Long-Term Analysis Of Pm2.5 Elemental Composition And Source Contributions In Coastal Urban Environments Of Corpus Christi And Houston In Texas,
2026
The University of Texas Rio Grande Valley
Long-Term Analysis Of Pm2.5 Elemental Composition And Source Contributions In Coastal Urban Environments Of Corpus Christi And Houston In Texas, Sai Deepak Pinakana, Jeremy A. Sarnat, Amit U. Raysoni
School of Earth, Environmental, & Marine Sciences Faculty Publications
Long-term assessments of fine particulate matter play a key role in identifying persistent and emerging emission contributors. Coastal urban areas are highly susceptible to transboundary dust and wildfire events in addition to local pollution sources. Multi-decadal assessments in these regions using chemical speciation data could offer insights into major pollutant sources and their trends. This study utilizes nearly two decades of PM2.5 elemental composition data at two major coastal cities in Texas: Houston and Corpus Christi. Fourteen trace elements were analyzed to characterize the seasonal variability and long-term source evolution using a combination of Spearman’s correlation analysis, principal component analysis, …
A Critical Review Of Pharmaceutical Pollutants In Soil And Air: Ecotoxicological Impacts On Animal, Plant And Microbial Communities - Health Hazards And Waste Management,
2026
The University of Texas Rio Grande Valley
A Critical Review Of Pharmaceutical Pollutants In Soil And Air: Ecotoxicological Impacts On Animal, Plant And Microbial Communities - Health Hazards And Waste Management, Md Faisal Amin, Md. Saydur Rahman
School of Integrative Biological & Chemical Sciences Faculty Publications
Pharmaceutical contamination in soil and air has become a critical environmental concern due to its widespread sources, complex behavior, and long-lasting ecological impacts. This review comprehensively explores the presence, fate, and effects of pharmaceutical compounds in soil, highlighting their entry routes, environmental persistence, and biological consequences. Pharmaceuticals infiltrate terrestrial and aquatic environments through various pathways, including agricultural application, pharmaceutical manufacturing waste, sewage sludge, hospital and household discharges, irrigation with contaminated water, and atmospheric deposition. A wide range of drug classes, such as antibiotics, analgesics, non-steroidal anti-inflammatory drugs, antidepressants, anticancer drugs, and hormones, have been identified in both soil and air …
Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan,
2026
Montana Tech Library
Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Subject: Operations And Maintenance Report Grove Gulch Sedimentation Bay - Post-Storm 10.26.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2026
Management Service Company, ARCO
Subject: Operations And Maintenance Report Grove Gulch Sedimentation Bay - Post-Storm 10.26.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report,
2026
Montana Tech Library
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Summit County, Utah: Changes To Climate, Snowpack, And Wildfire (1979-2025),
2026
Utah State University
Summit County, Utah: Changes To Climate, Snowpack, And Wildfire (1979-2025), Scott Hotaling, Gordon O. Gianniny, Joseph D. Birch, Elizabeth Cohen, Kendall Becker
All Current Publications
Summit County is climatically unique from the rest of Utah due to its high mean elevation. It’s also economically unique, with world-class ski resorts near working agricultural lands. In this fact sheet, we synthesize how Summit County’s environment is changing, with an emphasis on the last 50 years. We focus on changes in temperature, precipitation, and snowpack; growing season length; and wildfire because of their impacts on the economy, natural resources, and local communities' well-being. Our goal is to support the region's future planning efforts. To that end, we highlight risks to Summit County’s future and opportunities that may arise …
Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026,
2026
Montana Tech Library
Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comparing Knowledge-Driven And Data-Driven Machine Learning Frameworks For Coastal Vulnerability Assessment On The Egyptian North Coast,
2026
University of Szeged
Comparing Knowledge-Driven And Data-Driven Machine Learning Frameworks For Coastal Vulnerability Assessment On The Egyptian North Coast, Ali Elgendy, Hesham Morgan, Hesham El-Askary, László Mucsi
Mathematics, Physics, and Computer Science Faculty Articles and Research
Coastal erosion worsened by climate change and human activities is a major threat to global shorelines. As sea levels rise and storms intensify, this rapid shoreline retreat endangers critical infrastructure and the economic security of coastal populations worldwide. However, traditional knowledge-driven frameworks for assessing these threats often rely on subjective, static rules that fail to capture complex, non-linear environmental interactions. To address this critical gap and demonstrate the value of advanced methods, this study compared the traditional Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) model against machine learning algorithms, highlighting the potential for more accurate coastal erosion risk assessment. …
Re: Request For Change To The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2026 Update),
2026
Management Service Company, ARCO
Re: Request For Change To The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2026 Update), Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Operations And Maintenance Report Grove Gulch Sedimentation Bay - Post-Storm 10.13.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2026
Management Service Company, ARCO
Operations And Maintenance Report Grove Gulch Sedimentation Bay - Post-Storm 10.13.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report,
2026
Montana Tech Library
Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated July 31, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated July 31, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr),
2026
Environmental Protection Agency
Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr),
2026
Montana Tech Library
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Hydraulic Capacity Improvements Interim Operations And Water Management Plan (Dated September 18, 2026),
2026
Environmental Protection Agency
Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Hydraulic Capacity Improvements Interim Operations And Water Management Plan (Dated September 18, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
