Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 271 - 300 of 7480

Full-Text Articles in Environmental Monitoring

Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran May 2026

Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Silver Bow Creek Conservation Area Materials Management Plan, Pioneer Technical Services, Inc. May 2026

Final Silver Bow Creek Conservation Area Materials Management Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc. May 2026

Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Construction Impacts On Nutrient Loads In An Urban Stream In The Ozark Highlands, Matthew B. Wilson May 2026

Construction Impacts On Nutrient Loads In An Urban Stream In The Ozark Highlands, Matthew B. Wilson

Crop, Soil and Environmental Sciences Undergraduate Honors Theses

Degradation of water quality is primarily caused by human activity, including urbanization. Urban stream syndrome can be characterized as a stream that has undergone physical, chemical, and biological changes as a result of urbanization, which can include an influx of nutrients that can drive unwanted plant and algae growth. It is known that construction can result in untreated nutrients entering a stream; however, it is not understood how construction affects downstream nutrient transport. The objective of this study was to understand the impacts of construction on urban water quality in Tanglewood Branch in Fayetteville, Arkansas, in the Ozark Highlands, which …


Enhancing Walleye (Ogaa) Recruitment: Evaluating Assisted Reproduction As A Mitigation Strategy, Douglass Keiser May 2026

Enhancing Walleye (Ogaa) Recruitment: Evaluating Assisted Reproduction As A Mitigation Strategy, Douglass Keiser

Biology Graduate Theses

Over the past several decades, cold- and cool-water fish populations across the Upper Midwest, including Minnesota and Wisconsin, have shown troubling signs of decline. Among the most affected is the walleye/Ogaa (Sander vitreus), a species deeply embedded in the ecological balance, cultural identity, and economic vitality of the region, and central to the lifeways, treaty-reserved rights, and resource stewardship of Tribal Nations, including Ojibwe communities across the Upper Midwest. Despite ongoing stocking efforts and harvest regulations, many lake systems have experienced persistent declines in natural recruitment, prompting resource agencies to investigate the underlying causes. One such system is …


Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc. May 2026

Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Ai-Driven Multispectral Drone Monitoring For Afforestation In Arid Environments, Hesham Morgan, Ali Elgendy, Brandon Tran, Tamer Ismail, Mohamed M. Moursy, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Mubarak, Khaled Allam Harhash, Hesham El-Askary Apr 2026

Ai-Driven Multispectral Drone Monitoring For Afforestation In Arid Environments, Hesham Morgan, Ali Elgendy, Brandon Tran, Tamer Ismail, Mohamed M. Moursy, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Mubarak, Khaled Allam Harhash, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Monitoring large-scale afforestation projects in arid and semi-arid environments requires accurate, high-resolution, and repeatable methods to assess tree survival and growth. In this study, we integrated unmanned aerial vehicle (UAV) multispectral imaging with an advanced object detection framework to evaluate vegetation establishment in the Shuayb Al-Budai afforestation site, part of the Imam Turki bin Abdullah Royal Natural Reserve, Kingdom of Saudi Arabia (KSA). Multispectral datasets were acquired using a MicaSense Altum-PT sensor and processed through a masked Region-based Convolutional Neural Network (RCNN) with two backbone architectures: ResNet-101 and VGG19-BN. The Mask R-CNN–ResNet-101 model achieved superior performance, with an overall accuracy …


Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott Apr 2026

Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Warming Climate Amplifies Vapor Pressure Deficit Limits On Gross Primary Productivity, Shiqin Xu, Nate G. Mcdowell, Tim R. Mcvicar, Diego G. Miralles, Stephen Sitch, Pablo Sanchez-Martinez, Joshua B. Fisher, Pierre Friedlingstein, Hylke E. Beck, Matthew F. Mccabe Apr 2026

Warming Climate Amplifies Vapor Pressure Deficit Limits On Gross Primary Productivity, Shiqin Xu, Nate G. Mcdowell, Tim R. Mcvicar, Diego G. Miralles, Stephen Sitch, Pablo Sanchez-Martinez, Joshua B. Fisher, Pierre Friedlingstein, Hylke E. Beck, Matthew F. Mccabe

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Ongoing climate warming may profoundly impact terrestrial gross primary productivity (GPP), a key component of the global carbon cycle. However, uncertainty in the relative roles of atmospheric water demand (vapor pressure deficit, VPD) and root-zone soil moisture (SM) limits predictions of drought impacts on GPP. Here, we show that growing-season GPP was more strongly constrained by VPD than SM globally, based on observation-constrained model estimates, satellite retrievals and Dynamic Global Vegetation Model simulations. The importance of VPD increased with higher temperatures and more severe and prolonged droughts. This pattern reflects VPD’s critical role in regulating stomatal conductance and plant hydraulic …


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby Apr 2026

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty Apr 2026

Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc. Apr 2026

Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott Apr 2026

Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott Apr 2026

Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Diggings East 95 % Remedial Design Package Submittal (Dated March 25, 2006), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated March 25, 2026), The Butte Priority Soils Operable Unit (Bpsou) Sbcca Operations And Maintenance (O&M) Plan (Dated March 24, 2026), And The Sbcca Final Principles For A Greener Cleanup Report (Dated February 4, 2026), Emma Rott Apr 2026

Re: Conditional Approval Letter For Diggings East 95 % Remedial Design Package Submittal (Dated March 25, 2006), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated March 25, 2026), The Butte Priority Soils Operable Unit (Bpsou) Sbcca Operations And Maintenance (O&M) Plan (Dated March 24, 2026), And The Sbcca Final Principles For A Greener Cleanup Report (Dated February 4, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott Apr 2026

Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott Apr 2026

Re: Approval Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Apr 2026

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Apr 2026

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exploring Alternate Methods Of Flood Output Estimation During Natural Disasters, Finley Gardner Apr 2026

Exploring Alternate Methods Of Flood Output Estimation During Natural Disasters, Finley Gardner

Honors College Theses

In April of 2025, extreme flooding damaged many homes and buildings of people across Kentucky. The Federal Emergency Management Agency (FEMA) produces maps that show the potential for flooding in areas around water bodies, but many of the April flooding damaged areas were well outside of the FEMA classification zones. The main purpose of this thesis research was to create an accurate model of potential flood extent in Kentucky and compare it to FEMA maps. This model did not require extensive computing power and produced a map that accurately depicted flood extent through the use of Digital Elevation Model (DEM) …


Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott Apr 2026

Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Apr 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc. Apr 2026

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc. Apr 2026

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Recent Wetland Elevation Dynamics In Coastal Louisiana, Usa, Elizabeth Harris Apr 2026

Recent Wetland Elevation Dynamics In Coastal Louisiana, Usa, Elizabeth Harris

LSU Master's Theses

Coastal marshes globally are increasingly vulnerable to accelerating relative sea-level rise (RSLR), which threatens their capacity to maintain elevation through feedbacks among sediment supply, vegetation productivity, hydrology, and soil processes. Although many marshes can persist under moderate rates of sea-level rise through vertical accretion and belowground biomass production, this resilience is strongly constrained by sediment availability and subsurface processes such as autocompaction and organic matter decomposition. High accretion is often assumed to confer marsh resilience; however, subsurface processes, particularly autocompaction driven by surface loading, can substantially offset elevation gains. Coastal Louisiana experiences among the highest rates of RSLR worldwide due …