Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 571 - 600 of 7480

Full-Text Articles in Environmental Monitoring

Near Real-Time Monitoring Reveals Extensive Recent Forest Disturbance In Ghana’S Protected Areas, Luofan Dong, Xiaojing Tang, Foster Mensah, Bashara Ahmed Abubakari, Kelsee H. Bratley, Pontus Olofsson, Curtis E. Woodcock Sep 2025

Near Real-Time Monitoring Reveals Extensive Recent Forest Disturbance In Ghana’S Protected Areas, Luofan Dong, Xiaojing Tang, Foster Mensah, Bashara Ahmed Abubakari, Kelsee H. Bratley, Pontus Olofsson, Curtis E. Woodcock

Faculty Scholarship

The Protected Areas (PAs) in Ghana play a critical role in preserving the abundant biodiversity of the West Africa Green Belt. But recent changes in policies and regulations have facilitated logging and mining activities, which have accelerated forest disturbances. While there is a consensus that PAs are undergoing destructive change, the extent, rate, and locations of forest disturbances are undocumented. In this study, we applied the fusion near real-time (FNRT) algorithm that utilizes Landsat, Sentinel-1, and Sentinel-2 data and sampling to monitor forests in the PAs of Ghana. The results reveal that 704.74 (±177.24) km2 of forest in the PAs …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling (Fsp): Bres No.177 - North Alice Culvert (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling (Fsp): Bres No.177 - North Alice Culvert (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Uniform Federal Policy- Quality Assurance Project Plan, Hydrogeologic, Inc. Sep 2025

Revised Final Uniform Federal Policy- Quality Assurance Project Plan, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments (Dated August 14, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments (Dated August 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Pilot Project 2025 Annual Update, Mark Thompson, Loren Burmeister Sep 2025

Re: Pilot Project 2025 Annual Update, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Uniform Federal Policyquality Assurance Project Plan, Hydrogeologic, Inc. Sep 2025

Revised Final Uniform Federal Policyquality Assurance Project Plan, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated June 24, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated June 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Sites Field Sampling (Fsp) (Dated August 14, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Sites Field Sampling (Fsp) (Dated August 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp) (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp) (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Epa Comments Dated September 16, 2025 For The Blacktail Creek Riparian Actions Uniform Federal Policy - Quality Assurance Project Plan Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Environmental Protection Agency Sep 2025

Response To Epa Comments Dated September 16, 2025 For The Blacktail Creek Riparian Actions Uniform Federal Policy - Quality Assurance Project Plan Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit And Discharge Pilot Project Quarterly Pilot Project Report Second Quarter 2025, Atlantic Richfield Company, Montana Resources, Llc Sep 2025

Berkeley Pit And Discharge Pilot Project Quarterly Pilot Project Report Second Quarter 2025, Atlantic Richfield Company, Montana Resources, Llc

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Preliminary (30%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated July 28, 2025), Emma Rott Sep 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Preliminary (30%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated July 28, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Epa Comments Dated September 29, 2025 For The Blacktail Creek Riparian Actions Draft Preliminary (30%) Remedial Design Report, Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Montana Department Of Environmental Quality Sep 2025

Response To Epa Comments Dated September 29, 2025 For The Blacktail Creek Riparian Actions Draft Preliminary (30%) Remedial Design Report, Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Montana Department Of Environmental Quality

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap): Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Sep 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap): Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Condition Approval Letter For Bpsou Draft Final Phase I Design Investigation Evaluation Report, Blacktail Creek Riparian Actions (Dated May 2, 2025, Received July 28, 2025), Emma Rott Sep 2025

Re: Condition Approval Letter For Bpsou Draft Final Phase I Design Investigation Evaluation Report, Blacktail Creek Riparian Actions (Dated May 2, 2025, Received July 28, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Butte Priority Soils (Bpsou) Draft Blacktail Creek Riparian Actions Remedial Design Work Plan (Dated May 1, 2025, Received July 28, 2025), Emma Rott Sep 2025

Re: Conditional Approval Letter For Butte Priority Soils (Bpsou) Draft Blacktail Creek Riparian Actions Remedial Design Work Plan (Dated May 1, 2025, Received July 28, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Sep 2025

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Unraveling Crop Nitrogen-Water Dynamics With Hyperspectral-Thermal Sensing In Northern Central Valley, California, Shahryar Fazli, Surendra Maharjan, Wenzhao Li, Joshua B. Fisher, Rejoice Thomas, Fernando Romero Galvan, Gabriela Shirkey, Hesham El-Askary Sep 2025

Unraveling Crop Nitrogen-Water Dynamics With Hyperspectral-Thermal Sensing In Northern Central Valley, California, Shahryar Fazli, Surendra Maharjan, Wenzhao Li, Joshua B. Fisher, Rejoice Thomas, Fernando Romero Galvan, Gabriela Shirkey, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Ensuring global food security in the face of climate change requires optimizing crop water use and nutrient management. This study investigates the relationship between canopy nitrogen (N) and evapotranspiration (ET) across sunflower, rice, walnut, alfalfa, and plum crops using advanced remote sensing technologies. High-resolution hyperspectral data from NASAs Earth Surface Mineral Dust Source Investigation (EMIT) and thermal multispectral data from the Landsat-based OpenET system were analyzed over 1,135 km2 in California. Regression analysis revealed strong spatial association between canopy N and ET for sunflower (R2 = 0.82), rice (R2 = 0.71), and walnut (R2 = 0.68), …


Re: August 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Sep 2025

Re: August 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Sep 2025

Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Stream Temperature Responses To Summer Urban Rain Events Along The Savannah River, Joseph E. Wermter, Vivian L. Turner, Max K. Appelbaum, James M. Shepherd, Jacob Z. Lott Sep 2025

Stream Temperature Responses To Summer Urban Rain Events Along The Savannah River, Joseph E. Wermter, Vivian L. Turner, Max K. Appelbaum, James M. Shepherd, Jacob Z. Lott

Journal of South Carolina Water Resources

The hydrological urban heat island (HUHI) is a recent facet of the urban heat island (UHI), describing thermal enhancement of bodies of water in response to urbanization. Although the forefront of this work has been studied for large Metropolitan areas, this effect on developing cities is currently unknown. To locally measure and quantify HUHI effects in a developing city, we utilized Multi-Radar Multi Sensor (MRMS) radar-derived rainfall data to estimate rainfall in the Augusta Metropolitan Area (AMA) and the Savannah Metropolitan Area (SMA), two developing communities adjacent to the Savannah River. We analyzed mean temperature trends of two stream gauges …


Warming Induces Unexpectedly High Soil Respiration In A Wet Tropical Forest, Tana E. Wood, Colin Tucker, Aura M. Alonso-Rodríguez, M. Isabel Loza, Iana F. Grullón-Penkova, Molly A. Cavaleri, Christine S. O'Connell, Sasha C. Reed Sep 2025

Warming Induces Unexpectedly High Soil Respiration In A Wet Tropical Forest, Tana E. Wood, Colin Tucker, Aura M. Alonso-Rodríguez, M. Isabel Loza, Iana F. Grullón-Penkova, Molly A. Cavaleri, Christine S. O'Connell, Sasha C. Reed

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Tropical forests are a dominant regulator of the global carbon cycle, exchanging more carbon dioxide with the atmosphere than any other terrestrial biome. Climate models predict unprecedented climatic warming in tropical regions in the coming decades; however, in situ field warming studies are severely lacking in tropical forests. Here we present results from an in situ warming experiment in Puerto Rico, where soil respiration responses to +4 oC warming were assessed half-hourly for a year. Soil respiration rates were 42-204% higher in warmed relative to ambient plots, representing some of the highest soil respiration rates reported for any …


Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson Sep 2025

Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran Sep 2025

Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit Draft Final Leak Infiltration Evaluation (Dated July 24, 2025), Emma Rott Sep 2025

Re: Comment Letter For Butte Priority Soils Operable Unit Draft Final Leak Infiltration Evaluation (Dated July 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated July 31, 2025), Emma Rott Sep 2025

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated July 31, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.