Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 31 - 60 of 7617

Full-Text Articles in Environmental Monitoring

Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Molly Roby Oct 2026

Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc. Oct 2026

Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026), Emma Rott Oct 2026

Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Molly Roby Oct 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Hydraulic Capacity Improvements Interim Operations And Water Management Plan (Dated September 18, 2026), Emma Rott Oct 2026

Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Hydraulic Capacity Improvements Interim Operations And Water Management Plan (Dated September 18, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon, Molly Roby Oct 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Revision October 2026, Josh Bryson Oct 2026

Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Revision October 2026, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Unreclaimed Sites Sampling: Ur-44 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2026

Draft Final 2024 Unreclaimed Sites Sampling: Ur-44 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty Oct 2026

Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Heavy-Duty Diesel Vehicle Deterioration: Impact Of Vehicle Age And Emission Control Technology On Nox Emissions - Preprint, Amber L. Gurecki Allen, Andrew R. Colman, Max D. Sommer, William D. Waddoups, Darrell B. Sonntag Oct 2026

Heavy-Duty Diesel Vehicle Deterioration: Impact Of Vehicle Age And Emission Control Technology On Nox Emissions - Preprint, Amber L. Gurecki Allen, Andrew R. Colman, Max D. Sommer, William D. Waddoups, Darrell B. Sonntag

FEAT Publications

Pre-print manuscript.

Abstract

This study examines the effect of aging and deterioration on NOx emissions from heavy-duty diesel trucks (HDDTs) with different emission control technologies, including Engine Control only, exhaust gas recirculation (EGR), and selective catalytic reduction (SCR). In-use tailpipe emissions were measured from 12,023 HDDTs from 13 roadside measurement campaigns conducted in California and Utah between 2008 and 2024. Vehicle registration records and the Environmental Protection Agency’s (EPA) engine certification database were used to identify engine NOx control technology. At younger ages, SCR-equipped HDDTs generally emitted significantly less NOx than non-SCR-equipped HDDTs. However, after several years …


Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area Remedy Effectiveness Evaluation Phase 1 – Draft Updated Conceptual Site Model, Woodard & Curran Oct 2026

Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area Remedy Effectiveness Evaluation Phase 1 – Draft Updated Conceptual Site Model, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran Oct 2026

Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Fisheries Science Update - Pilbara Demersal Scalefish Resource - October 2026, Department Of Primary Industries And Regional Development, Western Australia Oct 2026

Fisheries Science Update - Pilbara Demersal Scalefish Resource - October 2026, Department Of Primary Industries And Regional Development, Western Australia

Fisheries Science Updates

The Department of Primary Industries and Regional Development (DPIRD) monitors the status of Western Australia’s demersal scalefish resources by undertaking periodic stock assessments on key indicator species.

This summary provides key outcomes of the 2026 Pilbara red emperor stock assessment (Resource Assessment Report No. 12).


Resource Assessment Report No. 12: North Coast Demersal Scalefish Resource: Pilbara Red Emperor 2026 Assessment, Fabian I. Trinnie, Rubie Evans-Powell, Brett Crisafulli, S. A. Hesp, Ainslie Denham, Dion Boddington, Craig L. Skepper Oct 2026

Resource Assessment Report No. 12: North Coast Demersal Scalefish Resource: Pilbara Red Emperor 2026 Assessment, Fabian I. Trinnie, Rubie Evans-Powell, Brett Crisafulli, S. A. Hesp, Ainslie Denham, Dion Boddington, Craig L. Skepper

Resource Assessment Reports

Executive Summary

The North Coast Demersal Scalefish Resource (NCDSR) comprises ecological suites of tropical demersal fish species that occur predominantly in inshore (20–250 m deep) and offshore (> 250 m deep) waters of the North Coast Bioregion (NCB). More than 60 demersal species are landed by fisheries operating in the Kimberley and Pilbara regions of the NCB each year, including higher-valued species, such as red emperor (Lutjanus sebae), goldband snapper (Pristipomoides multidens), rankin cod (Epinephelus rankini), and ruby snapper (Etelis boweni), and lower-valued species, such as bluespotted emperor (Lethrinus punctulatus).

The Pilbara Demersal Scalefish Resource (PDSR) is harvested by the …


Draft Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Stantec Consulting Services, Inc. Oct 2026

Draft Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quality Assurance Project Plan - Spokane River Pfas Study, Chad Pritchard Oct 2026

Quality Assurance Project Plan - Spokane River Pfas Study, Chad Pritchard

EWU PFAS Research Collection

Assessing the impacts of poly- and perfluoroalkyl substances (PFAS) contamination across multiple aquifers and multiple sources requires a detailed understanding of the hydrogeologic framework to quantifiably determine PFAS sources. The West Plains of eastern Washington is an ideal natural laboratory to study the fate and transport of PFAS because the general geohydrologic framework has been established and collaboration with several related PFAS projects will maximize the use of grant funds. This project will help the population, environment, and commercial entities of the West Plains by building a transport model, delineating PFAS contamination, and using unique PFAS distribution at different locations …


Uncontrolled Surface Flow Areas Drainage K Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage K Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Uncontrolled Surface Flow Areas Drainage G Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage G Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Uncontrolled Surface Flow Areas Drainage I Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage I Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Uncontrolled Surface Flow Areas Drainage J Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage J Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Uncontrolled Surface Flow Areas Drainage F Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage F Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Operations And Maintenance Report Grove Gulch Sedimentation Bay For Third Quarter 2026 And Post-Storm 09.22.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2026

Operations And Maintenance Report Grove Gulch Sedimentation Bay For Third Quarter 2026 And Post-Storm 09.22.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2026, Pioneer Technical Services, Inc. Sep 2026

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2026, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Node-Adaptive Meta Graph Learning Framework For Smart Energy Systems-Digitalizing Wildfire Risk Assessment In Renewable-Integrated Grids, Junde Chen, Wenzhao Li, Rejoice Thomas, Polukh Polukhov, Hesham El-Askary Sep 2026

A Node-Adaptive Meta Graph Learning Framework For Smart Energy Systems-Digitalizing Wildfire Risk Assessment In Renewable-Integrated Grids, Junde Chen, Wenzhao Li, Rejoice Thomas, Polukh Polukhov, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Wildfires pose escalating threats to the resilience of modern power delivery networks, which are increasingly evolving into complex Cyber-Physical Systems (CPS). In these systems, localized infrastructure damage can precipitate catastrophic large-scale outages and cascading failures. Conventional wildfire risk indices, developed for ecological and community safety, fail to account for the geospatial dependencies and operational context relevant to electricity infrastructure. To bridge this gap, we establish a risk assessment framework that converts meteorological variables into a grid-centric Fire Danger Weather Index (FDWI) and propose the Node-Adaptive Meta Graph Convolutional Recurrent Network (NM-GCRN), a highly efficient AI/ML architecture designed to generate fine-grained, …