Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1771 - 1800 of 7480

Full-Text Articles in Environmental Monitoring

Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023, Nikia Greene Aug 2023

Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02, Josh Bryson Aug 2023

Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Detection And Identification Of Pre-Seismic Thermal Anomalies In Cloudy Conditions Associated With The 2022 Luding (China) Mw 6.6 Earthquake, Feng Jing, Meng Jiang, Lu Zhang, Ramesh P. Singh Aug 2023

Detection And Identification Of Pre-Seismic Thermal Anomalies In Cloudy Conditions Associated With The 2022 Luding (China) Mw 6.6 Earthquake, Feng Jing, Meng Jiang, Lu Zhang, Ramesh P. Singh

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Over the past three decades, thermal anomalies from satellite infrared data have been widely discussed and associated with earthquakes. Besides infrared satellite data, the recent use of passive microwave satellite data has emerged as an important dataset to detect the potential thermal anomalies prior to earthquakes in all weather conditions due to its capability to monitor the earth in cloudy and foggy conditions and has been applied to the numerous strong earthquake events around the world. On 5 September 2022, an Mw 6.6 earthquake occurred in Luding county, nearby Mt. Gongga, China, with heavy cloud coverage over the epicenter and …


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Approved Request For Change Bg-2023-01 To Final Bpsou Hydrocarbon Sampling And Treatability Study Quality Assurance Project Plan (Qapp), Josh Bryson Aug 2023

Final Approved Request For Change Bg-2023-01 To Final Bpsou Hydrocarbon Sampling And Treatability Study Quality Assurance Project Plan (Qapp), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene Aug 2023

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Rmap Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Rmap Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Optimizing Edge-Of-Field Water Quality Monitoring Methods To Determine The Effects Of Best Management Practices On Nutrient And Sediment Runoff, Mark Hill Aug 2023

Optimizing Edge-Of-Field Water Quality Monitoring Methods To Determine The Effects Of Best Management Practices On Nutrient And Sediment Runoff, Mark Hill

Theses and Dissertations

This study investigates the impact on water quality of combined agricultural best management practices cover crop and minimum tillage, alongside an examination of techniques used to collect those samples. Edge-of-field (EOF) water quality samples were collected from 11 working farms during a two-year paired field experiment. Results showed significant reductions in nutrient concentrations, increased discharge, and mixed findings regarding nutrient mass transport post-treatment. A suite of EOF collection techniques were compared using in-situ automated water sampling systems sampling the same runoff events. Sampling protocols influenced nutrient concentrations in composite samples, but unexpected variance in velocity sensors affected measured discharge, making …


Investigating The Impact On Private Water Supply Of Hydraulic Fracturing Communication With An Abandoned Conventional Gas Well In New Freeport, Pa, Kiley Miller Aug 2023

Investigating The Impact On Private Water Supply Of Hydraulic Fracturing Communication With An Abandoned Conventional Gas Well In New Freeport, Pa, Kiley Miller

Electronic Theses and Dissertations

In June of 2022 a “frac out” occurred in New Freeport, PA when an unconventional gas well under development by hydraulic fracturing, communicated with an abandoned gas well to the surface. An initial “zone of impact” encompassed much of the town’s main thoroughfare. Water samples were obtained from 17 private water wells, 5 springs and 1 pond (31 total samples) and analyzed for cations, anions, and light hydrocarbons. Methane was found in 18 of the samples, both located within and outside of the “zone of impact”. Mass ratio analyses indicated contamination from both unconventional and conventional wells. Interferometric Synthetic Aperture …


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc. Aug 2023

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc. Aug 2023

2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc. Aug 2023

Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene Aug 2023

Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene Aug 2023

Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.