Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024,
2025
Montana Tech Library
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan,
2025
Montana Tech Library
Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Characterizing Fish Communities Using Traditional And Emerging Monitoring Approaches In San Diego County Estuaries,
2025
University of San Diego
Characterizing Fish Communities Using Traditional And Emerging Monitoring Approaches In San Diego County Estuaries, Natalie Katherine De Wet
Theses
Fish communities are essential to estuarine health, playing key roles in food webs, nutrient cycling, and ecosystem functioning. However, the persistence of native fish populations is increasingly threatened by the cumulative impacts of coastal development, pollution, and climate change. Rapid, effective monitoring of species distributions is a priority, enabling timely conservation and management. However, the study of any ecosystem is limited by time, resources, and the consideration that research of a system can damage the ecosystem under study.
This research aimed to characterize fish species richness and evaluate the benefits and limitations of different estuary monitoring approaches. Specifically, this study …
Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report,
2025
Montana Resources
Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report,
2025
Montana Resources
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025),
2025
Environmental Protection Agency
Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2025 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan,
2025
Montana Resources
Re: 2025 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan, Mark Thompson, Loren Burmeister
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
A Technical And Statistical Analysis Of Unleaded Aviation Fuel (Ul94) Adoption In A High- Volume Collegiate Aviation Environment,
2025
University of North Dakota
A Technical And Statistical Analysis Of Unleaded Aviation Fuel (Ul94) Adoption In A High- Volume Collegiate Aviation Environment, Nicholas D. Wilson, Ryan Guthridge, Brandon Wild, Jeremy Roesler, Daniel Kasowski, Nick Geinert, Aaron Terbest, Aaron Fettig, Robert Kraus
Journal of Aviation Technology and Engineering
The University of North Dakota (UND) adopted unleaded aviation fuel (UL94) for approximately a four-month period in the summer and early fall of 2023. The UL94 fuel was used in all reciprocating engine fleets based at the university’s primary training airport, Grand Forks International Airport in North Dakota. During the operational implementation of UL94, the UND flew 46,600 flight hours, consuming 386,778 gallons of fuel across all fleets powered by Lycoming engines. After approximately two months of using UL94, operational reports and maintenance inspections began to indicate potential for exhaust valve seat recession (EVSR), although early indications were limited in …
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2025 (Dated June 30, 2025),
2025
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2025 (Dated June 30, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025),
2025
Environmental Protection Agency
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025),
2025
Environmental Protection Agency
Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp).,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap),
2025
Montana Tech Library
Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025),
2025
Environmental Protection Agency
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2025
Management Service Company, ARCO
Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications,
2025
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2025
Management Service Company, ARCO
Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.