Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1831 - 1860 of 7480

Full-Text Articles in Environmental Monitoring

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene Jul 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene Jul 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Jul 2023

2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – West Elementary School (May 22, 2023), Nikia Greene Jul 2023

Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – West Elementary School (May 22, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – West Elementary School (May 22, 2023), Nikia Greene Jul 2023

Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – West Elementary School (May 22, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) School Soil Sampling Field Sampling Plan (Fsp) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc. Jul 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) School Soil Sampling Field Sampling Plan (Fsp) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo South And Bres No 174 – Buffalo Ditch, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo South And Bres No 174 – Buffalo Ditch, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene Jul 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene Jul 2023

Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene Jul 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed (Ir) Sites Colorado Dump – West Lot Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Jul 2023

Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed (Ir) Sites Colorado Dump – West Lot Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Waterbody Size Predicts Bank- And Boat-Angler Efforts, Derek S. Kane, Kevin L. Pope, Keith D. Koupal, Mark A. Pegg, Christopher J. Chizinski, Mark A. Kaemingk Jul 2023

Waterbody Size Predicts Bank- And Boat-Angler Efforts, Derek S. Kane, Kevin L. Pope, Keith D. Koupal, Mark A. Pegg, Christopher J. Chizinski, Mark A. Kaemingk

Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications

Bank- and boat-angler efforts are logistically difficult and costly to estimate, preventing landscape-scale estimates that are required to address current and future challenges (e.g., climate change, invasive species) for inland recreational fisheries. Using a large Nebraska, USA, recreational fishery dataset (N = 67 waterbodies), we demonstrate that waterbody size can be used to predict bank- and boat-angler efforts across a heterogeneous landscape of extra small (< 104 ha) and large (> 647 ha) waterbodies. Bank and boat anglers respond to waterbody size, however these relationships appear to be unique between the two angler types. Boat-angler efforts increased as a function of waterbody size, whereas bank-angler …


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Field Sampling Plan (Fsp) Submittal #10 [Covering Original Mine Yard] (Dated July 14, 2023), Nikia Greene Jul 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Field Sampling Plan (Fsp) Submittal #10 [Covering Original Mine Yard] (Dated July 14, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023), Nikia Greene Jul 2023

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023), Nikia Greene Jul 2023

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The Relationship Between Water Temperature And Proximity To Surface Urban Heat Islands Within The Lower Chesapeake Bay Watershed For The Summer Of 2019, Sarah Kerner Jul 2023

The Relationship Between Water Temperature And Proximity To Surface Urban Heat Islands Within The Lower Chesapeake Bay Watershed For The Summer Of 2019, Sarah Kerner

Departmental Honors & Graduate Capstone Projects

Surface urban heat islands (SUHIs) are land surfaces with high concentrations of impervious surfaces like roofs, roads, sidewalks and other infrastructures that trap, absorb, and re-emit heat throughout the day/night and typically present higher temperatures than their surrounding rural areas. In this study, I evaluate how presence of and distance to SUHIs are associated with water temperature in the lower Chesapeake Bay watershed for the summer of 2019. When heavy precipitation events occur, flooding creates stormwater runoff, which is exposed to the hotter temperatures in urban areas. This introduces thermal pollution to nearby rivers and streams disrupting aquatic ecosystems. The …


Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. Jul 2023

Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #10 [Original Mine Yard], Pioneer Technical Services, Inc. Jul 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #10 [Original Mine Yard], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 (Covering Goldhill Lutheran Church [Creativity Factory Preschool] And United Congregational [Crayon Academy Preschool]) (Dated June 30, 2023), Nikia Greene Jul 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 (Covering Goldhill Lutheran Church [Creativity Factory Preschool] And United Congregational [Crayon Academy Preschool]) (Dated June 30, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit, Superfund Stormwater Operation And Maintenance (O&M); Mountain Con Sw Channel Diversion, Request For Change (Rfc)-Bsb Sitewide-2023-001 (Dated June 29, 2023), Nikia Greene Jul 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit, Superfund Stormwater Operation And Maintenance (O&M); Mountain Con Sw Channel Diversion, Request For Change (Rfc)-Bsb Sitewide-2023-001 (Dated June 29, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Field Xrf To Laboratory Correlation And Regression Analysis Procedure For Unreclaimed (Ur) And Insufficiently Reclaimed (Ir) Sites, Mike Mcanulty, Pioneer Technical Services, Inc. Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Field Xrf To Laboratory Correlation And Regression Analysis Procedure For Unreclaimed (Ur) And Insufficiently Reclaimed (Ir) Sites, Mike Mcanulty, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Gouldian Finch Monitoring: Foraging Activity And Grass Phenology - Goomig Project 2022 To 2023, J Graff Jul 2023

Gouldian Finch Monitoring: Foraging Activity And Grass Phenology - Goomig Project 2022 To 2023, J Graff

Irrigated Agricultural Development in the North

The Goomig Project (Weaber Plains Development Project) is an irrigated agricultural development located approximately 30 km north of Kununurra, which involves clearing of approximately 9,260 ha of vegetation for agriculture. Approximately 11,470 ha of native vegetation surrounding, or remaining between, the cleared areas is designated as a buffer area (the study area) to be managed to protect surrounding conservation reserves and watercourses (Strategen 2014). Monitoring of Gouldian Finch wet season foraging activity and phenology and productivity of grasses important for foraging in the buffer area during ongoing operation are required as conditions of the approval for the project, and is …


Droughtscape, Summer 2023, National Drought Mitigation Center Jul 2023

Droughtscape, Summer 2023, National Drought Mitigation Center

DroughtScape: Quarterly Newsletter of the National Drought Mitigation Center (2007–2023)

DroughtScape, Summer 2023


Monitoring Dam Stability Using Psi And Sbas Analysis, Rejoice Thomas, Wenzhao Li, Shahryar Fazli, Nikolay Grisel Todorov, Hesham El-Askary Jul 2023

Monitoring Dam Stability Using Psi And Sbas Analysis, Rejoice Thomas, Wenzhao Li, Shahryar Fazli, Nikolay Grisel Todorov, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Water preservation and maximization of its efficient use is key in areas facing water scarcity like California. One of the most important resources available to us are dams, which are useful to address a variety of needs like water supply, flood control, and maintaining environmental flows. However, if not managed properly, dams can be disastrous to humans and wildlife alike, different water species, habitats, and even impact water quality for a region. In this context, we have used newer Synthetic Aperture Radar Interferometry techniques like Persistent Scatterer Interferometry (PSI) and Small Baseline Subset (SBAS) to estimate the displacement rates at …


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc. Jun 2023

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.