Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 2371 - 2400 of 7493

Full-Text Articles in Environmental Monitoring

An Economical And Repeatable Method For Mapping Shade Cast On Water Channels, Eric M. Nielsen Aug 2022

An Economical And Repeatable Method For Mapping Shade Cast On Water Channels, Eric M. Nielsen

Institute for Natural Resources Publications

The motivation of this work is to provide insights toward determining a viable strategy for statewide monitoring of riparian vegetation condition, with particular focus on developing a repeatable, costeffective method for assessment of progress toward achieving temperature-based water quality standards mandated by the federal Clean Water Act. A reliable monitoring strategy could in turn support a datadriven prioritization and assessment framework to increase the efficiency, effectiveness and accountability of riparian restoration efforts. In this project we developed and tested a method for mapping shade cast on water channels by riparian vegetation using optical imagery sources that are affordable and regularly …


Ocean Wave Prediction And Characterization For Intelligent Maritime Transportation, Pujan Pokhrel Aug 2022

Ocean Wave Prediction And Characterization For Intelligent Maritime Transportation, Pujan Pokhrel

LSU New Orleans Theses and Dissertations

The national Earth System Prediction (ESPC) initiative aims to develop the predictions
for the next generation predictions of atmosphere, ocean, and sea-ice interactions in the scale of days to decades. This dissertation seeks to demonstrate the methods we can use to improve the ESPC models, especially the ocean prediction model. In the application side of the weather forecasts, this dissertation explores imitation learning with constraints to solve combinatorial optimization problems, focusing on the weather routing of surface vessels. Prediction of ocean waves is essential for various purposes, including vessel routing, ocean energy harvesting, agriculture, etc. Since the machine learning approaches …


Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc. Aug 2022

Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc. Aug 2022

Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epbc 2010/5491: Weaber Plain Development Project Annual Environmental Report - 1st May 2021 To 30th April 2022, Department Of Primary Industries And Regional Development, Western Australia, Kimberley Boab Consulting Aug 2022

Epbc 2010/5491: Weaber Plain Development Project Annual Environmental Report - 1st May 2021 To 30th April 2022, Department Of Primary Industries And Regional Development, Western Australia, Kimberley Boab Consulting

Irrigated Agricultural Development in the North

This Weaber Plain Development Project EPBC Annual Environment Report for the period 1 May 2021 to 30 April 2022 has been developed in accordance with Condition 3 of the Commonwealth Environmental Approval for the Weaber Plain Development Project, EPBC 2010/5491, issued under the Environment Protection and Biodiversity Conservation (EPBC) Act 1999.

The Western Australian Government, Kimberley Agricultural Investment Pty Ltd (KAI) and the Yawoorroong Miriuwung Gajerrong Yirrgeb Noong Dawang Aboriginal Corporation (MG Corp) are completing farm development and conducting irrigated agriculture across the Weaber Plain, north of Kununurra in the eastern Kimberley region of WA.

This report has been prepared …


Genomic Analysis And Characterization Of Surface Properties Of Naphthalene Degrading Acinetobacter Isolates, Gunn Emilie Berge Aug 2022

Genomic Analysis And Characterization Of Surface Properties Of Naphthalene Degrading Acinetobacter Isolates, Gunn Emilie Berge

Graduate Theses and Dissertations (2019 - present)

No abstract provided.


Development Of A Water Quality Index Calculation Tool Using Excel, Rowan Mccarthy, Mohammad Iqbal Ph.D. Jul 2022

Development Of A Water Quality Index Calculation Tool Using Excel, Rowan Mccarthy, Mohammad Iqbal Ph.D.

Summer Undergraduate Research Program (SURP) Symposium

With many parameters by which water can be measured, it can be difficult to understand whether water is high quality or low quality. To solve this problem, many water quality indices have been developed over the last 60 years. The UNI Hydrology Lab uses the National Sanitation Foundation Water Quality Index (NSFWQI). This index provides a methodology by which Dissolved Oxygen, Fecal Coliform, pH, Biochemical Oxygen Demand, Temperature Change, Total Phosphate, Nitrate, Turbidity, and Total Solids can be combined to provide a single number indicative of the overall water quality. In previous years, when WQI calculations were needed, the bulk …


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike Mcanulty Jul 2022

Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty Jul 2022

Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jul 2022

Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Coupling Dendrochronology And Remote Sensing Techniques To Assess The Biophysical Traits Of Juniperus Virginiana And Pinus Ponderosa Within Grassland Communities In The Semi-Arid Grasslands Of The Nebraska Sandhills, Reece Allen Jul 2022

Coupling Dendrochronology And Remote Sensing Techniques To Assess The Biophysical Traits Of Juniperus Virginiana And Pinus Ponderosa Within Grassland Communities In The Semi-Arid Grasslands Of The Nebraska Sandhills, Reece Allen

School of Natural Resources: Dissertations, Theses, and Student Research

Woody species encroachment is occurring within the sandhills region in Nebraska, primarily driven by Juniperus virginiana and Pinus ponderosa, altering ecosystems and the services they provide. Effective, low cost, and cross-scale monitoring of woody species growth and performance is necessary for integrated grassland and forest management in the face of climate variability and change. In this study, we sought to establish a relationship between remote sensing-derived vegetation indices (VIs) and dendrochronological (raw and standardized tree ring width) measurements to assess the performance of encroaching woody J. virginiana and P. ponderosa located within the Nebraska National Forest in the sandhills. …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene Jul 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Jul 2022

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill (Dated July 14, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill (Dated July 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene Jul 2022

Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2022

Draft Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline., Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Draft Final 2021 Unreclaimed Site Investigation: Xrf To Laboratory Correlation And Regression Analyses Procedure (Dated May 16, 2022), Nikia Greene Jul 2022

Comment Letter For The Draft Final 2021 Unreclaimed Site Investigation: Xrf To Laboratory Correlation And Regression Analyses Procedure (Dated May 16, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Reduction Works (Brw) Phase I Qapp, Pioneer Technical Services, Inc., Nikia Greene Jul 2022

Final Butte Reduction Works (Brw) Phase I Qapp, Pioneer Technical Services, Inc., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Jul 2022

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2021, Pioneer Technical Services, Inc. Jul 2022

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2021, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.