Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 30 of 145
Full-Text Articles in Environmental Monitoring
Re: Approval Letter For The Butte Priority Soils Operable Unit, Draft Final Unreclaimed Sites: Ur-31 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-42 Site Evaluation Summary Report (Sesr) (Dated July 22, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp) Request For Change Ur-2026-Ra-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: New And Mahoney (Ur-23) Construction Completion Report (Ccr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.