Approval For: Discharge System 2022 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 26, 2023,
2023
Environmental Protection Agency
Approval For: Discharge System 2022 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 26, 2023, Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2023-03,
2023
Management Service Company, ARCO
Final Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2023-03, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 43 – Area Near Missoula Gulch Ballfield,
2023
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 43 – Area Near Missoula Gulch Ballfield, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023,
2023
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023,
2023
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground,
2023
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For Draft Bpsou Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan And Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan (Dated August 31, 2023),
2023
Montana Tech Library
Comment Letter For Draft Bpsou Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan And Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan (Dated August 31, 2023), Atlantic Richfield Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Self-Reported Consumption Of Bottled Water V. Tap Water In Appalachian And Non-Appalachian Kentucky,
2023
Eastern Kentucky University
Self-Reported Consumption Of Bottled Water V. Tap Water In Appalachian And Non-Appalachian Kentucky, Jason W. Marion
Journal of Appalachian Health
Introduction: Quantitative studies on drinking water perceptions in Appalachia are limited. High-profile water infrastructure failures in the U.S. and Eastern Kentucky, coupled with human-made and natural disasters in the Appalachian Region, have likely impacted opinions regarding tap water.
Purpose: To use existing unexplored data to describe baseline tap water v. bottled water consumption in Kentucky.
Methods: Telephone-based cross-sectional data were obtained from the 2013 Kentucky Health Issues Poll (KHIP) directed by the Foundation for a Healthy Kentucky. Among many items in KHIP, self-reported consumption of bottled water over tap water, reasons for bottled water use, and demographic data were obtained. …
Butte Priority Soils Operable Unit (Bpsou) Unreclaimed And Insufficiently Reclaimed Sites Request For Change 2023-01,
2023
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Unreclaimed And Insufficiently Reclaimed Sites Request For Change 2023-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Usa: Wolf Connection And Inclusive, Safe Spaces For All,
2023
Chapman University
Usa: Wolf Connection And Inclusive, Safe Spaces For All, Patrick Fuery, Kelli Fuery
CCI Books and Book Chapters
"Wolf Connection is a wolf sanctuary located on the outskirts of a rural town, Acton, California, nestled in the Angeles National Forest. The sanctuary consists of 165 acres of stunning woodland and high desert mountains, including a year-round stream. It is located within a one-hour drive from Los Angeles. Wolf Connection runs a series of programmes based around issues of mental health, addressing social and economic inequality, and providing strategies for resilience and well-being. Wolf Connection identifies the following as its core business activities: Providing Animal Rescue and Wildlife Preservation; At-Risk Youth Education and Empowerment; Community Empowerment; and Environmental Awareness …
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur-43 – Area Near Missoula Gulch Ball Field (Dated August 18, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur-43 – Area Near Missoula Gulch Ball Field (Dated August 18, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur-42 – Area Near Walkerville Playground (Dated August 18, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur-42 – Area Near Walkerville Playground (Dated August 18, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She,
2023
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She,
2023
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Of The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Aware Early Head Start – Revision 1 (May 19, 2023),
2023
Environmental Protection Agency
Approval Of The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Aware Early Head Start – Revision 1 (May 19, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She,
2023
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Silver Bow Creek Butte Area Npl Site 2 Nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She,
2023
Management Service Company, ARCO
Re: Silver Bow Creek Butte Area Npl Site 2 Nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree - Civil Action No. Cv 89-039-Bu-She,
2023
Management Service Company, ARCO
Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree - Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Kennedy Elementary (July 5, 2023),
2023
Environmental Protection Agency
Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Kennedy Elementary (July 5, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites – Field Sampling Plan (Fsp) Butte Remediation Evaluation System (Bres) No. 31 Waste Dump #5,
2023
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites – Field Sampling Plan (Fsp) Butte Remediation Evaluation System (Bres) No. 31 Waste Dump #5, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.