Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection Commons™

Open Access. Powered by Scholars. Published by Universities.®

7,902 Full-Text Articles 8,866 Authors 5,448,423 Downloads 222 Institutions

All Articles in Environmental Health and Protection

Faceted Search

7,902 full-text articles. Page 77 of 213.

Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. 2023 Montana Tech Library

Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene 2023 Environmental Protection Agency

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Trace Metal Analysis Of Pond Sediments To Measure Deposition From A Coal-Fired Power Plant In Ackerman Mississippi, Charles Bills 2023 Mississippi State University

Trace Metal Analysis Of Pond Sediments To Measure Deposition From A Coal-Fired Power Plant In Ackerman Mississippi, Charles Bills

Theses and Dissertations

Trace element sediment pollution due to coal power plants have been reported in many countries. In this study, pond sediment samples collected from locations around a coal fired power plant in Ackerman, MS, were evaluated for their trace element concentration and pollution status. The samples were collected at two depths to study changes in element accumulation over time. The samples were digested and the elements, As, Cd, Cr, Cu, Pb, Hg, and Zn were analyzed using ICP-MS. Results were then compared to known background concentrations as well as sediment quality guidelines and pollution thresholds. The sample locations downwind of the …


Investigating The Impact On Private Water Supply Of Hydraulic Fracturing Communication With An Abandoned Conventional Gas Well In New Freeport, Pa, Kiley Miller 2023 Duquesne University

Investigating The Impact On Private Water Supply Of Hydraulic Fracturing Communication With An Abandoned Conventional Gas Well In New Freeport, Pa, Kiley Miller

Electronic Theses and Dissertations

In June of 2022 a “frac out” occurred in New Freeport, PA when an unconventional gas well under development by hydraulic fracturing, communicated with an abandoned gas well to the surface. An initial “zone of impact” encompassed much of the town’s main thoroughfare. Water samples were obtained from 17 private water wells, 5 springs and 1 pond (31 total samples) and analyzed for cations, anions, and light hydrocarbons. Methane was found in 18 of the samples, both located within and outside of the “zone of impact”. Mass ratio analyses indicated contamination from both unconventional and conventional wells. Interferometric Synthetic Aperture …


2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc. 2023 Montana Tech Library

2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc. 2023 Montana Tech Library

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene 2023 Environmental Protection Agency

Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene 2023 Environmental Protection Agency

Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc. 2023 Montana Tech Library

Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene 2023 Environmental Protection Agency

Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene 2023 Environmental Protection Agency

Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene 2023 Environmental Protection Agency

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene 2023 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene 2023 Environmental Protection Agency

Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene 2023 Environmental Protection Agency

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Distribution And Habitat Associations Of The Georgia Satyr (Neonympha Areolatus) In Arkansas, Kristi Patterson 2023 Arkansas Tech University

Distribution And Habitat Associations Of The Georgia Satyr (Neonympha Areolatus) In Arkansas, Kristi Patterson

ATU Theses and Dissertations 2021 - Present

The Georgia satyr (Neonympha areolatus) is a small sedentary butterfly that is rare in Arkansas. Currently, the exact locations of this butterfly in Arkansas are unknown, along with the habitat characteristics associated with their presence. In order to determine these unknowns, I completed 104 surveys across seven different wildlife management areas in southern Arkansas. Pollard-Yates transects were conducted at each study site, and weather variables were recorded before each survey. Vegetation surveys were also completed at each site, and where each Georgia satyr was identified. Generalized linear models (GLM) were created to identify what parameters are important for …


Digital Commons powered by bepress