Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 30 of 121

Full-Text Articles in Environmental Monitoring

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) Dated August 26, 2026, Molly Roby Sep 2026

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) Dated August 26, 2026, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 2026 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2026

Re: 2026 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

This Butte Priority Soils Operable Unit (BPSOU) Backfill and Cover Material Quality Assurance Project Plan (QAPP) provides the procedures and protocols necessary to conduct sampling and geotechnical characterization activities on import borrow and other externally sourced materials that will be used in backfill, cover soil, or engineered caps for upcoming BPSOU remediation activities described in the BPSOU Consent Decree (CD) (referred to as BPSOU CD; EPA, 2020a) Further Remedial Elements Scope of Work (FRESOW) (Attachment C of Appendix D to the BPSOU CD), the 2020 Residential Metals Abatement Program (RMAP) Unilateral Administrative Order (UAO) Amendment (EPA, 2020a), and ongoing maintenance …


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).

This Quality Assurance Project Plan (QAPP) …


2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).

This Quality Assurance Project Plan (QAPP) …


Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran Aug 2026

Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 1, 2026), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 1, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2026

Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby May 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott May 2026

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. May 2026

2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc. May 2026

Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated April 16, 2026), Emma Rott May 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated April 16, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated May 6, 2026), Emma Rott May 2026

Re: Conditional Approval Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated May 6, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan And Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Dated April 7, 2026), Emma Rott May 2026

Re: Conditional Approval Letter For Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan And Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Dated April 7, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran May 2026

Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott Apr 2026

Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty Apr 2026

Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc. Apr 2026

Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Https://Digitalcommons.Mtech.Edu/Superfund_Silverbowbutte/1787/, Josh Bryson Feb 2026

Https://Digitalcommons.Mtech.Edu/Superfund_Silverbowbutte/1787/, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.