbiome And Coral Response To Arsenic Dosing, Dimitrios G. Giarikos, Amy Hirons, Jose V. Lopez, Abigail Renegar, Jason Gershman

SECLER Data

No abstract provided.


Digital Commons powered by bepress