Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection Commons

Open Access. Powered by Scholars. Published by Universities.®

7,791 Full-Text Articles 8,811 Authors 5,301,903 Downloads 220 Institutions

All Articles in Environmental Health and Protection

Faceted Search

7,791 full-text articles. Page 22 of 207.

Reeds Run Amok: A Practical Guide To Managing Phragmites-Invaded Wetlands, Christine Rohal, Keith Hambrecht, Chad Cranney, Karin M. Kettenring 2025 Utah State University

Reeds Run Amok: A Practical Guide To Managing Phragmites-Invaded Wetlands, Christine Rohal, Keith Hambrecht, Chad Cranney, Karin M. Kettenring

All Current Publications

Phragmites australis (common reed or simply “phragmites”) is a tall-statured, highly productive wetland grass. It spreads rapidly, often displacing native plants and degrading critical habitat for shorebirds and waterfowl by reducing the availability of nesting, loafing, and foraging areas. Phragmites also consumes large amounts of water, adding pressure to already scarce water resources. Additionally, the accumulation of standing dead biomass can be a fire hazard. Phragmites makes large areas of wetlands inaccessible to both wildlife and humans. This guide provides guidance on managing phragmites.


Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson 2025 Management Service Company, ARCO

Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson 2025 Management Service Company, ARCO

Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated July 31, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated July 31, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson 2025 Management Service Company, ARCO

Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson 2025 Management Service Company, ARCO

Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 181 – Mountain Con-3 Dump., Mike McAnulty 2025 Atlantic Richfield Company

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 181 – Mountain Con-3 Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Geographic Disparities In Birth Outcomes: County-Level Investigation On Pm2.5 And Low Birth Weight In The United States, Eunice Y. Park, Ranju Mainali 2025 Montclair State University

Geographic Disparities In Birth Outcomes: County-Level Investigation On Pm2.5 And Low Birth Weight In The United States, Eunice Y. Park, Ranju Mainali

Department of Public Health Scholarship and Creative Works

Exposure to air pollution adversely affects health and is highly associated with birth outcomes. This study analyzes the relationship between air pollution and low birth weight (LBW; less than 2,500 g at birth) at the county level in the United States. Using the latest publicly available data from the County Health Rankings and Roadmaps across 3,027 counties and equivalents, simple and quantile regression analyses were conducted to test the association between the average daily density of fine particulate matter (PM2.5) and LBW. The LBW data were from 2016 to 2022 from the National Center for Health Statistics and PM2.5 data …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump (Dated August 21, 2025), Molly Roby 2025 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Settling Defendants Bmfou Annual Report Consent Decree For The Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc Remedial Action – Implementation Of The Remedy Horseshoe Bend Water Treatment Plant 2024 Annual Report, Mark Thompson, Dave Griffis 2025 Montana Resources

Settling Defendants Bmfou Annual Report Consent Decree For The Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc Remedial Action – Implementation Of The Remedy Horseshoe Bend Water Treatment Plant 2024 Annual Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike McAnulty 2025 Atlantic Richfield Company

Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 18 – Walkerville Ballfield (Dated August 13, 2025), Molly Roby 2025 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 18 – Walkerville Ballfield (Dated August 13, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 100 – Capri Motel-Arctic Dump (Dated August 12, 2025), Molly Roby 2025 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 100 – Capri Motel-Arctic Dump (Dated August 12, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites New And Mahoney (Ur-23) Construction Completion Report., Molly Roby 2025 Environmental Protection Agency

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites New And Mahoney (Ur-23) Construction Completion Report., Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike McAnulty 2025 Atlantic Richfield Company

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 120 – Bonanza Dump (Dated August 12, 2025), Molly Roby 2025 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 120 – Bonanza Dump (Dated August 12, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran 2025 Montana Tech Library

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott 2025 Environmental Protection Agency

Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress